SVD DAQ and Overall DAQ for DESY Telescope Test Takeo Higuchi (KEK) Sep. 26 th, 2012The 2 nd PXD/SVD Joint Meeting I have a serious problem in the Internet.

Slides:



Advertisements
Similar presentations
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Advertisements

Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
DAQ Scheme and Beam Test Results H. Asano, M. Friedl, H. Hyun, T. Higuchi, C. Irmler, Z. Natkaniec, W. Ostrowicz, M. Pernicka, T. Tsubuyama.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Data Acquisition System of SVD2.0 This series of slides explains how we take normal, calibration and system test data of the SVD 2.0 and monitor the environment.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Performance of the AMT-3 Based TDC System at Belle S.Y.Suzuki, T.Higuchi, Y.Arai, K.Tauchi, M.Nakao, R.Itoh (KEK) H.Nakayama (University of Tokyo)
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
Front-end readout study for SuperKEKB IGARASHI Youichi.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
Online Reconstruction 1M.Ellis - CM th October 2008.
Takeo Higuchi (KEK); CHEP pptx High Speed Data Receiver Card for Future Upgrade of Belle II DAQ 1.Introduction – Belle II DAQ Experimental apparatus.
HIGUCHI Takeo Department of Physics, Faulty of Science, University of Tokyo Representing dBASF Development Team BELLE/CHEP20001 Distributed BELLE Analysis.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
SVD DAQ 25 Jan 2011 Belle2 DAQ T. Tsuboyama (KEK)
Report from 5th PXD DAQ Workshop Tokyo University, November 19-20, 2012 Tokyo Daigakku = „Todai“ symbol is Ginkgo leafs.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Prototype of the SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) wacek ostrowicz 14 slides The Prototype of the SVD FTB Recent.
PXD EVO Hans-Günther Moser MPI für Physik Meeting on Services and Power Supplies Aim: define the services chain form module to external racks.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
PXD ATCA DAQ Issues and Announcements S. Lange (Universität Gießen) Belle PXD and SVD Workshop Göttingen,
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
Data Acquisition of the PXD Takeo Higuchi (KEK) PXD follow up meeting on Nov.7,2010 « DISCLAIMER» Materials prepared for and presented in PXD follow up.
SHARING A HIGH SPEED OPTICAL DATA TRANSMISSION LINK WITH SLOW CONTROL STREAM TIPP2014 Amsterdam June Zhen-An LIU, Jingzhou Zhao, Dehui Sun, Trigger.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Power Supply for DEPFET in SuperBelle Pablo Vazquez IGFAE-USC Henryk Palka INP-KRA.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
B-KLM DAQ 2011/01/25 Trigger/DAQ workshop K. Sumisawa (KEK) Introduction Summary +7 pages.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
PXD DAQ News S. Lange (Univ. Gießen) Belle II Trigger/DAQ Meeting (Jan 16-18, 2012, Hawaii, USA) Today: only topics important for CDAQ - GbE Connection.
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Demo system of Belle2link Sun Dehui, Zhao Jingzhou,Liu zhen’an Trigger Lab IHEP.
News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
Status of the ECL DAQ subsystems
WBS 1.03 Readout Systems Specifications, Design and Acceptance
Markus Friedl (HEPHY Vienna)
PXD DAQ Workshop June 9 and 10, 2011 Münzenberg (near Gießen) Goals: 1
Update on the SVD construction
Discussion items SVD mechanics session.
Discussion Items Clock PC and/or VME CPU Trigger readout
DHH progress report Igor Konorov TUM, Physics Department, E18
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
The Beam Test at Fermilab:
PXD ATCA DAQ for DESY Test
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Trigger session report
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

SVD DAQ and Overall DAQ for DESY Telescope Test Takeo Higuchi (KEK) Sep. 26 th, 2012The 2 nd PXD/SVD Joint Meeting I have a serious problem in the Internet connection. Automatic Windows update made my IE malfunctioning. The slides uploaded to Indico are not the latest one, sorry.

Takeo Higuchi (KEK); PXD/SVD Joint Meeting DAQ’s Goal for the Telescope Test PXD+SVD+DAQ+TRG are to have an integrated system test at DESY in Oct to verify their whole readout scheme. Goal of the test from DAQ’s view is to establish and verify the data-size-reduction scheme using HLT feedback to the PXD-readout system based on the ATCA (named Onsen system). 2 Onsen:Japanese word meaning “hot spa”

Takeo Higuchi (KEK); PXD/SVD Joint Meeting Data Flow in the Telescope Test 3 DAQ group takes responsibility for the blue shaded region. R. Itoh

Takeo Higuchi (KEK); PXD/SVD Joint Meeting DCD DHP DHH Switcher ~20 cm m Power control Data TWP Patch panel PXD DAQ Chain 4 ATCA readout boards Opt. PS, Slow control half ladder: 768 rows x 250 cols 15x70(85) mm² Cu/opt. C. Kiesling RoI finder (HLT) RoI info. over Ethernet NW SW Reduced data Over Ethernet Trigger timing signals CAT7 Optional SVD-only HW tracker RoI info.

Takeo Higuchi (KEK); PXD/SVD Joint Meeting SVD DAQ Chain 5 x1902 readout chips (APV25) ~2m copper cables Junction box ~10m copper cables x40 (FINESSE + COPPER) ~20m opt. cables ‘FADC+PROC’ Analog-to-digital conversion, data size reduction, and hit time finding module FINESSE transmission board (FTB) Illustration by SVD group

Takeo Higuchi (KEK); PXD/SVD Joint Meeting Legends in the Following Pages 6 Red text: discussion points Blue text: responsible person’s name (I think) to the job Smiley : (almost) finalized item(s)

Takeo Higuchi (KEK); PXD/SVD Joint Meeting More Specific Chart – Layout 7 SVDPXD Converted e⁻ beam Triggering scintillator? 6GeV E peak = 2GeV I remember a magnetic field is applied in this apparatus. What strength and to which direction?

Takeo Higuchi (KEK); PXD/SVD Joint Meeting More Specific Chart – PXD Part 8 SVDPXD e⁻ test beam Triggering scintillator? DHH Trigger timing signals DHH controller ATCA readout board(s) RoI finder (HLT) DATCON RoI info. HLT latency = 5s DAQ How many ATCAs do we need? DHH card Managed by S.Lange-san et al. Managed by I.Konorov-san et al. How many DHHs do we need?

Takeo Higuchi (KEK); PXD/SVD Joint Meeting More Specific Chart – SVD Part 9 SVD (prototype products) PXD e⁻ test beam FTB DATCON RoI info. to ATCA How many FTBs and HSLBs do we need? COPPER Belle2link HSLB How many COPPERs do we need? Managed by PXD group. Managed by TH. Managed by K.Hara-san et al. Managed by Ostrowicz-san. Triggering scintillator? DAQ FTB card

Takeo Higuchi (KEK); PXD/SVD Joint Meeting More Specific Chart – TRG Part 10 SVDPXD Triggering scintillator? e⁻ test beam GT3 board Y.Iwasaki-san said the GT3 board can generate any trigger we demand. PM Level converter? TTIO TTSW Trigger for SVD (APV25)Trigger for PXD (DHH) Managed by Y.Iwasaki-san + M.Nakao-san.

Takeo Higuchi (KEK); PXD/SVD Joint Meeting DAQ Design for the Telescope Test 11 ATCA COPPER PXD SVD NW SW 100BaseT Single R/O PC should be sufficient (also responsible to boot up COPPER CPUs). Managed by TH. UDP High-Level Triggering PC farm (PXD RoI finding w/ tracking) Managed by R.Itoh-san. “Pseudo” EVB Storage Managed by R.Itoh-san. RoI info. to ATCA Managed by TH. Managed by S.Y.Suzuki-san + R.Itoh-san. UDP-packet receiver NW SW? Managed by PXD group.

Takeo Higuchi (KEK); PXD/SVD Joint Meeting RoI Finding Position and size of PXD RoIs → Who will manage? – SVD-only tracking software to run in the HLT is surely needed, even which may be a simplified version from the actual Belle II tracking software. 12

Takeo Higuchi (KEK); PXD/SVD Joint Meeting Other DAQ Items Global run control → Managed by M.Nakao-san. – PXD’s and SVD’s own run/slow controls are expected to be developed by each sub-group. Online data quality monitor → Who will manage? – Checks on data corruption and event slip. – Data contents themselves are expected to be maintained by each sub-group. We will provide an example data-unpacker class for CDC. Please utilize it. 13 How do we track (define the RoIs) in the beam test study? → Take SVD hit positions and interpolate them to PXD layers.

Takeo Higuchi (KEK); PXD/SVD Joint Meeting Challenge – POCKET DAQ 14 Mini Belle II DAQ (“POCKET DAQ”) for the telescope test – “POCKET DAQ” is a general purpose small DAQ system suitable for test experiments; “POCKET DAQ” is a shrunk version of the Belle2Link- and COPPER-based DAQ system. – We develop “POCKET DAQ” and utilize it in the telescope test. SVD R/O“POCKET DAQ” to be developed by DAQ Belle2Link

Takeo Higuchi (KEK); PXD/SVD Joint Meeting POCKET DAQ 15 Mini Belle II DAQ (“POCKET DAQ”) for the telescope test – “POCKET DAQ” is a general purpose small DAQ system suitable for test experiments; “POCKET DAQ” is a shrunk version of the Belle2Link- and COPPER-based DAQ system. – We get some fund to develop “POCKET DAQ”. Belle CDC readout COPPERs with cables

Takeo Higuchi (KEK); PXD/SVD Joint Meeting POCKET DAQ 16 Mini Belle II DAQ (“POCKET DAQ”) for the telescope test – We develop “POCKET DAQ” targeting the DESY telescope test and will utilize it there. SVD R/O“POCKET DAQ” to be developed by DAQ Belle2Link

Takeo Higuchi (KEK); PXD/SVD Joint Meeting Pre-Prototype of POCKET DAQ 17 Mini KEK-VME crate for COPPERs and TTD, TTIO, TTSW. Portable PS for the MGTF cards irradiated. Snapshot in a neutron irradiation study to optical transceivers carried out in Kobe. Univ. from Sep.6 th to 7 th, In this case, MGTF cards (Bell2Link TX/RX) are mounted on the COPPER board. Optical fibers binding irradiated and on-COPPER MGTF cards. The present system requests your biggest “pocket”, though …  COPPER and TTD boot-up PC.

Takeo Higuchi (KEK); PXD/SVD Joint Meeting Timeline Before the beam test: – SVD FADC prototypes: in Mar – FADC→FTB→COPPER readout test: in Jun DAQ group may be requested to make assistance for this. – System test including PXD: in Sep Originally, DAQ group expected that September was the time to setup DAQ paths roughly in ~three-week-works; fine tuning of the DAQ was considered to be made on the fly during the October beam test. DAQ may need to work out our homework by one month earlier. – DESY beam test: in Oct No question at all. 18 Discussion outputs from the SVD parallel sessions. At when and to where, what items should DAQ group ship from KEK?

Takeo Higuchi (KEK); PXD/SVD Joint Meeting Summary Goal of the test from DAQ’s view is to establish the data- size-reduction scheme using HLT feedback to the PXD- readout. Responsible person’s name to the specific job (I think) are assigned. Items to do relevant to DAQ are (implicitly) listed in the slides. 19

Takeo Higuchi (KEK); PXD/SVD Joint Meeting Amendments AFTER My Talk [1] Following slides list up discussed outputs during my talk. If you find any mistaken or forgotten items in the amendment slides, please let me know ASAP. 20 Written at 11:00am Sep.26 th, 2012 by TH.

Takeo Higuchi (KEK); PXD/SVD Joint Meeting Amendments AFTER My Talk [2] Magnetic field strength → 1.2T Will the GT3 surely be used in the telescope study? → consult Y.Iwasaki-san if he likes to join this program. # of DHHs → 2x DHHs + DHH-controller # of ATCA(s) → 1x ATCA # of FTBs and HSLB cards → 2x FTBs + 2x HSLB cards 21 Written at 11:00am Sep.26 th, 2012 by TH.

Takeo Higuchi (KEK); PXD/SVD Joint Meeting Amendments AFTER My Talk [3] RoI-finding software will be taken care by M.Heck-san using Jacob-san’s algorithm. Assignment of a responsible person’s name for the online data quality monitoring (DQM) is a homework to the next meeting. Event display should be prepared as a part of the DQM. DAQ likes commodities (PCs) are purchased in Germany. → there exists possibility, but R.Itoh-san are requested to claim # of PCs and PCs’ specification. 22 Written at 11:00am Sep.26 th, 2012 by TH.