Charlottesville Area Transit Proposed 2012 Route Adjustments.

Slides:



Advertisements
Similar presentations
Integrated Mobility for Economic Growth The City of Pasadena.
Advertisements

Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Kern Countys Population will More than Double Growth Driven by Spillover from Southern California and Our Kids Trend: Kerns Changing Ethnicity Hispanics.
Third Avenue Skip-Stop Operations Now a Rainbow of Frequent, Efficient Service Owen Kehoe, PE, PTOE King County Metro Transit, Transportation Engineer.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
Short Range Transit Improvement Plan CITY OF HIGH POINT Sounding Board/Steering Committee Meeting Service Recommendations January 13, 2015.
City of Ashland Transportation System Plan Update September 6 th, 2012.
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Contact: Beth Morris
Mecca Roundabout Project Mecca, CA September 28, 2011.
I-35W and 46 th Street Station Concept Service Plan and Construction John Dillery & Mac Sweidan Kingfield Neighborhood Association June 2010.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Short Range Transit Improvement Plan CITY OF HIGHPOINT Sounding Board Meeting Service Recommendations September 9, 2014.
Tucson Modern Streetcar Project Overview July 15, 2011.
1 Example of How Bus Stop Inventory is Used and Issues are Addressed.
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
Finding A Place to Live and Getting Around!. Many housing options Apartment Complexes Multi Family Homes Single Family Homes Condominiums Rooms for Rent.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
1 Research go bus Impact Study TRB National Transportation Planning Applications Conference Atlantic City, May 2015.
USDOT-ECMT Workshop on Sustainable Travel November 5, 2003 Steve Heminger Executive Director Housing Incentive Program.
COTA Major Initiatives Ohio Planning Conference July 16, 2014.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
Greater Mankato Transit Redesign Study Study Overview and Initial Existing Conditions September 2011 In association with: LSA Design and Public Solutions.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
London 2012 Media Transport Hub – Bloomsbury 26 th October 2011 Ingunn Tilleraas– LOCOG Lead Bus Systems Manager.
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Service Planning and Integration Study Work Group Report 7/30/13.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
I-35W and 46 th Street Final Service Restructuring Plan.
Blueprint for Tomorrow Fairhope City Council February 9, 2008.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Birmingham – Stratford – Banbury – High Wycombe – London Marylebone Issue 30 – 5 December 2014 Service information for December 2014 Every Saturday and.
Comprehensive Operations Analysis LYNX 2013 Comprehensive Operational Analysis John Lewis, CEO.
Mercer Corridor Stakeholder Committee November 4, 2015 Sound Transit.
San Diego Trolley. Current Current/future expansion Propose extension.
Presentation to Traffic Working Group February 6, 2014.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Gastonia Transit Expansion Study City Council/Planning Commission Joint Transportation Workshop September 13, 2007.
Placer County Rural Transit Study Expanding Public Transit Service for Rural Placer County.
A PRESENTATION BY THE DISTRICT 1 COMMUITY COUNCIL SIDEWALK TO BATTLE CREEK REC.
LUAS Cross City Brendan O’Brien Roads & Traffic Department.
Lecture 2: Improving Transit Service Through Planning, Design, and Operations This lecture was originally prepared by Dr. Kari Watkins, Georgia Institute.
Regional Transit System Level of Service FY 2017 Growth Management Jeffrey Hays, AICP.
Role in a Livable Community April 5,  Over it’s 40 year history, RVTD has seen service grow in the first 20 years and steady decreases over the.
CPPJ Meeting January 27, 2014 Project Team. Lake Charles MPO - Calcasieu Parish Chapters: 1.Introduction and Transportation Planning Process 2.Regional.
Comprehensive Operational Analysis (COA) Collier Area Transit February 8, 2012 Report Findings and Recommendation s.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Greenville Downtown Intermodal Transportation Center Report to the Greenville Historic Preservation Commission October 27, 2009.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Service on Campus Monday-Friday The Province /Colony Manor Park Point/Perkins Green Route 24-Connector to Marketplace Mall and Downtown Route 68 RIT Henrietta.
PROJECT UPDATE LRT ALIGNMENT. LRT ROUTE MAP ALIGNMENT OVERVIEW B-line Primarily centre-running; segregated by curbed barrier 13 stops Majority of stops.
The Downtown Seattle Bus Monitoring System A New Way of Collecting and Analyzing Transit Travel Time Data Owen Kehoe, PE, PTOE King County Metro Transit.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Proposed Route Modifications
Comprehensive Route Network Analysis
Operations and Service Concept
Center City Connector 101.
Friday, December 16th.
Call On Toll-Free We Serve for 24*7 hours.
Comprehensive Operational Analysis (COA)
West Campus Parking Deck & Roadway Update
D Line Project Overview
M14A/D Select Bus Service
OTA Transit enhancement project
September 2019 Proposed Service Changes Public Comment Meetings
Presentation transcript:

Charlottesville Area Transit Proposed 2012 Route Adjustments

Agenda Background and Goals Major Changes –Route 3/6 separation –Route 6 –Route 4 Minor Changes –Trolley –Route 2B

Background and Goals Adjustment to changing circumstances –Growth patterns –Traffic patterns –Community needs Service efficiencies Service enhancements Timed to coincide with return of UVA students

Route 3/6 Separation Current –Routes 3 and 6 served by a single bus –Service every hour –Service every half-hour during peak Proposed –Separate routes to run every half hour, all day –Route 3 expansion to Palatine

Route 6 Ridge Street, UVA Hospital, Downtown Extended to Prospect Avenue and 9 th St. (are currently served by Route 4) Would serve Downtown at the Omni stop on Water Street –Transfer to the Trolley, 1A/B, 2A/B, 3, 7, 8, 9 and 10 UVA/JPA – transfer to 4 and outbound Trolley Earlier stops on West Main also provide access to inbound/outbound Route 7 & Trolley Service frequency increased to :30 all day

Route 4 UVA Hospital, Fry Spring Expansion of service to connect Fry Spring to Trolley and UVA routes Route 4 transfer hub will be at the UVA Hospital for the outbound Free Trolley and Route 6 Earlier stops on West Main also provide access to inbound/outbound Route 7 & Trolley No longer serve Prospect and 9 th Street (Route 6 will serve) Service frequency increased to :30 all day

Routes 4 & 6 - Existing

Routes 4 & 6 - Proposed

Minor Changes Free Trolley Closure of McCormick Bridge (over Emmet) Detour north on Alderman to Ivy 4 new stops served

Minor Changes Route 2B Expand service area at Southwood Mobile Home Park Extended to include Covenant School, Moore’s Creek and Oak Hill.

Summary Major Changes –Route 3/6 separation –Route 6 –Route 4 Minor Changes (Trolley, 2/B) More frequent service, to more areas, at no additional cost

www.catchthecat.org Facebook.com/ CharlottesvilleAreaTransit Facebook.com/ CharlottesvilleAreaTransit