Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects July 2009.
Advertisements

Update on FCPS Construction/Renovation Projects May 2009.
C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 G OLF A ND C OUNTRY C LUB C HANTILLY N ATIONAL Restoration and Renovation.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
May 6, 2010 Irvine Unified School District HMC Architects.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
SCHEMATIC DESIGN PRESENTATION
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Community Meeting September 9, 2015 COMMUNITY CENTER IMPROVEMENT PROJECT BENNING PARK COMMUNITY CENTER.
North Augusta High School Design Development Presentation.
December 3, 2015 TOWN OF MILLBURY DPW, MA Robert McNeil, P.E., Director PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer This project.
Elevating the Quality of Life in the District LAFAYETTE ELEMENTARY SCHOOL MODERNIZATION PROJECT UPDATE DECEMBER 15, 2015.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
Bond Oversight Committee February Time Topic Presenter 6:00 PM Introduction Curt Martin and David Slattery Staff Reports 6:10 PM Finance Karen Wilson.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
St Chad’s Catholic Primary School. January 2004 St Chad’s Catholic Primary School Phase Two new junior classrooms added.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Miller Driscoll Building Committee Construction Update Thursday February 4, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions &
Building Committee Presentation March 03, MAIN ENTRANCE.
White Pigeon Community Schools
2015 School Bond Construction Program
Bond Oversight Committee
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Multistory Office Building
Designing a Commercial Shopping Center
Design of a Commercial Shopping Center
Multistory Office Building
ET 494: Senior Design Design of a New Hammond Head Start Center
UNION GROVE ELEMENTARY REFERENDUM
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
Minuteman Vocational Technical Regional High School Progress
Carleton College Summer 2018 Science and Campus Construction Plan
Progress Report 11/10/11.
1 Semester Project Design A Multi Story Office Building
Minuteman Vocational Technical Regional High School Progress
2007 Bond Issue Capital Improvement Program
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Project 2018 October 31, 2018.
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
North Augusta High School – Phase 2A and 2B
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
EAST PENNSBORO AREA SCHOOL DISTRICT
2015 January February March April May June July August September
21st Century School Buildings Plan
Presentation transcript:

Elevating the Quality of Life in the District

Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE – AUGUST 2015 TO APRIL 2016  TIMELINE – EASTER BREAK 2016  TIMELINE – APRIL 2016 TO JULY 2016  ACCESS & FLOW  Foundation to Grade Building Permit  Building Permit  NEXT STEPS  18, Feb. to 3, Mar. Activities two week look ahead.  Construction Images of Courtyard & 1956 Building.  Construction Milestone.  Frequently Asked Questions.  Q & A Elevating the Quality of Life in the District

RULES OF THE ROAD  RESPECT EACH OTHER  CELLPHONES OFF OR ON VIBRATE  Q&A WILL BE TAKEN AT THE END OF THE PRESENTATION

Elevating the Quality of Life in the District

AFTER RENOVATION BEFORE RENOVATION

Elevating the Quality of Life in the District AFTER RENOVATION BEFORE RENOVATION

Elevating the Quality of Life in the District BEFORE RENOVATION AFTER RENOVATION

Elevating the Quality of Life in the District AFTER RENOVATION BEFORE RENOVATION

Elevating the Quality of Life in the District BEFORE RENOVATION AFTER RENOVATION

Elevating the Quality of Life in the District SECTIONS

Elevating the Quality of Life in the District

CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015

Elevating the Quality of Life in the District

CONSTRUCTION STRATEGY  TIMELINE – AUGUST 2015 TO APRIL 2016

Elevating the Quality of Life in the District

TIMELINE AUGUST 2015 – APRIL 2016 UNDER CONSTRUCTION EGRESS DURING CONSTRUCTION LOGISTICS AND PHASING PLAN ARE CONTINENT UPON OBTAINING PERMITS AND DOEE APPROVALS PER TURNER’S SCHEDULE

Elevating the Quality of Life in the District CONSTRUCTION STRATEGY  TIMELINE – EASTER BREAK 2016

Elevating the Quality of Life in the District TIMELINE EASTER BREAK 2016 UNDER CONSTRUCTION LOGISTICS AND PHASING PLAN ARE CONTINENT UPON OBTAINING PERMITS AND DOEE APPROVALS PER TURNER’S SCHEDULE

Relocation of IT Closet 1970 Building

Relocation of IT Closet 1970 Building STORAGE ROOMS SHEPHERD ELEMENTARY SCHOOL PHASE Proposed Program Area per Area perRoom WORKROOM - 1 (First Floor Building 1931) % WORKROOM - 2 (First Floor Building % TOTAL FOR WORKROOMS % STORAGE BOOK STORAGE (Ground Floor) % STORAGE - 2 (First Floor Building 1970) % SUPPLY STORAGE/RECEIVING (Ground Floor) % TOTAL FOR STORAGES 1, %

Relocation of IT Closet 1970 Building

Elevating the Quality of Life in the District CONSTRUCTION STRATEGY  TIMELINE – APRIL 2016 TO JULY 2016

Elevating the Quality of Life in the District

TIMELINE APRIL 2016 – JULY 2016 UNDER CONSTRUCTION EGRESS DURING CONSTRUCTION LOGISTICS AND PHASING PLAN ARE CONTINENT UPON OBTAINING PERMITS AND DOEE APPROVALS PER TURNER’S SCHEDULE

Elevating the Quality of Life in the District TWO CREPE MYRTLE TREES WILL BE RELOCATED 1 2

Excavation & Demo in Courtyard

Installation of Foundation System & Elevator Pit in Courtyard

Courtyard Retaining Wall Installation

Courtyard Concrete Slab Installation

Erection of Structural Steel in Cafeteria & Roof of 1956 Building

Erection of Structural Steel in Cafeteria & Sprinkler of 1956 Building

Erection of Structural Steel in the 1956 Building

Courtyard Concrete Slab Retaining Wall & Elevator Shaft Installation

1956 Building Addition Structural Steel Installation

1956 Building Addition Structural Steel, Framing Installation

1956 Building Addition Structural Steel Installation

Entrance Structural Steel Installation

Courtyard Structural Steel & Sprinkler Installation

1956 Building Addition Metal Deck Installation

1956 Building Addition Concrete Slab Installation

1956 Building Addition MEP Installation

1956 Building Addition Structural Steel Framing and MEP Installation

Courtyard Steel and Opening Installation

Playground Entrance Steel and Opening Installation

Elevating the Quality of Life in the District TWO CREPE MYRTLE TREES WILL BE RELOCATED 1 2

Infiltration System Impact Crepe Myrtle Trees in Images

Infiltration System Impact Crepe Myrtle Trees Relocated

Silver Maple Tree Impact Relocated Crepe Myrtle Tree

Elevating the Quality of Life in the District CONSTRUCTION MILESTONE  COMMENCEMENT OF CONCRETE WORK; OCTOBER  COMMENCEMENT OF ELEVATOR SHAFT; NOVEMBER  COMMENCEMENT OF COURTYARD STRUCTURAL STEEL; DECEMBER  JANUARY  COMMENCEMENT OF MECHANICAL, ELECTRCAL & PLUMBING WORK  INFILTRATION TRENCH INSTALLATION  SPRINKLER MAIN SERVICE LINE INSTALLATION PARKING AREA  CONCRETE SLAB ON DECK INSTALLATION  1956 ADDITION EXTERIOR FRAMING

Shepherd ES Logo in Courtyard & Mural

Frequently Asked Questions 1. Will the asphalt area on the playground be repaired or replaced? Answer:- The asphalt will be repaired 2. The Mural on the concrete wall will not be impacted by the construction Activities. 3. All Egress routes are accessible during Construction Per Building Codes. 4. Air monitoring scheduled to be performed once per month. 5. Memorial Gardens will be restored.

Elevating the Quality of Life in the District NEXT STEPS TWO WEEK LOOK AHEAD  EXCAVATION ON INFILTRATION TRENCH AT SOUTH SITE  EXCAVATION OF SPRINKLER MAIN LINE PARKING AREA  ERECTION OF STRUCTURAL STEEL IN COURTYARD AND 1956 BUILDING  INSTALLATION OF 1956 ADDITION EXTERIOR FRAMING  INTERIOR PARTITION INSTALLATION  MEP INSTALLATION

Kenneth Diggs DGS Associate Director DGS Government Affairs & Communications (202) Elevating the Quality of Life in the District