Presentation is loading. Please wait.

Presentation is loading. Please wait.

Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,

Similar presentations


Presentation on theme: "Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,"— Presentation transcript:

1 Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M, joachim.koss@gemalto.comjoachim.koss@gemalto.com Meeting Date: 2013-10-14 Agenda Item: 5 - Reports from Ad-Hoc Groups

2 Issues for DECISION in TP No issues for decision © 2013 oneM2M Partners oneM2M-TP-2013-0343 2

3 Issues for DISCUSSION in TP © 2013 oneM2M Partners oneM2M-TP-2013-0343 3 Estimation on needed face to face / conference call timeslots to complete the deliverable

4 Items for INFORMATION Meetings held since last TP 22 Aug, 28 Aug, 06 Sep, 11 Sep, 25 Sep, 02 Oct, 10 Oct Meetings planned 23 Oct, 31 Oct Frame conditions: Start of conference calls not earlier than 5:00 in the morning local time of any region End of conference calls not later than 0:00 midnight local time of any region Typical duration: 1 hour Typical in timely collocation with a conference call of another group (before that one) only applicable during summertime © 2013 oneM2M Partners oneM2M-TP-2013-0343 4

5 Items for INFORMATION Achievements – Proposal of a 3 phase methodology developed for describing an initial Release based on CSFs and Protocols, applied during an extraordinary TP/WG leadership meeting followed by several TP ad hoc conference calls and resulted in proposal to TP7 (oneM2M-TP-2013-0328R01) – Work Programme advanced as a permanent document – Process of Work Programme Reports updated: granularity of “level of completeness” in Work Programme Reports – Discussions proceeded in elaborating the role of WPM ad- hoc group in Release management © 2013 oneM2M Partners oneM2M-TP-2013-0343 5


Download ppt "Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,"

Similar presentations


Ads by Google