1 Friday, December 16th

2 42nd Street Event Traffic Management Final Alternatives
After Canad is open and operating generating different traffic patterns

3 Alternatives Not Recommended
Additional On-Site Parking – due to cost and infrequent use Additional parking for adjacent developments should have shared arrangements Construct 17th Ave S. Overpass – Too much misdirection for cost Still needed in future Direct Access to I-29 – Against FHWA policy Access point would be 17th Ave S.

4 South Lot takes 88 Minutes to Empty

5 South Lot takes 57 Minutes to Empty

6 South Lot takes 45 Minutes to Empty
Build 43/Extend 17th

7 South Lot takes 38 Minutes to Empty

8 Event Departure Alternatives A
Table 1 Event Departure Alternatives A Exit Direction Number of Parking Spaces Number of Outbound Lanes Rate/ Lane (veh/ hour)(2) Rate/ Hour hour) Longest Exit Time (mins.) Percent reduction from Present condition B Weighted Average Exit Time (mins.) C Present Condition4-lane Exit SB on 42nd St. 2,640(1) 2 900 (2) 1,800 88(3) N/A 37 NB on 42nd St. 1,448(1) 48 Alternative 1 6-lane Exit (3-lanes South) 2,260 3 600 (1) 2,400 57 35 24 EB on 11th Ave. 550 1 900 (1) 900 36 1,025 34 29(4) Alternative 2 7-lane Exit (4-lanes South) SB 42nd St. to EB 17th Ave. 1,130 1,500 45 49 20 SB 42nd St. via 43rd St. Alternative 3 8-lane Exit (4-lanes South, 3-lanes North) 955 38 18 NB on 42nd St. via North Dwy 800 32 21 NB on 42nd St. via 11th Ave. 575(5) A All alternatives are also represented in Figures 1-4. B The percent reduction is calculated separately for the exit direction and is the time reduction for the direction using the highest exit times. C The weighted average exit time is calculated weighting the number of vehicles and the average time in takes each to exit, assuming the average departure time per vehicle is half of the longest exit time. (1) Typically, during an event that is at capacity, traffic departing from Lot 3 and the VIP lot are directed half to the north and half to the south on 42nd Street. (2) Assumes that the center left-turn lane that is temporarily used as a thru lane will only achieve 600 vph, thru lanes achieve 900 vph. Number of lanes per rate is shown in parenthesis. (3) Relates to actual observations or testimony (Backstreet Boys 71 minutes) (4) This reduction in exit time is a function of the reduced number of spaces in the north lot. It is not due to increased efficiency. (5) Assumes 225 vehicles from the VIP lot and 350 vehicles from the south parking lot (see Figure 4)

9 South Lot takes 45 Minutes to Empty
Build 43/Extend 17th Recommending this Alternative Cost ~ $0.5 M plus expand 38/32

10 Intersection of 32nd & 38th Add Turn Lanes
May need to Capture Through as Left Intersection of 32nd & 38th