Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date: 2015-11-12.

Similar presentations


Presentation on theme: "Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date: 2015-11-12."— Presentation transcript:

1 Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, roland.hechwartner@t-mobile.at Meeting Date: 2015-11-12 Agenda Item: Release Timing Consideration

2 Timeline for Release 2 & beyond Release 2 timeline as discussed and agreed (see slide 4) – oneM2M Release 2 Features As discussed in interim TP and WPM session during TP#20 meeting week – Final assessment based on R2 content at TP#22 i.e. after stage 2 freeze (TP#21) Timing considerations for R2 => R3* (see slide 3) – Based on MoW guideline for workflow amongst releases oneM2M Method_of_Work-V-1.3.2 (see Backup) Initiate discussion on duration of Release 3* (see slide 5) – Proposal for discussion Initial brief discussion in WPM – Further assessment of timeline (scope - duration) of R3* at Stage 3 freeze of release 2 (TP#23) * Release beyond Release 2 © 2015 oneM2M Partners TP WPM-2015-0008R02 2

3 3 oneM2M release 2 features Industrial domain enablement (at least 1 normative feature) Time series, etc. In conjunction with the TR oneM2M Beyond initial release Semantic interoperability base ontology semantic discovery semantic descriptions Security Enhancement for authorization privacy support e2e security (?) oneM2M interworking framework Generic interworking AllJoyn/AllSeen and/or OIC and/or OMA LightWeight M2M (OMA LWM2M) and/or 3GPP Rel.13 Interworking Home domain enablement (at least 1 normative feature) Home appliance information models APP identifiers and registry services Advanced protocol binding WebSocket (?) Efficient content representations (?)

4 Release Timeline R2 normative work JulAugSepOctNovDecJanFebMarAprMayJunJulAugSep Stage 1 R3 non-normative work R3 normative work Stage1 Freeze R2 normative work Stage 2 R3 non normative work R3 normative work R2 normative work Stage 3 R3 normative work Stage3 Freeze 20152016 TP24 R3 start norm work OctNov TP25 Stage2 Freeze TP18TP19TP20TP21TP22TP23 R2 approval R2 ratification TP26 ARC 19.4 © 2015 oneM2M Partners TP WPM-2015-0008R02 4 Release 2 Release 3 Color Code R2 R3 Review of R2 timeline Review of R3 timeline

5 Release Timeline cont´d © 2015 oneM2M Partners TP WPM-2015-0008R02 5 R2 normative work Q3Q4Q1Q2Q3Q4Q1 Stage 1 R3 non-normative work R3 normative work R2 normative work Stage 2 R3 non normative work R3 normative work R2 normative work Stage 3 R3 normative work Stage3 Freeze 2015 TP24 R3 start norm work Q2Q3 Stage2 Freeze TP18TP21 R2 approval R2 ratification TP30 Q1Q2Q3Q4 201820172016 TP meeting # Stage1 Freeze TP23 TP27 TP31 TP33 R3 Stage 1 freeze R3 Stage 2 freeze R3 Stage 3 freeze TP34 TP35 R3 approval R3 ratification Release 2 Release 3 Color Code Release 4 R4 - Start Normative Work R2 R4 R3

6 Release Timeline Proposal It is proposed to review this contribution in order to agree on the timeline for Release 2 – Including review and final assessment at TP#22 agree on an initial working assumption for the release beyond R2 (Release 3) – Further review and assessment at TP#23 * Release beyond Release 2 © 2015 oneM2M Partners TP WPM-2015-0008R02 6

7 Backup

8 Method of Work See also TP-2015-0809-Method_of_Work-v1_3_2 The following guidelines are therefore given to govern the workflow among subsequent releases development (Release x+1 respect to Release x) : – Release x+1 stage 1 normative work cannot be initiated before the freezing of Release x stage 3 – Release x+1 stage 2 normative work cannot be initiated before the ratification of Release-x – Non normative work on stage 1 of Release x+1 can be performed at any time of Release x – Non normative work on stage 2 Rel x+1 can be performed after the freezing of stage 3 Release x – Testing is seen as an independent process not directly linked to the 3 stages model. these guidelines are general principles for all the Releases, the TP may decide different timelines for a specific release based on identified needs/opportunities. © 2015 oneM2M Partners TP WPM-2015-0008R02 8