STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.

Slides:



Advertisements
Similar presentations
Housing Growth in Leicestershire 1 February 2008.
Advertisements

GREATER LINCOLNSHIRE GROWTH DEAL PROJECT NAME:GRANTHAM SOUTHERN RELIEF ROAD PROJECT LOCATIONSpitalgate, Grantham LEAD APPLICANTSouth Kesteven District.
LIVERPOOL’S ECOLOGICAL FRAMEWORK Jane Hayward – Liverpool City Council.
Copyright 2009 Northumberland County Council Northumberland Local Plan Core Strategy Update Riding Mill Parish Council 28 April.
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
Sustainable growth and water cycle studies Andy McConkey, principal consultant, Halcrow Paul Hickey, growth and equivalence manager, Anglian Water Gerard.
MTF Rail Development Forum
Droitwich South Ward Meeting Yew Tree Development Community Hall 29 th June 2011 Facilitated by Cllr Richard Morris Neil Pearce, Development Manager Andrew.
Wiltshire Green Infrastructure Strategy. What is green infrastructure? The Wiltshire Green Infrastructure Strategy Wiltshire’s existing green infrastructure.
LOCAL IMPACTS AROUND AIRPORTS Jon Bottomley AOA Environment Conference 28 April 2014.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
National Planning Policy Framework. 2 Planning reform: main aims Put power in the hands of communities - with policy that is radically streamlined and.
Linda K. McCarthy, Executive Director Missoula Downtown Association Missoula, Montana
COROZAL LPWG Municipal Development Plan Presentation of draft chapters 1, 2 and 3 2 nd National Workshop Belmopan, December
Settlement Boundaries Where do they come from? What do they do? What is the future?
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
Core Strategy for Central Lincolnshire The Growth Agenda Comment from Cllr Marianne Overton; Some people blame the press for the negative public view of.
1 'Eco - Town' Andy Robinson East Area Have your Say.
Presentation to the Executive of the Carlisle Partnership 13 July 2009.
Hill Place Farm East Grinstead Presentation to East Grinstead Town Council Monday 4 th August 2014.
Langdon Parish Council Site Allocation Consultation Two sites at East Langdon One site at Green Lane, Martin Mill.
Strategic Planning & the Duty to Co-operate Andrew Pritchard Director of Policy & Infrastructure.
Jonathan Wheeler Team Manager Strategic Economic Infrastructure East Sussex Strategic Partnership Local Transport Plan Update 18 th October 2013.
Partnership for Urban South Hampshire Sustainable Growth.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Climate Change Council November 2011 draft ACT Planning Strategy.
Local Transport Plan 3 Vision and Issues. The Local Transport Plan Will replace LTP2, which expires 31 March must have LTP3 approved and operative.
The evidence base for your Neighbourhood Plan Clive Keble MRTPI Planning Aid England Advisor.
Blackstone Valley Prioritization Project Blackstone River-Users Conference September 18, 2012.
What Transport for Cambridge? The Sub-Region Development Strategy and Transport Policies.
SOUTH EAST PLAN South East Plan ESPACE - reminder Aim Incorporation of adaptation to climate change within spatial planning mechanisms at local, regional,
What Transport for Cambridge? Implementing the Cambridgeshire Structure Plan Alan Barnish Chief Executive CCC.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
So Surely the Development West of Waterlooville Goes Against Government Policy? Yes it does, but there are reasons for this for the increased housing requirements.
Considering land use as a transport policy tool: A London perspective Isabel Dedring, Transport for London IMPACTS Vienna, March 2006.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
National Planning Policy Framework Based on Consultation ended 17 th October Issues affecting Local Councils.
Welcome and Introduction to GNTP Forum Councillor Jane Urquhart Portfolio Holder for Transport and Area Working Nottingham City Council.
21st October 2015 Stillorgan Village Area Movement Framework Plan PUBLIC CONSULTATION INFORMATION PERIOD DOCUMENT.
SWIFT NETWORKING MEETING: NEW EASTERN VILLAGES (NEV) 24th September 2015 Samantha Howell Strategic Allocations Planning Manager and NEV Programme Lead.
Neighbourhood Development Plan December 1 st, 2013.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
San Diego Regional Comprehensive Plan Presentation to Senate Transportation and Housing Committee February 8, 2005.
Salford Core Strategy Eccles Political Executive Briefing 14 November 2008.
Little Chalfont Community Association Little Chalfont Parish Council 0.
Herefordshire Local Plan Members’ Seminar 9 October 2015.
Nigel Hannam and David Phillips Parish Conference – 11th September 2013 Balancing Development.
Strategic Planning in Cambridgeshire and Peterborough Councillor Peter Moakes Chair, Joint Strategic Planning & Transport Member Group John Williamson.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
HAVE YOUR SAY! Six week consultation period 15th February - 28th March 2016 DRAFT UTTOXETER NEIGHBOURHOOD PLAN.
‘People, Homes and Jobs’ Local Plan Consultation 2015 PPCLG 27 January 2016.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
Woodford Neighbourhood Forum 1. 2 This presentation is a brief summary of the work of WNF. It is supported by two circulated documents The Annual Progress.
12 th April  What is it?  Why now?  Who’s doing it?  What are the benefits?  What will the plan look like?  How is it done?
Greater Nottingham Aligned Core Strategies Option for Consultation (15 th February until 12 th April 2010) Karen Shaw Nottingham City Council.
Enhanced Employment Lands for Simcoe County A Rationale to Expand Innisfil Heights 1 John Skorobohacz, CAO Andy Campbell, Director Infrastructure 15 August.
19th November 2015 Wealden Local Plan – Issues, Options and Recommendations East Hoathly with Halland Parish Council.
New Economy Breakfast Briefing 6 December 2016
Strategic Transport Forum Friday 15th September 2017
Western Orbital Local Liaison Forum 11TH September 2017.
Cambourne to Cambridge
Draft Babergh Mid Suffolk Joint Local Plan
VicRoads – Movement & Place
The Regeneration of Swanley
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
VicRoads – Movement & Place
New Southwark Plan: Area Visions and Site Allocations Consultation
Presentation transcript:

STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER 2015

THE CONTEXT Capacity and limits to growth study commissioned for Grantham in early 2015 Similar exercise commissioned for Stamford in summer 2015 Aim- to determine extent of land at urban edge suitable in principle for residential and employment development Capacity of urban/infill/brownfield sites captured through other work – this will be considered alongside the findings of this study Both studies are just the start of the process, the next steps include consideration of the impact of development on existing infrastructure …as well as full consultation to ensure local opinion informs decisions on allocation of land for any development

STUDY SCOPE AND OBJECTIVES Study focuses on suitability of land for development No upper limit or ‘target’ on extent of land Extensions to Stamford only- not other settlements ‘Border-blind’ approach Opportunities assessed alongside constraints Technical, impartial and objective assessment

CONSULTATION Anglian Water Historic England Environment Agency Highways England Homes and Communities Agency Lincolnshire County Council (covering infrastructure, education, highways, minerals and waste and flood risk) Lincolnshire Local Economic Partnership Greater Cambridge Greater Peterborough Local Economic Partnership Natural England Western Power Distribution.

METHOD AECOM technical specialists contributed (transport, ground conditions, flood risk, landscape, heritage, infrastructure, economics) Study divided into Part A (strategic considerations), followed by Part B (specific considerations) Part A divided land at urban edge into Directions for Growth, then assessed each Direction using a traffic-light approach Part A reduced the suitable land down to smaller areas which were assessed in more detail through Part B Part B, informed by site visits, enabled detailed judgements on land suitability by location, resulting in drafting boundaries of suitable land

PART A: STRATEGIC ASSESSMENT

DIRECTIONS FOR GROWTH

DIRECTIONS FOR GROWTH- FLOOD RISK

DIRECTIONS FOR GROWTH- ENVIRONMENTAL

DIRECTIONS FOR GROWTH- AGRICULTURAL LAND

DIRECTIONS FOR GROWTH- HERITAGE ASSETS

DIRECTIONS FOR GROWTH: TRANSPORT Issues considered in the transport assessment included: Configuration, capacity and quality of existing transport networks and facilities, linking potential growth areas to the town centre and adjacent communities and vice versa Corridors and nodes presenting opportunities for extension or enhancement based on travel patterns associated with the planned growth. Accessibility (including on foot and by cycle), public transport routes and their potential capacity and constraints, and the location of potential growth sites in terms of their ability to be served by all modes of travel, but with an emphasis on minimising travel by car. Results of stakeholder consultation

TRAFFIC LIGHT ASSESSMENTS

PART A: SUMMARY OF TRANSPORT RESULTS Direction A – supported by Lincolnshire CC. Impacts on A1/A606 junction and A1/Town centre with SUE already planned. Amber rating. Direction B – supported by Highways England (HE), LCC and Greater Cambridge LEP. Green rating. Direction C – supported by HE but not by LCC due to lack of access to the A1. Impacts on A1/A606 and A1/A43 junctions. Amber rating. Direction D – supported by HE. LCC state that road connections from the south into Stamford town centre are poor. Amber rating. Direction E - LCC raise concerns that there is limited vehicular access to town centre, however good access to A1. Not supported by HE. Impacts on A1/A606 junction and A1/Town centre with SUE already planned. Amber rating. Direction F – Growth would impact on operation of A1 link and A1/A606. Not supported by HE or LCC – A1 would create a barrier with existing urban area. Amber rating. Direction G - Less impact on town centre and enabled by minor improvements to the road network. Growth would impact on A1 link and A1/A606. Not supported by HE or LCC for same reasons as Direction F. Favourable direction of growth for the Greater Cambridge LEP. Amber rating.

RESULTS OF PART A

PART B- AREA 1

PART B- AREA 2

PART B- AREA 3

PART B- AREA 4

PART B- AREA 5

PART B- OVERALL CONCLUSION

In total, 176 hectares of land considered suitable in principle for residential and/or employment development Most appropriate indicative density on this scale is around 25 dwellings per hectare Therefore, capacity was found for 4,399 dwellings Capacity for 26.5 hectares of employment development Site TypeResidential (hectares) Residential (dwellings) Employment (hectares) Suitable sites99.832,4950 Suitable in the longer term / contingency sites , Total ,

NEXT STEPS The study sets out where Stamford COULD grow, not where it SHOULD grow Assess conclusions alongside other studies, such as Strategic Housing Market Assessment and Employment Land Review Test results through consultation on policy documents based on this study Consider any other relevant political or technical information outside the scope of this study Consider benefits of ‘clustering’ development Seek to balance new housing with new jobs Ensure close co-ordination with infrastructure providers to ensure funding is in place and impacts are clear over phases of development

STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER 2015