31, 2006 1 LCLS Maintenance Personnel and Procedures Paul Bellomo.

Slides:



Advertisements
Similar presentations
Accel Computerized Maintenance Management System.
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Accelerator Operations and Efficiency Presentation by Roger Erickson SLAC Operations Review SLAC, June 15-16, 2004.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Managing a computerised PO Operating environment 1.
Stephen Schuh Vacuum Controls Final Design 6 April 2006 Injector Vacuum Controls Hardware Final Design Review 6 April 2006.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
LOCKOUT/TAGOUT ENERGY CONTROL PROGRAM
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
PEP-II Operational Safety and Management Presentation by Roger Erickson B-Factory Operations Review SLAC, April 26, 2006.
Software Tools for Operations and Maintenance Planning Theo Larrieu, Steve Suhring.
E.Matias Canadian Light Source. Where is Saskatoon?
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Proton Plan Director's Review 8/15/06 – Booster Corrector UpgradeDrennan1 Proton Plan Booster Corrector Upgrade Directors Review August 2006 Presenter:
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Software Configuration Management Lessons Learned Patrick Bong Safety Systems Group Stanford Linear Accelerator Center.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
Software QA Safety Systems at SLAC Enzo Carrone Controls Department – Safety Systems SLAC National Accelerator Laboratory.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
SLAC Accelerators Power Electronic System Operation for Reliability
Accelerator Operations Department Readiness (Part 2)
PLC-based control systems at SOLEIL - ICALEPCS 2017
GlueX Electronics Review Jefferson Lab July 23-24, 2003
J. Seeman Assistant Director for PPA/LCLS
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
Ion Source and LEBT Beam Diagnostics
LCLS Personnel Protection System and Beam Containment System
E. Michael Saleski PPS and BCS Systems Manager
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Operation in 2009 Roger A. Erickson
Operation of Target Safety System (TSS)
Injector/Linac Design Status C. E
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

31, LCLS Maintenance Personnel and Procedures Paul Bellomo

31, Topics Scope and Perspective Why we know we are ready Department descriptions ARTEMIS The maintenance process Examples

31, Scope and Perspective Accelerator equipment New electrical, mechanical, electro-mechanical and electronic equipment from the injector gun through the end of the tune-up dump TD-11. New control room in Building 5 New substations K10B, S520, MCC S20, panel-boards Operations Directorate 12 Departments, only 5 directly involved Controls, CEF, Klystron/Microwave, Mechanical Fabrication, Power Conversion Perspective Maintenance departments

31, Why We Know We Are Ready All departments LCLS equipment possesses some new features, but is not totally unlike the equipment that SLAC currently services and maintains Designers are the persons/groups that will maintain the equipment Maintenance personnel are qualified and have been involved in the LCLS design from the start. Training requirements are modest and provided by LCLS, Department, or outside agency Staff quantity is adequate to handle increased LCLS workload. The documentation (detailed later) needed to support the systems exist Procedures (detailed later) needed to maintain the systems exist

31, Department Descriptions Department Head – Hamid Shoaee, staff of 75 Software and hardware sections Software Section Write low-level applications, EPICS drivers, displays Maintain MATLAB infrastructure (licenses), ensure compatibility with all control room platforms Provide network hardware and software Provide control room infrastructure (alarms, displays, servers and workstations) Development and maintenance are the same people

31, Department Description - Controls (Continued) Hardware Section Beam Containment System (BCS) Prevents radiation from 'escaping' the shielding enclosure BSOICs, BTMs, LIONS, toroids and current monitors Machine Protection System (MPS) Protect equipment from beam damage VME processor-based protection ion chambers (PICs), RTDs, digital monitors Personnel Protection System (PPS) Protect personnel from radiation exposure, laser and electrical hazards PLC driven systems Vacuum - PLC based gages, valves, pumps and interlocks Movers - Tables, mirrors, cameras, wire scanners

31, Department Head – John Weisend, staff > 150 CEF Operations - Bernie Romero, staff of 28 Electrical maintenance of substations and electrical distribution equipment Beam-line manifolds and plumbing Documentation One-line diagrams Panel-board schedules Manufacturer drawings and instruction manuals Beam line assembly and layout drawings

31, Klystron/Microwave Department Department Head - Chris Pearson, staff of 80 Microwave Engineering and Maintenance/AMRF, staff of 15 Positron Source, Damping Rings, LINAC, LCLS LINAC and SLC RF systems and 2856MHz pulsed klystrons PEP (HER and LER) and SPEAR 3 RF systems and 1.2 MW, 476MHz CW klystrons Documentation Rack front views and Captar rack profile drawings Electrical interconnect diagrams, cable database Electronic chassis diagrams Manufacturer drawings and instruction manuals ELPs, EWPs, bench test, hi-pot procedures

31, Mechanical Fabrication Department (MFD) Department Head – Karen Fant, staff of 80 Mechanical fabrication/maintenance – no design Vacuum gages and pumps on the vacuum side, pneumatic valves, beam pipe and other components designed by others (LCLS staff) Magnet cooling water hoses, disassemble magnets to find magnet problems and ground faults On-call support of Operations Documentation Beam line assembly and layout drawings Vacuum pump-down procedures

31, Department Head – Paul Bellomo, staff of 75 DC magnet power systems and RF modulators Cables, cable tray and raceways Dedicated maintenance staff of 31 people, 24/7, 3-shift operation Participate in power system commissioning Documentation Rack front views and Captar rack profile drawings Electrical interconnect diagrams, cable database Electronic chassis diagrams Manufacturer drawings and instruction manuals ELPs, EWPs, bench test, hi-pot procedures

31, ARTEMIS Accelerator REMEDY Trouble Entry & Maintenance Information System Web-based problem reporting, work scheduling and work status program Report and track both hardware and software problems Incorporates ISMS core functions Five states New Entry – report problems or schedule maintenance In Progress – Jobs in progress or have more work to do Scheduled Jobs – Input from the New Entry state Review To Close – All known work completed, ready for management review Closed – trouble report entered into archive

31, ARTEMIS

31, The Process

31, Example S20 Power Distribution Layout

31, Example One-Line Diagram Excerpt from ID Substation K10B 13.8kV:480V to S20 MCC to 6 Power Supply Racks Portion of S20 MCC shown

31, Example Rack/Equipment Profile

31, Example Electrical Interconnect (EI/ELP) Diagram

31, The PCD Process – Example 1 LCLS bend magnet system fails unexpectedly at 3AM. The indications are that a power supply has failed. LCLS Operations files an ARTEMIS and also notifies the PCD owl shift supervisor/maintenance manager (MM). Ops classifies the problem as critical, because the machine is down without this particular magnet. MM evaluates the system, reviews past ARTEMIS reports and chooses appropriate technicians to troubleshoot the problem. The MM, the technicians then assess the situation, from the technical, logistics and safety standpoints. The system is 480VAC input, 40VDC output. Appropriate test equipment and PPE (Category 0 with Class 0 gloves) The group notifies Ops that it is responding to the call. Ops turns the system over to PCD. PCD applies LOTO. ARTEMIS upgraded to “in process”

31, The PCD Process – Example 1 Continued Work progresses power system will not turn on. After several hours, the solution is not readily apparent. Ops escalates the problem to the designated system expert or Department Head. After 3 hours without resolution the Department Head and LCLS manager are notified. Work continues The technical expert finds and solves a short in the power supply rectifier. Parts are field-replaced. Ops is notified that the system is running. The system is returned to Ops. Technicians file “review to close” ARTEMIS report, file e-log detailing the problem, the solution and parts used. The PCD MM checks the parts inventory and if below a pre-determined critical level, orders replacement parts. PCD closes the job internally

31, The PCD/MFD Process – Example 2 A ground fault is discovered in a magnet system. Ops files ARTEMIS and notifies PCD. The fault keeps the system off. It must be repaired immediately PCD locks out the system. They troubleshoot the system and determine that the ground fault is in the magnet. PCD asks Ops to notify MFD. The ARTEMIS is annotated and responsibility re-assigned. PCD replaces personal LOTO with group LOTO. The PCD MM is now responsible for the system. MFD is called. MFD responds and confers with PCD. PCD demonstrates that the power supply cannot be turned on. MFD apply personal locks over the PCD group locks. MFD apply other LOTO, verify magnet ground fault existence and perform work necessary to remove the ground fault.

31, The PCD/MFD Process - Example 2 Continued The ground fault is found and repaired. The magnet is re-assembled and hi- potted. MFD personnel remove their locks. PCD is re-called. PCD replaces Group with personal locks. PCD hi-pots the system, remove their locks, turn the system on and release it to Ops. PCD technicians file a “review to close” the ARTEMIS and file e-log entries PCD MM conducts safety de-briefing and closes the job

31, Last Slide The SLAC maintenance groups are ready and eager to safely and professionally support the LCLS project