ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:

Slides:



Advertisements
Similar presentations
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
V. Bobillier1 Cable installation status.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
The LHC RF Power Systems Skip the intro… CWRF08 workshop - March'08 1 Presented by : Luca Arnaudon Slides by : Olivier Brunner & Luca Arnaudon Important.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
TC meeting P2 planning wks 3&4 A.Tauro
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
ELENA installation progress F. Butin / ELENA collaboration.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
S A Griffiths CM42 June 2015 Electrical & Control.
Teleconference ACS – FREIA 31th May 2017
CC LLRF SM18 test plan and BA6 infrastructure
Cryomodule test stand at ESS site
MICE RF System Power Supplies, Control and Monitoring Status report
1.3-GHz Cavity Vacuum Furnace at IB4
BA6 – crab cavity activities in EYETS
LHC-RF activities in LHC PT 4 TS2 YETS LS2
RF interlocks for higher intensities (LMC 15 June)
on behalf of the RF group
Test plan of ESS HB elliptical cavity
SPS EN-CV Planning LS (initial draft)
352MHz Klystron Control for the 3MeV Linac test stand
XFEL Vacuum System Commissioning
RF cables calibration Matteo Volpi Thomas Geoffry Lucas
ACS news Circulator TCU: control tests in progress All cavity racks
First Assembled Rod in US
The spoke CM tests at FREIA
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Preparation for Installation at ESS
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test: DONE re-installation of equipment (pressure valves etc): DONE procurement of demineralized water & final tests: wk9 Pending/ongoing: arc detector installation: in progress cavity racks installation (Daniel’s racks): in progress

ADT news RF cables: in progress Intlk&io tests: starting next week! Pending : MUX (Andy-Daniel) Define patch panels Install equipment Predrivers (Daniel) Rack cleaning

HV bunkers & power converters install flowmeters TS/CE: DONE (except 4 holes!) SC (Salomon): first visit: DONE next round: detailed inspection... inspection of AB/PO: not organized yet! Upgrade of electrical cells (TS/EL): cabling wk 9 – 11 (waiting for confirmation) New ICs: 1 week stop in 3 months Pending: Spare power converter to be re-cabled (AB/PO) HV limiter (automatic crowbar firing system): in progress

Faraday Cages Urgent: check RF connectors & cable calibration badly mounted connectors: problem fixed false floor: DONE Pending: Doors (contact & key)?

Platform HOM loads installation of cable trays (Nicou & FSU) Cryo: installation of ACS cav He press meas: wk7 (not finished) RF cables installation (Nicou&Co.) CavFWD cables CavRFL cables Arc detectors (C.Nicou) Pull cables + 1 additional cable (daniel) Install equipment Zone cleaning clean all zone after TS/CV chilled water installation: DONE

RUX45 WRL installation: in progress ACS Modules: in progress MC Couplers mount MC couplers mechanics (starts next wk) cable MC couplers connect to WG Install and cable Arc detectors CALIBRATE ANTENNA CABLES - Ph. B./JCP ?? Vacuum ctrl chassis: AT/VAC late: missing PLC chassis...in progress

RB’s ADT, APW Install amplifiers (Eric) cabling & cable testing: in progress Q7-Q9-ADT prepare and install patch panels (Eric): STARTED install ADT electrical distrib box (TS/El): ? water cooling connections (Eric): DONE replace/repair few RF cables check connection to earth

SR4 Install GPS antenna – in progress Produce DIC: DONE?? False floor Install chassis Cleaning (zone, racks) Ventilation upgrade (JCP)!!