AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.

Slides:



Advertisements
Similar presentations
Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Thanks to all the presenters who made this an excellent meeting 1 Meeting Summary CFS-ADI Tokyo 2014 Mike Harrison.
ILC Status Report Mike Harrison AWLC14 1 AWLC14 Fermilab May 2014 Mike Harrison.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Objectives ‒Overview the ILC cryogenics design and further optimize it, to provide reliable inputs for CFS work during the ILC preparation phase. ‒Focusing.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
More than an idea not yet a project 1 Meeting Issues & Goals CFS-ADI Tokyo 2014 Mike Harrison.
Report from ILC CFS and Cryogenics Workshop
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Strategy of detector solenoid construction Yasuhiro Sugimoto KEK 1.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
CFS-ADI Joint Meeting University of Tokyo April 8-10, 2014 Session 8 - Power Usage and Site Requirements V Kuchler, A Enomoto.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Experimental Hall in Mountain Regions
Conventional Facilities and Siting Global Group (ARCFS)
Introduction and Meeting Objectives
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
ILC CFS AD&I Daresbury Lab Summary
Tom Lackowski Revised 10/12/2011
Overview of Day One – 29 Feb 2016
Presentation transcript:

AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 CFS at AD&I Parallel Sessions e + Source – Some Adjustments but New Layout will Still Fit into Space Allotted in TDRe + Source – Some Adjustments but New Layout will Still Fit into Space Allotted in TDR Resolution of Timing Issue Will Affect Overall Tunnel Length and Many of the Other Area SystemsResolution of Timing Issue Will Affect Overall Tunnel Length and Many of the Other Area Systems Damping Ring – At this Point, No Adjustments Currently Under Consideration Would Change the Damping Ring Layout (Timing Issue)Damping Ring – At this Point, No Adjustments Currently Under Consideration Would Change the Damping Ring Layout (Timing Issue) BDS – Some Reduction in Tunnel Length May be Gained After Reviewing the Current (RDR ?) LayoutBDS – Some Reduction in Tunnel Length May be Gained After Reviewing the Current (RDR ?) Layout Further CFS Interaction with Area Systems will Continue to Resolve Issues Through Weekly CFS MeetingsFurther CFS Interaction with Area Systems will Continue to Resolve Issues Through Weekly CFS Meetings

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 CFS Joint Session with SRF for Cryogenics Talks by T Peterson, H Nakai, T Sanuki and D DelikarisTalks by T Peterson, H Nakai, T Sanuki and D Delikaris Overview of ILC Cryo Needs and RegulationsOverview of ILC Cryo Needs and Regulations Discussions of ILC Helium Capacities and Venting ParametersDiscussions of ILC Helium Capacities and Venting Parameters Overview of CERN Helium Usage and Storage StrategiesOverview of CERN Helium Usage and Storage Strategies Further Work Needed to Develop Helium System Design and Storage StrategiesFurther Work Needed to Develop Helium System Design and Storage Strategies

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 CFS Main Linac Shielding Special Session Talks by E Paterson and T SanamiTalks by E Paterson and T Sanami Current “Maximum Credible Accident” Assumption Needs ReviewCurrent “Maximum Credible Accident” Assumption Needs Review Technical Board Needs to Define a Set of Reasonable Accident ParametersTechnical Board Needs to Define a Set of Reasonable Accident Parameters Interaction with Radiation Experts and Regulators Needs to Reach a Reasonable Consensus for the ILC ProjectInteraction with Radiation Experts and Regulators Needs to Reach a Reasonable Consensus for the ILC Project

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 CFS Joint Session with MDI/BDS for Beam Commissioning Talks by G White, T Okugi, T Tauchi and Marco OriuinnoTalks by G White, T Okugi, T Tauchi and Marco Oriuinno Description of Several Beam Commissioning StrategiesDescription of Several Beam Commissioning Strategies  Initial Accelerator w/No Detector  Initial Detector  Portions of Final Focus Equipment Conclusion is that All Commissioning will be Below Full Intensity, w/o Detector Hall Occupancy and No Shielding Wall will be RequiredConclusion is that All Commissioning will be Below Full Intensity, w/o Detector Hall Occupancy and No Shielding Wall will be Required

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, CFS Joint Sessions with MDI and Detectors Talks by Y NishimotoTalks by Y Nishimoto Status of Baseline and Hybrid Asian Detector Hall Civil Design and ScheduleStatus of Baseline and Hybrid Asian Detector Hall Civil Design and Schedule Review of Heavy Equipment Transportation ExamplesReview of Heavy Equipment Transportation Examples Discussion Suggested Adjustments for Hybrid Access Alternative will be Reviewed for Cost and Schedule ImpactDiscussion Suggested Adjustments for Hybrid Access Alternative will be Reviewed for Cost and Schedule Impact T Sanuki will Lead an Investigation to Identify Optimum Detector Component Weight Restriction with Respect to Road Capacity, Preferred Route and Bridge Reinforcement RequirementsT Sanuki will Lead an Investigation to Identify Optimum Detector Component Weight Restriction with Respect to Road Capacity, Preferred Route and Bridge Reinforcement Requirements

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, CFS Joint Sessions with MDI and Detectors cont. Talks by K Buesser and M OriunnoTalks by K Buesser and M Oriunno Review of Basic Components for Both ILD and SiD DetectorsReview of Basic Components for Both ILD and SiD Detectors Review of Proposed Assembly Strategies for Both ILD and SiD DetectorsReview of Proposed Assembly Strategies for Both ILD and SiD Detectors General Discussion Regarding Optimization of Hybrid Alternative for Detector Hall AccessGeneral Discussion Regarding Optimization of Hybrid Alternative for Detector Hall Access

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 CFS Joint Session with e- and e+ Sources Talks by W Gei and T OmoriTalks by W Gei and T Omori Review and Discussion of Positron Source Space Requirements and Target StorageReview and Discussion of Positron Source Space Requirements and Target Storage Review of Conventional e+ SourceReview of Conventional e+ Source Also General Discussion Regarding Auxiliary SourceAlso General Discussion Regarding Auxiliary Source

CFS-ADI Joint Meeting - University of Tokyo - April 8-10, 2014 Other CFS Parallel Sessions The Asian Pre- Construction Planning and Schedule were Reviewed and DiscussedThe Asian Pre- Construction Planning and Schedule were Reviewed and Discussed More Detailed Cost and Manpower Estimates were Also Reviewed and Discussed for the Pre- Construction TasksMore Detailed Cost and Manpower Estimates were Also Reviewed and Discussed for the Pre- Construction Tasks Two Parallel Sessions were Devoted to Presentations and Discussions Regarding the Various Non- Experimental Functions of the KEK, DESY, CERN and FNAL Laboratories to Provide Input for the Planning of the ILC LaboratoryTwo Parallel Sessions were Devoted to Presentations and Discussions Regarding the Various Non- Experimental Functions of the KEK, DESY, CERN and FNAL Laboratories to Provide Input for the Planning of the ILC Laboratory