1 st Petal Prototype Fabrication completed October 27, 2008.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Step-by-step assembly instructions
ATLAS Module building at Glasgow
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Specification section 3.3
Status Update on Mechanical Prototype in Rome November 6,
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Tube to Foam Interface (Tim). Outline Discuss what’s known about the tube to foam interface – Describe problem – Issues – Theoretical Calculations – Anecdotal.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
Recent Mechanical Barrel Stave Development BNL; S. Duffin, A. Gordeev, D. Lynn, G. Mahler: LBNL; C. Haber, M. Gilchriese: Yale; W. Emmett, A. Martin, P.
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Co-Cure Stave Construction 11/10/2010. Co-Cure cables should have flashbreaker tape still covering the surface for this process. SO - don’t remove the.
Progress on staves – mechanical & thermal. Core and materials.
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
WP4 – Plans for next 6 months
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
BNL & Yale Mechanical Stave Developments BNL: David Lynn, Marc-Andre Pleier, Anatoli Gordeev, Russ Burns, Ken Sexton Yale: Paul Tipton, Will Emmet, Tom.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Materials R. Bates. Contents What we said that we would do What we have done – What is left to do from original list New things to add.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Stave production.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Stavelet 09 and Storage/Assembly/Survey Frame Progress Report Brookhaven National Laboratory David Lynn, Susan Duffin, Anatoly Gordeev, Ken Sexton Yale.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
ATLAS Internal ID Service Integration
Summary LBNL LSWG meeting
Strip Petals: Local supports and prototype tests
Are there better ways to build a stave?
Hybrid Issues.
Hybrid Pixel R&D and Interconnect Technologies
A comparison of Some Properties of Sandwich Test Tokens with Various Core Materials (Tim)
WP4 – Plans for next 6 months
Reminder of Stave250 Tooling Design
Equipment for Assembly – UK Experiences
Material Studies for HL-LHC Strip Stave Design
Step-by-step assembly instructions
Materials R. Bates et al..
Pixel module assembly tooling
Presentation transcript:

Stave Tooling & Plans for Future Stave-building (Tim)

Stave Assembly Tool Update Development of 2 nd generation Stavelet assembly tool – CF / Nomex sandwich construction – Brass inserts for dowels & threaded holes – Steel plates for magnetic chuck – Vacuum channel formed in FR4 – Ground CF top plate

Trial Assembly Studies Stave Components – Facesheets K13D2U/RS3 panels 1.3m x 0.31m (0/90/0) Cut out on pattern cutter – Honeycomb Nomex grade N636 (Korex replacement) – mm cell / 28kg.m -3 (1.75 lbs/cuft) Laser cut (1 st go as a trial) – ‘C’-channels Original manufacturing tool – slight lip on open edges (need to re-make tool to improve) – End Close-outs Peek (from QMUL)

Laser-cut N636 Honeycomb Honeycomb is not as ‘uniform’ as Ultracor CF Stress-free cutting results in good edge definition & perpendicularity Slight charring of edges

C-channel Jig 2 C-channels loaded into Jig Jig located on assembly tool using locator blocks Holes match !!!

Next Steps Manufacture of dummy stave – No cooling tube, no Allcomp foam – Steps (start tomorrow) End close-outs Honeycomb Grind Attach 2 nd side Manufacture of 1 st full stave – Cooling tube (from RAL) – Poco foam (have some left) – Steps Full assembly sequence

Low-density Adhesives / Stencils Single (few) use laser machined stencil from thin plastic (eg Perspex) 3/8” CF honeycomb has good cell uniformity so maybe glue can be applied to facesheet using a stencil – Trial stencil manufactured from 0.5mm thick Perspex – Area coverage 23% – Glue volume = 10cc / stavelet Low viscosity of neat Hysol 9396 means glue easily flows between stencil & CF face sheet – Looking into glass micro-balloons to increase viscosity & reduce glue mass (ρ≈0.67gcm -3 )

First Trials

Possible Extension Multi-use pattern – Thermal foam – ‘C’-channels & honeycomb Alternative Patterns – Corrugated core

Summary Aim to manufacture 1 or 2 dummy staves (<4 weeks) – General ‘training’ (assembly techniques & machining) – Flatness measurements – 3 point bending Move to Full Stave (4-6 weeks) – Use remaining Pocofoam – Need cooling tube – Maybe new ‘C’-channel jig ? Further investigations of stenciling – Thinner material (eg. 0.35mm Mylar) – Probably only applicable to large cell & very uniform honeycomb