Presentation is loading. Please wait.

Presentation is loading. Please wait.

WPM ad-hoc group report TP#25

Similar presentations


Presentation on theme: "WPM ad-hoc group report TP#25"— Presentation transcript:

1 WPM ad-hoc group report TP#25
TP R01-WPM_status_report_TP25 WPM ad-hoc group report TP#25 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date: Agenda Item: 10

2 WPM Status Report TP#25 Content Activities since last TP WI Snapshot
Work Items proposed to be closed Next Steps Next Meetings

3 Activities since TP#24 (1/2)
WPM 24.1 CC and joint WPM/MoW 25 f2f provided work program status List of WIs to be closed at TP#25 ADM-0001-oneM2M Work Program V24.2.0 TP R01-Work_Program_Status_at_TP25_opening Work Item completeness in % TP R01-Work_Item_Status_%comp_TP24

4 Activities since TP#24 (2/2)
MoW Changes to the CR and IC templates See Document TP Clarifies wording, removes duplications, use of date format.. Adds new information field to template header Support for the changes additional editorial corrections will be suggested drafting session to consolidate all the updates and prepare an input contribution for the M&P group for approval Impacted other TS/TR (s) <TS/TR number>, <Version Number>, and <Description on which aspect should be reflected in this TS/TR> 

5 WI Snapshot* Status before TP#25 closing session
30 work items completed and proposed to be closed 25 active work items 2 new work items have been proposed at TP#25 * Final status available in ADM-0001-Work Program Management v

6 Item for Decision It is proposed to close the following work items:
Generic WIs WI-0038 – Maintenance of oneM2M Release 1 WI-0039 – Small Technical enhancements of oneM2M Release 2 REC WG WI Vocabulary, Roles and Focus Areas for oneM2M Technical Work WI-0028 – Industrial Domain Enablement ARC WG WI-0011 – Service Component Architecture WI-0018 – oneM2M & AllJoyn Interworking WI-0024 – LWM2M Interworking WI-0026 – Efficient Communications WI-0029 – App-ID Clarification WI-0033 – Supporting Time Series Data WI-0037 – Interworking with 3GPP Rel-13 MTC feature WI Enhancements to Subscription/Notification FW WI-0044 – oneM2M & OIC interworking PRO WG WI-0008 – Protocol TR WI-0020 – Service Layer API WI-0040 – Development of WebSocket Protocol Binding SEC WG WI-0016 – End-to-End Security and Group Authentication WI-0023 – Study of Authorization Architecture for Supporting Heterogeneous Access Control policies WI-0036 – Update Security Analysis TR for Release 2 WI-0045 – Addition of Interoperable Privacy profiles to oneM2M Security Solutions TS-0003 MAS WG WI-0004 – Management Capability Enablement Technologies WI-0005 – Abstraction & Semantics Capability Enablement WI oneM2M Management Enablement WI-0017 – Home domain Enablement WI-0025 – Generic Interworking WI-0043 – Continuation & integration of HGI Smart Home activities TST WG WI-0022 – Interoperability Testing WI-0027 – Testing Framework WI-0042 – Application developer guide

7 List of active WIs* Generic WIs WI-0049 - Rel-1 & 2 Maintenance
WI Rel-3 Small Technical Enhancements REQ WG WI oneM2M Use Case Continuation WI-0046 – Vehicular domain enablement ARC WG WI-0031 – Optimized Group-based Operation WI-0034 – Study of re-usable service layer context & Transaction enablement WI-0035 – Action Triggering WI DDS usage in oneM2M system WI OSGi Interworking WI Evolution of Proximal IoT Interworking WI-0058 – Interworking with 3GPP networks WI OPC-UA Interworking WI Service Layer Forwarding PRO WG - SEC WG WI-0019 – Dynamic Authorization for IoT WI-0021 – Secure Environment Abstraction WI TEF Interface WI Distributed Authorization MAS WG WI-0030 – M2M Application & Field Domain Component configuration WI LWM2M DM & Interworking Enhancements WI Rel-3 Enhancements on Semantic Support WI-0063 – Rel-3 Enhancements on Base Ontology & Generic Interworking TST WG WI Conformance Test WI Security Functions Conformance Testing WI Developers guide series WI Product Profiles & Feature Catalog WI Interoperability testing Release 2 * Final status available in ADM-0001-Work Program Management v

8 Next Steps Update Work Program post TP#25 Release 3 planning
document ADM-0001 oneM2M Work Program-V25.0.0 WPM member portal Release 3 planning initial scope and milestone plan in TP R01 Re-assessment of milestones until TP#26 Initial proposal suggests Stage 1 freeze at next TP Discussion to move milestones by 1 to 2 meeting cycles Discussion at WPM 25.1

9 Release-3 high-level time-line
Source: TP_WPM R01-Release-3_Planning Move all freeze milestones by 1 or 2 meeting cycles ? => Stage 3 freeze TP33 (Jan 2018) At TP#26 Re-assess schedule

10 Next Meetings Face to Face Meeting WPM 26 Conference Call WPM 25.1
Dec. 6th Tue 12:30-13:30 (local time) Conference Call WPM 25.1 Nov 23rd Wed 12:30-14:00 UTC => date/time t.b.c

11 oneM2M Member Portal …is the place to find…
A Cross Reference of WIs & Specifications & Status ADM-0001 oneM2M Work Program-V (XLS document) TSs and TRs along with the Rapporteurs for each and the related Work items A work item status presentation will be made available prior to each TP


Download ppt "WPM ad-hoc group report TP#25"

Similar presentations


Ads by Google