Presentation is loading. Please wait.

Presentation is loading. Please wait.

Technical Plenary From: oneM2M TP leadership Source: Meeting Date: 2015-01-21 Agenda Item:

Similar presentations


Presentation on theme: "Technical Plenary From: oneM2M TP leadership Source: Meeting Date: 2015-01-21 Agenda Item:"— Presentation transcript:

1 Technical Plenary From: oneM2M TP leadership Source: Meeting Date: 2015-01-21 Agenda Item:

2 © 2015 oneM2MMARCOM Report Timeline for oneM2M Release 2 2 TP15 Jan 2015 TP17 May2015 TP18 July 2015 TP20 Nov 2015 TP23 May 2016 R1 Publication and ratification TP15.1 Window for R2 feature WIs R2 work program Deadline for R2 WIs, Market view of R2 (Marcom) Assess duration of R2 + consider priority Stage 1 freeze R2 Target date for Stage 2 freeze R2 Target date for R2 Stage 3 freeze publication R2 and ratification Essential Corrections (COR) Small Technical Enhancements and Improvements (R2)

3 © 2015 oneM2MMARCOM Report Recommendations Encourage contributors to progress features for stage 1,2,3 without waiting until e.g. a stage 2 is frozen should be possible because stage 3 (and related methodology) is stable R1 maintenance can be published/ratified as frequently as needed Ensure all documents are available under (after every meeting): www.oneM2M.orgwww.oneM2M.org Encourage WIs to be submitted ASAP and consider stage 1 release by TP18

4 © 2015 oneM2MMARCOM Report WPM aspects Coordinate release 2 description document – after TP17 Gating list of Mandatory content for R2

5 © 2015 oneM2MMARCOM Report For discussion Do we need intermediate candidate release? Need for prioritization? 18 months release cycle, too long?


Download ppt "Technical Plenary From: oneM2M TP leadership Source: Meeting Date: 2015-01-21 Agenda Item:"

Similar presentations


Ads by Google