PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.

Slides:



Advertisements
Similar presentations
Project State Road 434 Outfall Ditch to the Little Wekiva River
Advertisements

City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Titusville to Edgewater Bike Loop PD&E Study
Silver Star Rd. (SR 438) Public Meeting Public Information Meeting Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road From.
Insert project map NOTICE OF PUBLIC INFORMATION MEETING Florida Department of Transportation Project History The Florida Department of Transportation (FDOT),
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
US 1 CORRIDOR STUDY AND PROJECT PRIORITIZATION PROCESS Augusta, GA November 29, 2012 Jeff Carroll CDM Smith Georgia Association of MPOs Annual Conference.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Core Monitoring Guide 2005 National Equal Opportunity Training Conference.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Civil Rights Rhode Island Department of Education Child Nutrition Programs September 17, 2014.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Name Title Location, Kansas Helping People Help the Land.
Equal Opportunity and Compliance Renisha Gibbs, SPHR Assistant Vice President for Human Resources/ Finance and Administration Chief of Staff August 17,
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
ORANGE COUNTY HUMAN RIGHTS ORDINANCE Chapter 22 of the Orange County Code Presented to the Board of County Commissioners November 23, 2010.
OHIO STATE UNIVERSITY EXTENSION Document Title Sub d OSUE SNAP-Ed Adult or Parent Curriculum (change per participant). SIGN UP FOR COOKING CLASSES TODAY!
FIELD TRIPS Keeping Food Safe on the Go! North Carolina Department of Public Instruction Safe and Healthy Schools Support Division School Nutrition Services.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
PUBLIC HEARING Draft Amendments FY 2011/12 – 2015/16 Transportation Improvement Program (TIP)
CIVIL RIGHTS FOR SCHOOL NUTRITION PROGRAMS Presented to School Nutrition Managers and Employees North Carolina Department of Public Instruction Safe and.
2013 CDBG Recipients' Workshop Fair Housing/Equal Opportunity.
STA Safety Project PID #76439 December 12, 2006.
Uniform Complaint Procedure Memorandum # MEM-560 October 10, 2003 By: Jaime Morales.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
You may use this slide before your presentation begins. If you choose not to use this slide, delete and start with Slide 2 in presentation.
MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information.
Civil Rights & USDA Child Nutrition Programs 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
State Route 268 Rutherford County, TN DESIGN PUBLIC MEETING June 2, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Road Wise Roadway Markings and Traffic Signals Passenger Safety Texas A&M AgriLife Extension Service in cooperation with Texas Department of Transportation.
HAMILTON COUNTY SR-317 (Bonny Oaks Drive) Widening From SR-17 to I-75 January 21, 2016 Robert Rodgers - C.E. Manager 2 TDOT Region 2 Project Development.
SEMINOLE COUNTY Financial Project IDs: & Public Meeting December 6, 2011 Presented By: Stephanie Ghezzi, PE.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.
Updates from Previous Requests and Subcommittee Meetings.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Visit Our Website at: Click to edit Master title style.
S.R. 520 (West Merritt Island Causeway) SR 520 (West Merritt Island Causeway) From West of Myrtice Avenue to S.R. 3 Courtenay Parkway FPID
ADA/504 Technical Assistance Tool Ken Woodruff, Civil Rights Program Manager, FHWA.
WELCOME! Please sign-in at Front Desk and pick up a Project Brochure and Speaker Request Card Feel free to review project displays and discuss project.
us 30 and SR 603 – Ashland county September 7, PUBLIC meeting
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Chapin Town Hall Meeting
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
Begin Project End Project Welcome to the SR 530/US 192 Highway Improvement Project Informational Meeting Thursday, February 8, 2007.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
US1 AT CANAL STREET INTERSECTION DESIGN DEVELOPMENT
Florida Department of Transportation
S.R. 30 (U.S. 98) Tyndall Parkway
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
Event Photo Event title (Event host’s name) Event time and date
Charter Applicant Informational Meeting: New CHARTER SCHOOL Application Submission June 5, 2019 at 9:30 AM Location: KCW Board Room, 600 SE 3rd Avenue,
Polk Transportation Planning Organization
Presentation transcript:

PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia County October 7, 2010 Derek Dixon Consultant Project Management

Ridgewood Avenue / U.S. 1 / S.R. 5 MEETING AGENDA Exhibit Review Slide Show Presentation One-On-One Questions and Answers Comment Forms

Ridgewood Avenue / U.S. 1 / S.R. 5 TITLE VI & TITLE VIII COMPLIANCE This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation. The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, and Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI and/or Title VIII may do so by contacting the FDOT, District Five, Title VI and VIII Coordinator Lorie Wilson, 719 South Woodland Boulevard, Deland, Florida or the Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station 65, Tallahassee, FL All inquiries or complaints will be handled according to FDOT procedure and in an expeditious manner.

Ridgewood Avenue / U.S. 1 / S.R. 5

PROJECT CORRIDOR Project begins north of Falcon Avenue Project ends north of Lamont Street Total Length = 2.1 Miles

Ridgewood Avenue / U.S. 1 / S.R. 5 PROPOSED IMPROVEMENTS Reconstruct Median to Reduce Crashes and Improve Safety Install Directional (Left Turn Only) Median Openings and Full Access Median Openings per Current Criteria Repave Existing Pavement in Median Install New Pavement Markings and Traffic Signs Maintain Existing Signalized Intersections Maintain Existing Through Lanes (No Widening or Shifting) No Right-of-Way Required

Ridgewood Avenue / U.S. 1 / S.R. 5 ACCESS MANAGEMENT BENEFITS Access Management Reduces Conflict Points and Crashes:

Ridgewood Avenue / U.S. 1 / S.R. 5 IMPROVEMENT JUSTIFICATION Recommendations and Justification Documented in an Access Management Study conducted by FDOT in 2009 Study Considered Reported Crashes between 2005 and 2007 (135) and Anticipated Crash Reductions Safety Impacts to Project Corridor (per FDOT Study): Crash Type ReportedCrashes Reduced (%) Rear End477 (15%) Angle3120 (64%) Left Turn103 (30%) Other470 CRASHES REDUCED:30 (22%)

Ridgewood Avenue / U.S. 1 / S.R. 5 ACCESS MANAGEMENT CRITERIA SR 5 / Ridgewood Avenue Access Management Classifications: - Access Class 3 (South of Indian River Boulevard / SR 442) - Access Class 5 (North of Indian River Boulevard / SR 442) Per Chapter of the Florida Administrative Code: Increased Spacing of Median Openings Allows Construction of Appropriate Length Left Turn Lanes (285’ Recommended) Median Openings Should Not be Present Within Influence Areas near Signals = Storage + Deceleration + Reaction Areas (Violates Driver Expectancy) Access ClassFull Median Opening SpacingDirectional Median Opening Spacing Class 3½ Mile (2,640 feet)¼ Mile (1,320 feet) Class 5¼ Mile (1,320 feet)1/8 Mile (660’)

Ridgewood Avenue / U.S. 1 / S.R. 5 Reduced Crashes Improved Traffic Flow Aesthetic Improvements Benefit (Reduction in Crashes) to Cost (Improvements) Ratio = 8.2 (per Study) ACCESS MANAGEMENT BENEFITS

Ridgewood Avenue / U.S. 1 / S.R. 5 TENTATIVE PROJECT SCHEDULE Design Begin: Winter 2010 Final Public Information Meeting: Summer 2011 Design Complete: Spring 2012 Construction Letting: Fall 2012 Construction Complete: Summer 2013

Ridgewood Avenue / U.S. 1 / S.R. 5 COMMENT FORM Please Feel Free to Obtain and Complete a Comment Form: Form to be Completed and Mailed by October 21, 2010 (Mailing Address Pre-Printed On Form)