WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date: 2015-11-13.

Slides:



Advertisements
Similar presentations
Technical Plenary From: oneM2M TP leadership Source: Meeting Date: Agenda Item:
Advertisements

Release 2: Work Items best practices Group Name: TP15 Source: Scarrone Enrico, Telecom Italia Meeting Date:
WG 3 Progress Report at TP12 Group Name: oneM2M TP12 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
WG-2 - ARC TP #17 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
OneM2M portal introduction Group Name: Technical Plenary Source: Gerry McAuley, ETSI, Meeting Date: Agenda Item: 1.5.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Setting oneM2M’s Market direction
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)
WG 2 Progress Report at TP #8 Group Name: oneM2M TP #8 Source: WG2 leadership Meeting Date: /13 Agenda Item: WG Reports.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP12 Source: Convenor WPM Joachim Koss, Gemalto M2M,
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: /18 Agenda.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP13 Source: Convenor WPM Nicolas Damour, Meeting Date:
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Technical questions on oneM2M certification Group Name: TST Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
WG 3 Progress Report at TP15 Group Name: oneM2M TP15 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
SEC Conference calls following TP#11 Group Name: WG4 (SEC ) Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information.
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
SEC #11 WG4 Status & Release 1 Outlook Group Name: Source:,, Meeting Date: Agenda Item:
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
Status of Active Work Items Level of Completeness Group Name: WPM Source: Roland Hechwartner, WPM Convenor Updated:
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG2 PRO Status Report at TP19 Group Name: oneM2M TP19 Source: Peter Niblett, IBM Meeting Date: to Agenda Item: TP19, Item 10.3, Reports.
Feedbacks on oneM2M certification Group Name: TP Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda Item:
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
Technical Plenary Terms for the collaboration with P2413 From: oneM2M TP Chair Source: Meeting Date: Agenda Item:
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
TS-0004 guideline for new resource type definition Group Name: PRO WG Source: SeungMyeong JEONG, LG Electronics Meeting Date: Agenda Item: TS.
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Status of Active Work Items Level of Completeness
WPM ad-hoc group report TP#24
WG1 status report to TP#15 Group Name: oneM2M TP15
Release Timeline Discussion R2 and beyond
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
ITU-R Ad-Hoc Contact person
Presentation transcript:

WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date: Agenda Item: TP#20, Item: 11 TP WPM_status_report_TP20

WPM Status Report TP#20 Content Activities since last TP Items for INFORMATION – Work Item Progress – Release 2 Timeline Next Steps Next Meetings Visit Portal © 2015 oneM2M Partners TP WPM_status_report_at_TP20

Activities since TP#19 WPM 19.1 cc-meeting held – Reviewed work item status TP_WPM R08-New_Work_Item_Status_Report ADM-0001-oneM2M Work Program V – Release Timing Considerations Discuss further on Release schedule TP_WPM R02-Release_Timeline_Discussion © 2015 oneM2M Partners TP WPM_status_report_at_TP20

Items for INFORMATION Work Item Status update – “New Work Item Status Report” TP_WPM R0x-New_Work_Item_Status_Report “WI packages” per WG – Work Item completeness in % TP Work_Item_Status_%comp_TP20 – Full Work Program Status update made available after TP#20 Release Timeline Discussion – Reviewed and agree Release 2 Features and milestones – Propose “review milestones” for R2 and R3 – Initiate discussion on Release beyond R2 TP Release Timeline Discussion © 2015 oneM2M Partners TP WPM_status_report_at_TP20

Next Steps Update Work Program post TP#20 – document ADM-0001 oneM2M Work Program-V – WPM member portal Release Timing Considerations – Scheduled CC will focus on R2/R3 timing considerations Release 2 Description Document – ongoing review based on progress of work – Additional content Release1 functionalities, CR list per TS ?,… © 2015 oneM2M Partners TP WPM_status_report_at_TP20

Next Meetings WPM 20.1 Conference Call on Dec 19 th 13:00-15:00 UTC WPM 21F2f session at TP21 (as part of TP?) © 2015 oneM2M Partners TP WPM_status_report_at_TP20

oneM2M Member Portal “Work Programme” …is the place to find… A Cross Reference of WIs & Specifications & Status – ADM-0001 oneM2M Work Program-V ( XLS document ) XLS document TSs and TRs along with the Rapporteurs for each and the related Work items + A work item status presentation will be made available prior to each TP Latest version in TP WPM R08 TP WPM R08 © 2015 oneM2M Partners TP WPM_status_report_at_TP20