Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG1 status report to TP#15 Group Name: oneM2M TP15

Similar presentations


Presentation on theme: "WG1 status report to TP#15 Group Name: oneM2M TP15"— Presentation transcript:

1 WG1 status report to TP#15 Group Name: oneM2M TP15
Source: Joerg Swetina (NEC), Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#15, Item 10, Reports from Working Groups

2 Issues for DECISION in TP
CR Packs for Technical Specifations TS-0002 (Requirements) Rel-1 Rapporteur: Yu Qi see TP CR_pack_for_TS-0002_(Requirements) Progress at 100% For TP.15 approval => implemented in TS-0002 V.1.0.0 TS-0011 (Definitions) Rel-1 Rapporteur: Roland Hechwartner see TP CR_pack_for_TS-0011_(Definitions) Progress at 100% For TP.15 approval => implemented in TS-0011 V.1.2.0 Release 1 TSs: TS-0002 V see TP TS-0011 V see TP WG1 to check via CR implementation till next Friday (30. 1.)

3 Action Items for alignment in TP
none

4 _all definitions _ from TSs should be moved into TS-0011
Items for INFORMATION WG1 agreed on future handling of oneM2M definitions: At latest at the end of a release _all definitions _ from TSs should be moved into TS-0011

5 Highlights Baselines available
TS-0002 (Requirements) V => Note: V will be created when the first CR for Rel-2 is agreed TS-0011 (Definitions) V => Note: V will be created when the first CR for Rel-2 is agreed TR-0001 (Use Cases Collection) V => Note: V will include agreed changes from this meeting (1 week) TR-0013 (Home Domain Enablement) V => Note: V will include agreed changes from this meeting (1 week) TR-0005 (Roles and Focus Areas) V (no progress at this meeting) WG1 has finalized all outstanding work on Rel-1 Requirements coverage in rel-1 and external comments Non-normative Rel-2 work is ongoing (Home Domain) New work on industrial use cases proposed.

6 Issues for INFORMATION to TP
TP CR_pack_for_TS-0002_(Requirements)  Short doc nb  Shortname  Source REQ R03 CR_to_TS-0002_Security_Requirements Francois Ennesser (Gemalto) REQ R02 CR_to_TS- 0002_Agreed_part_of_Overall_System_Requirements Joerg Swetina (NEC) REQ vice chair REQ R03 CR_to_TS-0002_Overall_System_Requirements REQ R02 CR_to_TS- 0002_Charging_Operational_CommRequest_NonFunc tional_Requirements REQ R02 CR_to_TS- 0002_Management_Abstraction_Semantics_Requirem ents REQ R01 CR_to_TS-0002_OSR_041 Enrico Scarrone, Telecom Italia REQ R01 TS-0002_cleanup Yu Qi (Rapporteur)

7 Issues for INFORMATION to TP
TP CR_pack_for_TS-0011_(Definitions)  Short doc nb  Shortname  Source REQ R03 TS-0011 CR Security Definitions Qualcomm Inc. (TIA), Alcatel Lucent REQ CR to TS-0011 editorial cleanup incl ETSI EditHelp comments Roland Hechwartner, Deutsche Telekom

8 Issues for INFORMATION to TP
Agreed contributions to TR-0013 (Home Domain enablement)  Short doc nb  Shortname  Source REQ R01 Moving Field Domain Triggering use case Haier REQ R01 Use case for automatically switching between remote access and local access 5REQ R06 Use case for Conflict Management in Home Automation System KETI REQ R06 Use case for Device Caching in Home Domain REQ R03 Use Case of Message Profile in Home Domain LG Electronics Inviting people to work on new use cases for TR-0013 Extracted from HGI, Raising the Floor Consortium, IETF Authentication and Authorization for Constrained Environments (ACE) Working Group, BBF REQ Potential Use Cases for Home Domain KETI

9 Issues for INFORMATION to TP
Agreed contributions to TR-0001 (use cases) This contribution moves a use case to TR-0013 REQ Reference of Field Domain Triggering use case Haier

10 Next Steps Work on Home Domain enablement,
Discuss new WI on industry support

11 Next Meetings / Calls Conference Calls Face to Face
2 conference calls till TP16 requested Face to Face TP16 Sophia-Antipolis March 2015 Expect at least 6-7 regular timeslots TP17 Sapporo, Japan 18 – 22 May 2015


Download ppt "WG1 status report to TP#15 Group Name: oneM2M TP15"

Similar presentations


Ads by Google