6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.

Slides:



Advertisements
Similar presentations
Welcome to your new computer!
Advertisements

Internal staff release only X-Call V2.0 - Installation for Emis LV & PCS Jayex Technology Limited X-Call Version 2.0 March 2010 v
Internal staff release only X-Touch V 3.63 Installation Guide for Emis LV & PCS Jayex Technology Limited March 2010.
GP Patient Survey Mouse-click your way through step-by-step instructions Software Installation Guide.
Choose a category: Install Episys Install Accessories Synergent Confidential Episys Version Synergent 2008Download latest guides from:
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Windows Software Installation Tutorial GEFSOC Soil Carbon Modeling System Mark Easter, Kendrick Killian, Ting Feng, and Keith Paustian Natural Resource.
Installation Ubuntu for Libraries. Step 1: Download Head on to Pick Ubuntu LTS; just click the big orange.
Cummins® Inc. Update Manager 3.0 Training Electronic Service Tools.
Cummins® Inc. Update Manager 3.1 Training Electronic Service Tools.
Creating a MagicInfo Pro Screen Template
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
MagicInfo Pro Server Software All control, content, and scheduling is performed within the MagicInfo Pro Server software previously installed. Before.
Installing the SAFARIODBC.EXE For use with Excel May 3, 2002.
MagicInfo Pro Scheduler Now that a template has been created from content imported into the Library, the user is ready to begin scheduling content to.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
Specview Tutorial for the Line Identification Tool I. Busko Space Telescope Science Institute March, 2010.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
SIMSWeb “Internet Remote Access” The most advanced central station software in the universe !
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Multi-Programmer User Guide 1. Contents 1.Product ComponentsProduct Components 2.Software InstallationSoftware Installation 3.Software UseSoftware Use.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
WHAT ARE THE STEPS TO CONNECT MY HP DESKJET 3520 TO WI-FI?
WikID installation/training
LAV front-end and readout status
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
CMS Area Working Group Meeting
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
INSTALLING AND SETTING UP APACHE2 IN A LINUX ENVIRONMENT
Downloading E-first Piece Software
The Ohio State University
CSC Electronics Installation and Commissioning CSCE I&C
New Calorimeter Trigger Receiver Card (U. Wisconsin)
B904 Status Report by Fred B.
VCC Hardware Production Status
Pierluigi Paolucci & Giovanni Polese
Configuring the Peripheral Crates
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Plans for the 2004 CSC Beam Test
Peripheral Crate Testing, Installation, and Commissioning
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
Needed for Team A on -End
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group

6-Dec-05PC Commissioning2 Commissioning What does Commissioning mean in this context? –Peripheral Crates, PC, plus CSC are as ready as possible for LHC running (status of present slice-test crates) –PC are operational and have first values of constants and calibrations When must it be done? –Before the disks are lowered Could be ~6 months after lowering before all services are connected below ground Will be some time between + lowering and -

6-Dec-05PC Commissioning3 EMU/CSC Commissiong Commissioning –Hardware arrives at ISR Staged until needed Mechanical work done here –Crates filled at B904 and power tested Have room for several PC crates at once Fill, Power and Test (with one CSC) –Crates installed at SX5 and Commissioned

6-Dec-05PC Commissioning4 Work at SX5 First –Prepare and install racks Its important to do as much of this for + side as possible before start of Magnet test –Heavy lifting, infrastructure Racks for PC, PC/CSC LV, HV … Second –Install Crates Install, cable and Commission

6-Dec-05PC Commissioning5 Testing Software The testing software platform is hyper- DAQ –This uses web browser windows to control and observe the tests This platform starts C++ processes on the DAQPC Tester is presented a Matrix –Vertical The crate slots –Horizontal The different tests or options available for each board type –Status –Firmware download –tests

6-Dec-05PC Commissioning6 Start the server –In the terminal window to the DAQPC as shown From anywhere –Shown here from a Windows machine –LINUX will be used

6-Dec-05PC Commissioning7 Software XDAQ opening screen Select the testing

6-Dec-05PC Commissioning8 First testing window –Set up configuration B904 Slice-test SX5 Commissioning test setup

6-Dec-05PC Commissioning9 Enter tester name Power up crate Crate configuration is found –By CC scan of crate

6-Dec-05PC Commissioning10 All boards are scanned Available options are displayed for each board type

6-Dec-05PC Commissioning11 DMB Status Displa y Result s are color coded Note CFEB infor matio n

6-Dec-05PC Commissioning12 Picking on DMB tests results in a list of tests Note the text window on screen –Text from the test is scrolled here and can be saved in case of errors

6-Dec-05PC Commissioning13 Similarly for TMB

6-Dec-05PC Commissioning14 Software Where are we on software? –Platform – well along thanks to Martin –Boards > DMB > OSU tests –VME based > installed by Martin –DDU based > to-do by Martin TMB > UCLA tests –To be done > Yangheng and Greg –System > Want to include series B tests (single CSC commissioning tests) No one designated to provide software Lots of software work here

6-Dec-05PC Commissioning15 Changes at SX5 Replaced V2 BP with PC+V3BP –LVPS changes –Cooling changes –Re-distributed boards for 9 CSC –Re-cabled both PC’s Moved V2BP to ME+1 Working on YE+2 Rack –Alexander Denisov– left –Martin von der Mey– right –Greg Rakness – hands only

6-Dec-05PC Commissioning16 SX5 Now New PC at YE+2 –Needs more fiber optic jumpers –Time-in not used before CSC New Rack and PC at YE+1 –Needs ~5m fiber optic jumpers from YE+2 –Has LVPS for ME1/1 and ME1/2(3) CSC –Will be used to integrate ME1/1 CSC into system

6-Dec-05PC Commissioning17 Summary Software for commissioning has a good start but has a long way to go –Software for many of the desired tests not started –Much has no author assigned Magnet test and commissioning interfere –Closed disks restrict space and heavy lifting –Magnet field restricts access We have to finish before lowering –Possible only under the most optimistic conditions