Presentation is loading. Please wait.

Presentation is loading. Please wait.

Powerol – Customer Care Telecom Service

Similar presentations


Presentation on theme: "Powerol – Customer Care Telecom Service"— Presentation transcript:

1 Powerol – Customer Care Telecom Service
CaPS - Action plan for Improvement

2 Content Objectives and Methodology Summary F12 – Customer Voice
F12 – Action Plan F13 – Customer Voice F13 – Action Plan F14 – Customer Voice F14 – Action plan

3 Overview : Objective To measure CaPS (Customer as Promoter Score) for Powerol - Customer Care Methodology Survey conducted by Mahindra Corporate Office. Target Group Powerol customers –Telecom & Retail Customers Sample Size (In Numbers) Formula for CaPS Calculation: Customers giving response ranging from ‘0 to 6’ are ‘Detractors’ Customers giving response ‘7 & 8’ are ‘Passives’ Customers giving response ‘9 & 10’ are ‘Promoters’ CaPS (%) = % Promoters - % Detractors Result: Above 50 is a GOOD score F12 F13 F14 20 23 32

4 CaPS trend Mean: 9.17 Mean: 8.88 Mean: 8.45
CaPS score has declined as compared to the last Year. After the comparison, we can see that there is an increment in Passives and there are no Detractors Focus should be on gaining more and more promoters by reducing Passives

5 F12 CaPS – Strengths and Weakness
Customers Response F12 Strengths/ Weakness % Promoters 40 Strength 1. Mahindra offers much better service compared to other suppliers. 2. It is a supportive company 3. They have a strong dealer network Weakness 1. Quicker services, accessibility of managers when required. 2.A more developed product emitting less sound should be available at the same price. 3. They should conduct regular training at filed level to reduce breakdowns. % Detractors 5 % Passives 55 CaPS Score 35

6 F12 CaPS Action plan SN Weakness Key action taken in F13 1
Quicker services, accessibility of managers when required.  Monitoring of Service Level Adherence (SLA) - Improvement action plan 2 A more developed product emitting less sound should be available at the same price. Developed process for Technology development & technologies are developed on key success factors – Fuel efficiency, NVH(Noise), DG foot prints & Alternate fuels Example: Super Silent DG sets developed and supplied in J&K and Assam NE states 3 They should conduct regular training at field level to reduce breakdowns. On site and classroom trainings carried out for Customer and MAGIEC technicians

7 SLA improved to 89% against plan of 90%
SLA Improvement Action Issue Activity Result Reference Capability issue resulting into high fault count Technicians training continued in F13 thru intensive training programs. 73% trained technicians. Special training batches conducted for electrical Training records & presentation High Fault Count TPM activities started in areas of West Bengal, NESA, Bihar and continued already running activity at J&K. These were the major concerned areas as far as SLA /FC is concerned With above activities reduced FC to 5% in F13 from 7% in F12 Refer TPM activity SLA improved to 89% against plan of 90% Remaining Issues Of F13 Still FC UPE,UPW,J&K,AP,KER,NESA,BH,JH,WB remained concern whereas other are better off, though still need improvement. Since achieved 89% against 90%, need to revise the targets in F14 as a continuous improvement policy and deal with new challenges. Based on feedback of MAGIECS in various state meetings, got understanding of reason for delayed manpower deputation as complaint closing is clubbed with site PM. Learning in F13:

8 Structured Process followed for new technology development
Development of new technology for innovative products Structured Process followed for new technology development Additional Information Customer Satisfaction Index Customer as Promoter report Market Requirements, Surveys Win Loss Analysis Technology Trends Legislative Requirements Competitive Benchmarking Know your Customer Customer Care Sales PAE PSM CFT INVOLVEMENT FOR INPUTS Prepare current Technology table w.r.t competition Identify Key Success Factors (KSF) Identify Options Evaluate Options Technology Readiness Testing and Validation Build Prototype and prepare DVP Make Technology Development Plan Prepare Technology Road Map Customer & Emerging Customer Needs → Long Term Technology Roadmap

9 58dB Development of Ultra Super Silent DG
Development of 25 kVA Ultra Super Silent DG Additional Information Customer Need : “DG for deployment in Noise Sensitive areas” 58dB Thought for lateral industry where low noise required Ideation Insight Regulatory requirement: 75dB Automotive Cabin Noise Approached 25kVA Ultra Super Silent DG Foam testing Lab Mahindra Research Valley Developed Absorption Barrier Absorption Technology Technology Deployed Technology Developed 1st in the world, Patent Filed One of the best NVH facilities in Asia Competitors do not have such facilities in India

10 Product, Genset Basics, Operation & Maintenance
Customer Trainings – Conducted in F13 Programme name Programmes Bharti Infratel Indus Towers Reliance Jio Participants DCDG Training 2 10 Product, Genset Basics, Operation & Maintenance 8 13 36 49 Grand Total 59

11 Customer Trainings

12 Service Technician Capability Improvement
5.3.3 a. Taking responsibility for ‘end to end’ services for DG sets Service Technician Capability Improvement Service Technician Capability Improvement Dedicated Training Team & Training Centers (8 locations) Customized training modules as per Skill Matrix Training through class room sessions & working on Practice Models Training effectiveness measurement Self Learning through online training modules (need based) Additional Information We raised Skills & Capability using PDCA approach … Skill gaps identification thru skill mapping, prepared customised Training modules, Carried out trainings, measured Training effectiveness & Implemented Self learning "e modules" Step 1 Identify Skill gaps & prepare training plan Step 2 Release annual Training Calendar Step 3 Execute training with Pre & Post training assessment Step 4 Overall Training Feedback Step 5 Training effectiveness - 90 days PLAN DO CHECK & ACT

13 Improve DG Availability
Effects: Service Technician Capability improvement Better With all efforts, we Improved Trained manpower % to 77%

14 User & Expert increased to 64% from 30% → Improve Service Quality
Improve DG Availability Effects: Service Technician Capability improvement Raised % of Users & Experts to 64% with focus to Improve Service Quality User & Expert increased to 64% from 30% → Improve Service Quality

15 F13 CaPS – Strengths and Weakness
Customers Response F13 Strengths/ Weakness % Promoters 96 Strength 1. Good Services provided by the company. 2. Good Staff, co-operative,supportive and committed Weakness 1.Better servicing needed - timely, quicker, more efficient, regular, proactive 2.Technologically advanced - faster website, use soft copies in billing instead of hard copies % Detractors 4 % Passives CaPS Score 92

16 F13 CaPS Action plan SN Weakness Action plan for F14 1
Better servicing needed - timely, quicker, more efficient, regular, proactive Ensure better PM quality through eFSR implementation and horizontal deployment of TPM in 981 sites 2 Technologically advanced - faster website, use soft copies in billing instead of hard copies. eFSR and eCONNECT launched, enabling us to provide reports in soft copy Quicker response

17 Concerns in Pre-eFSR System
FSR Quality gaps : Incomplete details; Illegible writing; illegible Customer reps signatures; Lack of authenticity (Photograph); Technician tracking; Use of local language Gaps & Lack of Trust of Customers due to poor FSR quality Huge paper usage for FSRs i.e. 4 X 3 lac A4 size sheets + Photocopying, courier & handling cost etc. Human dependency since data is not available centrally & Data quality is depends on technician skills. FSR Management is difficult since whether effect (Rain / humidity); Site condition (Oil / Dirt etc.) Non Standard report format. Huge Efforts to Compile, Validate & manage service details. ?

18 eFSR FSR quality Direct Online Technician tracking Real Time
Brainstorm Speed up support document compilation Major Issue Identified Prioritization / Focus Project Selection FSR Quality Transit delay Data compilation Data Storage FSR site environment Analytics not available No Tracking of Service delivery team Training Awareness Online bill processing FSR quality Direct Online Technician tracking Real Time Photographs Mobile application to capture FSR.

19 Alternative Thinking : eFSR
FSRs to be … Electronically made legible & uniform Multi-language display capability All data / values of FSR / PM check sheet to be captured FSRs to be virtually loaded in M&M Web system directly from field Validation through photographs , Time & Date of work start & completed, Customer signatures, Location Tracking. Provision for spare part entry. Based on eFSR data report should be available on portal, for Income billing POWEROLSUVIDHA Infrastructure GPRS Mobile Application

20 Major TQM Activities eFSR

21 IT enabled eCONNECT & eFSR
4.5.2 d. eFSR & eConnect IT enabled Complaint handling (eConnect) & eFSR Process IT enabled eCONNECT & eFSR Key Features IT enabled Complaint tracking system –eConnect Prompt & Quality Escalation mechanism IT enabled Field Service Report – eFSR Error free eFSR Quality of PM Ensure adherence to PM Real time compliant registration & acknowledgment to Customers Reduction in delay in payment User-friendly & available 24*7 Assignment of MAGIEC Actual job carried out with on job recording through eFSR Submission of eFSR Complaint Closure Intimation mail to customer Through eCONNECT Customer Logs Complaint through SMS at eCONNECT Leveraged IT for enhancing Customer Satisfaction & Business Benefits DTQMP reference page : 40

22 Field service performance and quality up-gradation - TPM
Major TQM Activities Field service performance and quality up-gradation - TPM Based on Learning Systematic three Step approach initiated for TPM at Field Step 1 – Initial Cleaning Step 2 – Counter measures against source of contamination & hard to do CLITA Step 3 – Prepare Standards - SOPs (719/SOP/14a) & based on ongoing learning CLITA Check sheet revised. Further to be ensure standardization and horizontal deployment of learnings, Training module was developed. Programs – 12 nos. Customer Care Managers (CCMs): 47, MAGIEC technicians : 66. 981 Sites across India are covered through this approach in F14, with a plan to increase to 8000 sites in F15. DTQMP reference page : 49 & 50

23 RESULT OF SERVICE EXCELLENCE THRU TPM
F14- TPM HORIZONTAL DEPLOYMENT RESULT OF SERVICE EXCELLENCE THRU TPM

24 F14 CaPS – Strengths and Weakness
Customers Response F14 Strengths/ Weakness % Promoters 66 Strength 1.Product quality, customer services are good. They have good engines. 2. Mahindra offers much better service, compared to other suppliers. 3.Supply is good and delivery is always on time. Weakness 1.Better servicing - Timely, Quicker, Proactive, etc. 2.Should improve after-sales services % Detractors % Passives 34 CaPS Score

25 F14 CaPS Action plan SN Weakness Action plan for F15 1
Better servicing - Timely, Quicker, Proactive, etc. Increased Coverage of TPM 2 Should improve after-sales service Started monitoring of DG Uptime for DG sets in District head quarters and state capitals.

26 Thank you


Download ppt "Powerol – Customer Care Telecom Service"

Similar presentations


Ads by Google