Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date: 2015-11-12.

Similar presentations


Presentation on theme: "Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date: 2015-11-12."— Presentation transcript:

1 Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, roland.hechwartner@t-mobile.at Meeting Date: 2015-11-12 Agenda Item: Release Timing Consideration

2 Release Timeline For Discussion (Assumed) timeline for Release 2 and beyond – Release 2 timeline as discussed and agreed (see slide 3) Final assessment based on R2 content at TP#22 – i.e. after stage 2 freeze (TP#21) – Timing considerations for R2 => R3* (see slide 3) Based on MoW guideline for workflow amongst releases in oneM2M_Method_of_Work-V-1.3.2 (see Backup) and initial discussions in WPM – Initiate discussion on duration of Release 3* (see slide 4) Proposal for discussion – Initial brief discussion on WPM call Further assessment of timeline (scope - duration) of R3* at Stage 3 freeze of release 2 (TP#23) * Release beyond Release 2 © 2015 oneM2M Partners TP WPM-2015-0008R02 2

3 Release Timeline R2 normative work JulAugSepOctNovDecJanFebMarAprMayJunJulAugSep Stage 1 R3 non-normative work R3 normative work Stage1 Freeze R2 normative work Stage 2 R3 non normative work R3 normative work R2 normative work Stage 3 R3 normative work Stage3 Freeze 20152016 TP24 R3 start norm work OctNov TP25 Stage2 Freeze TP18TP19TP20TP21TP22TP23 R2 approval R2 ratification TP26 ARC 19.4 © 2015 oneM2M Partners TP WPM-2015-0008R02 3 Release 2 Release 3 Color Code R2 R3 Review of R2 timeline Review of R3 timeline

4 Release Timeline cont´d © 2015 oneM2M Partners TP WPM-2015-0008R02 4 R2 normative work Q3Q4Q1Q2Q3Q4Q1 Stage 1 R3 non-normative work R3 normative work R2 normative work Stage 2 R3 non normative work R3 normative work R2 normative work Stage 3 R3 normative work Stage3 Freeze 2015 TP24 R3 start norm work Q2Q3 Stage2 Freeze TP18TP21 R2 approval R2 ratification TP30 Q1Q2Q3Q4 201820172016 TP meeting # Stage1 Freeze TP23 TP27 TP31 TP33 R3 Stage 1 freeze R3 Stage 2 freeze R3 Stage 3 freeze TP34 TP35 R2 approval R2 ratification Release 2 Release 3 Color Code Release 4 R4 - Start Normative Work R2 R3

5 Release Timeline Proposal It is proposed to review this contribution in order to agree on the timeline for Release 2 – Including review and final assessment at TP#22 agree on an initial working assumption for the release beyond R2 (Release 3) – Further review and assessment at TP#23 * Release beyond Release 2 © 2015 oneM2M Partners TP WPM-2015-0008R02 5

6 Backup

7 Method of Work See also TP-2015-0809-Method_of_Work-v1_3_2 The following guidelines are therefore given to govern the workflow among subsequent releases development (Release x+1 respect to Release x) : – Release x+1 stage 1 normative work cannot be initiated before the freezing of Release x stage 3 – Release x+1 stage 2 normative work cannot be initiated before the ratification of Release-x – Non normative work on stage 1 of Release x+1 can be performed at any time of Release x – Non normative work on stage 2 Rel x+1 can be performed after the freezing of stage 3 Release x – Testing is seen as an independent process not directly linked to the 3 stages model. these guidelines are general principles for all the Releases, the TP may decide different timelines for a specific release based on identified needs/opportunities. © 2015 oneM2M Partners TP WPM-2015-0008R02 7