KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.

Slides:



Advertisements
Similar presentations
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Advertisements

Interim Life Safety Measures Eleven Administration Actions of Interim Life Safety Measures ÷Ensure free and unobstructed exits. Personnel receive additional.
High-Rise Hotels New Codes General Fire Safety Information Ted Erb Fire Prevention Officer Bellevue Fire Department April
Environmental Health & Safety Fire Safety for MSO, Medical Students and Nursing Students.
Fire Marshal & Medical Emergency Training Please Sign In
Copyright © Center for Systems Security and Information Assurance Lesson Seven Physical Security.
DSPS Safety, Prevention & Health Domain EMERGENCIES / Emergency procedure Immediately activate the building fire.
Prevent False Alarms Eugene A. Cable, P.E., M.S.F.P.E. Life Safety Consultants NEHES Honorary Member 412 Horse Heaven Road Averill Park, New York
Smoke Control Fire-Rated Stairwells Fireproofing of Structural Components Egress Lighting Fire-Resistive Construction Elements Fire and Smoke Dampers Emergency.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
Physical Security Chapter 9.
FALAR Part 3 – Post Construction  Compilation of  Maintenance records of fire protection/life safety equipment  Test records of fire protection/life.
Child Care Fire Safety Program North Carolina Fire Prevention Code 2000 International Fire Code with NC amendments. North Carolina Building Code Council.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
1/05 Fire Prevention Plan. 2 Notice  This presentation is provided to all Educational Service District 101 (ESD 101) schools at no cost.  This presentation.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
EGRESS AND FIRE PROTECTION
Business Owners and Managers and the Fire Code
Church Administrators & Emergency Planning
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.

© 2008 Delmar, Cengage Learning Property Security, Emergency Response, and Fire Protection Systems Chapter 13.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
HE UTTAR PRADESH FIRE PREVENTION AND FIRE SAFETY RULES 2005
Fire Safety in the Workplace Pupils will learn how to act when faced with a fire in a work setting.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
Fire Prevention Plan.
1 Company Profile Oct, Agenda Company Introduction Pacific Sense - Fire Safety Introduction Our Customers Environmental and Safety.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
Lesson 4 Physical Security - Motion Sensor - Passive Ultrasonic Sensor - Photoelectric System - Ultrasonic - Ultrasonic Motion Sensor - Vibration Sensor.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
ID 234 Building Codes Life Safety Diagram:Review.
Fire Prevention Facilities of Building 1 Civil Engineering Department Safety Promotion Project.
Agenda SDFD – CEDMAT Program & Staff 2013 CA Fire Code
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Chapter 6 ID 234 Building Codes Fire Suppression.
Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005.
Work Area Method Level 3 Alterations – Chapter 9 prescribes requirements. 50% of Building Area Rule.
50% LBNE Concept Design WCD Infrastructure. Mechanical.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
DRAFT US Department of Energy Underground Fire Protection Guide James Priest, PhD & James Niehoff DGS-SEE Seminar on Fire Protection for Physics Research.
Hot Work Permit Osan AB Fire Emergency Services.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
Building The topic ‘Building’ can be divided into three parts: Passive fire protection Fire protection that is built-in in the building (for example fire.
Welcome to the Safeguard IndustriesSafeguard Industries.
50% LBNE Concept Design LAr Infrastructure. Mechanical.
Emergency Preparedness & Response
Civil Courthouse 201 Caroline
Family Law Center 1115 Congress
FIRE SAFETY IN HOTEL (BIS )
Safety and Prevention of Typical Fire Plan
FIRE PROTECTION & SECURITY in ELI Beamlines
What Library Staff Should Know About Fire Safety
Wilson Hall Fire Protection Features
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Decree of the Ministry of Interior 3rd August 2015 The “so called” Italian Fire Prevention Code - IFC: S7 – Fire Detection and Alarm Systems Piergiacomo.
Design of Evacuation System for High-Rise Building Danqing Yu
Juvenile Justice Center 1200 Congress
29 CFR NFPA Life Safety Code
Introducing Fire and Safety Consulting
MINNESOTA STATE FIRE MARHSAL DIVISION HEALTHCARE TEAM
NATIONAL BUILDING CODE 2016
Criminal Justice Center 1201 Franklin
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
Fire Evacuation Procedures
Presentation transcript:

KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible but do not burn with fire Smoke is the main hazard Oils are to be kept in shielded container Evacuation to underground refuge area is considered in place of evacuation to the ground surface Access shafts are provided at 5 km distance owing to a machine layout. 5 km long tunnel constitute a fire compartment Occupant in one fire compartment is assumed to be approx. 50 persons

2 Means of Egress Travel distance of direct evacuation from the Service Tunnel to the refuge area in the access hall is too long (Max. 5 km) The auxiliary tunnels connecting two tunnels will be provided at an interval of 500 m as a means of evacuation Evacuation will be made from the Service Tunnel to the Beam Tunnel through the Connecting Tunnel and to the refuge area in the access hall through Beam Tunnel The Connecting Tunnels will be in crank shape for the purpose of shielding to substitute for a heavy door Evaluation of the safety secured by this means of egress remains to be done

3 Connecting Tunnel Scheme

4 Smoke Control In case of fire, smoke in the Service Tunnel is mechanically exhausted The Connecting Tunnel, the Beam Tunnel and the refuge area are pressurized to prevent an intrusion of smoke Fire Detection and Fire Alarm Automatic fire alarm by smoke detectors Manual fire information apparatus, located in combination with fire hydrant and emergency intercom

5 Fire Suppression Sprinklers are not proposed Fire hydrants will be installed in the Service Tunnel at interval of (TBD) Portable fire extinguishers will be placed in the Service Tunnel at interval of 60 m (TBC) Evacuation Equipment Emergency lighting of 10 lux at floor level, illuminated exit leading signs and exit signs will be installed in overall underground area

6 Communication Equipment Public addressing system with speakers in overall underground space Emergency intercom connected to the emergency control center on the ground will be installed in the Service Tunnel and the refuge area Emergency Power Supply Emergency power will be supplied to the elevator, fire detection/alarm equipment, emergency lightings exit signs and smoke exhaust system

7 Safety Control Center Safety control center will be located in the administration building on the ground It will function to watch safety status in the underground facilities as well as the surface facilities by the annunciator and indicators In case of fire, it will command the evacuation and fire fighting The direct telephone line with the local fire department will be equipped in the control center

8 Safety Equipment Following equipment shall be provided Smoke control equipment Smoke exhaust system and pressurization of refuge areas Fire detection and alarm by smoke detector Fire suppression by fire hydrant & extinguisher Evacuation equipment Emergency lights and exit signs Communication equipment Public addressing system, emergency intercom Emergency power supply Safety control center equipped with direct telephone line with local fire department