ICARUS Collaboration Meeting 29-30 Dec. 2010 A. Scaramelli.

Slides:



Advertisements
Similar presentations
DOORS AND WINDOWS.
Advertisements

HVAC523 Heat Sources.
Engineering Sound CSUF - Meng Concert Hall Mark E. Rothermel Principal Rothermel & Associates, LLC Architectural Acoustics Collaborative.
Containers, container handling History of the container Idea of rationalizing goods transport by avoiding the constant loading and unloading from one means.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
“Design of Water Supply and Sewer Systems” IV. Water Tank (Service Reservoir). Dimensioning and Constructing (Drawing 4) Main Procedures 1. Determination.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
TRANSPORT of ICARUS from LNGS to CERN Alberto Scaramelli INFN-Milano Following the meeting at LNGS on 11-12/9 Last News 102/10/2014A. Scaramelli.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
TRANSPORT of ICARUS from LNGS to CERN Alberto Scaramelli INFN-Milano Following the meeting at LNGS on 11-12/9 118/09/2014A. Scaramelli.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
ipno.in2p3.fr Badesi - Sardinia - May 2006IPNO-RDD-Jean Peyré1 1.Status of ST1 2.Status of integration of ST1 and ST2 Jean Peyré Badesi - May.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Transport and handling at CERN for FAIR
Specifications for JOOLZ 409- based on the current prototype (as taken by AOK)
RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.
Name ________________ Unit 6/P6 – Concrete Construction Expensive Heavy and dense = strong, sound proof and thermally efficient. Cast in situ or pre-cast.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
The integration of 420 m detectors into the LHC
Increase of the T600 maximum drift distance and preliminary considerations for larger aluminum vessels Claudio Montanari INFN-Pavia, Italy 1ICARUS Meeting.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
BUILDING CONSTRUCTION
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Scorpion is a remote tester specifically designed for testing ASD systems. Scorpion is compatible with the FAAST aspirating smoke detector. It is particularly.
EHN1 Cryogenics Integration
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
CLIC Handling Engineering Update
LBNF CAD models, Drawings and Component list
Schedule CM SPS G.Vandoni.
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
SBN Far Detector Installation & Integration
IT-4189 Supply and installation of a cryogenic distribution system
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
VELO-installation meeting CERN, January 17, 2006
Experimental hall design in Japanese site
INSTALLATION SEQUENCE
Detector hall in mountain regions
EHN1 Neutrino Installation Plans
UK RFD Pre-Series cryomodule
Initial BIS installation
Detector hall in mountain regions
Mastering Autodesk Revit MEP 2016 CHAPTER 19: Creating Equipment
TEC assembly and commissioning at Lyon
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

ICARUS Collaboration Meeting Dec A. Scaramelli

Moving ICARUS from LNGS to CERN Tranport of all the ICARUS system, including cryostats, like they are, but without their thermal isolation Transport of the ICARUS system, without the cryostats, including wires chambers (internal detector) Cost estimate Many thanks to CERN Transport Group

Works made after 2005 in Hall B General increase of the Hall B floor level by 30 cm Construction of a concrete bump of about 25cm height between the Hall B and the TIR gallery Installation of WARP Installation of the OPERA barrack Installation of other minor devices

General increase of the floor level in Hall B

Works made after 2005 in TIR Gallery Installation of fire resistant doors (so called filters) reducing height (from 4,75 m to 4,6 m) and passage by 20 cm Installation of a ventilation duct on the top of the tunnel with an overall height from the floor of 4,6 m Installation of a Linde new Tank, reducing the passage to 4.3 m

Scope of the Transport 2 cryostats containing wire chambers (ext. dimensions 3970x4403 mm by 20’209 mm length) ; unit weight = 48,5 t Structures and equipments for a total volume of ~1’800 mc (26mx11mx10m – 2 tanks) composed of: – 2 tanks 30 m3 – 5 pumping groups – 100 electrical cupboards – Cryogenic material (tanks, pipes, filters etc) – Metal structure, – Bulk material – Stirling Nytrogen liquefaction system

Present situation

Cryostat movement in present conditions Several clashes on floor and walls

Requested Floor modification (300mm)

Moving cryostats: works to do in Hall B Dismantling of the bump Reduction of the floor level of Hall B by 30 cm for ~10 m from TIR gallery Dismantling of OPERA barrack Dismantling of the WARP clean room (?) Removing of the lamps and minor equipment around the door

Works in TIR Gallery Height of the truck = 275 mm, so the overall height of the convoy is = 4675 mm which is not compatible with the door height. MUST BE TEMPORARY REMOVED: All new doors in west direction (filters) The air duct recently installed in the vault of TIR gallery The Linde tank

Air Pads Using Air pads in TIR gallery is not technically feasible for the following reasons: The height of pads is > 10 cm Doors have steps on their base (height = 14-15cm) The overall height in this configuration will be 4,5 m. The pads rails must have ramps to jump the steps. The cryostat passing on the step will be tilted and will hit the following door and the air duct Once the step passed, the bottom of the cryostat will touch the step bump.

Moving the Internal Detector Opening the front wall (door) Dismantling of a part of the tubes and wires to accede to the fix point and unblock it. This is necessary for access to feet Lifting of the assembly with jacks (how many? Lifting points?) Inserting rails and chariots under feet Reassembling of wires and tubes Traction of the whole wires chambers in a transport structure to guarantee the structural stability, a support truck interface and weather resistance

Internal Detector + frame for handling

Open problemes Shape, dimensions, fix point accessibility and interference to check Position, shape, tooling, rails and support requirements Possibility to lift the structure with jacks for inserting rails ‘Tractionability’ of the whole (the inner structure shall offer pulling points and have sufficient static resistance to avoid damaging of the wires + tubes) Maximum admissible tilt for both horizontal planes Interface points with transport structure

Positive issues The total weight of the transport structure + detector is < than 40 t, permitting the use of the crane and an easier rotation maneuvre, with a significant reduction of the number of objects to dismantle: -Doors -Air duct -Floor of Hall B

Must be removed in any case Bump in Hall B OPERA barrack Linde new tank

Cost Estimate 2 x Cryostats (Special transport) 100 k€ 15/20 trucks (1.5 k€ each) 30 “ Dismantling ICARUS in LNGS (5 m/month) 40 “ Various items 50 “ Total 230 k€ Works in LNGS galleries are in charge (!?) to LNGS

Conclusions The ICARUS cryostats trasport from LNGS to CERN is feasible for a cost estimate relatively acceptable Heavy works in LNGS schould be done Themal Isolation will be destroyed Project for new cryostat schould start asap