S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725.

Similar presentations


Presentation on theme: "S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725."— Presentation transcript:

1 S1725 BUILDING S1725, AREA MAP, MAP # 2

2 BUILDLING S1725, SITE MAP, MAP # 2 S1725

3 ROOM # 5 BUILDING S1725 SKETCH # 1 ROOM # 1 Room # 1A ROOM # 1B ROOM # 2 ROOM # 2A ROOM # 3ROOM # 4 ROOM # 6 ROOM # 6A ROOM # 7 ROOM # 7A ROOMC # 7B ROOM # 7C ABATE ASBESTOS TILE & MASTIC = WATER FOUNTAINS LOCATION (2EA) Residual asbestos containing mud on pipe fittings in room 6a

4 BUILDING S1725 WINDOW REPLACEMENT & HANDICAP RAMPS, SKETCH # 2 = Demo existing windows and install new windows with obscured glass = Demo existing windows and install new windows with non obscured glass ROOM #1 ROOM #3ROOM #4ROOM #5 ROOM #7 V HANDICAP RAMPS (5 EA) = Handicap Ramps

5 Shower Area BUILDING S1725 DOOR REPLACEMENT, SKETCH # 3 v v v v 1 2 3 4 5 6 7 8 9 10 ROOM # 1 ROOM # 3 ROOM # 4 ROOM # 5 ROOM # 7 = Door Replacement Locations (10 ea) = Emergency Light locations (9ea) Double Doors centered on windows above. = Lighted Box Lights DRESSSING ROOM # 2 MENS HEAD ( room # 2) WOMENS HEAD (room # 6) DRESSING ROOM # 1 Refinish int. plywood wall with Luan. Trim & paint. Room #7 install (1) 40 gallon electric water heater. Install new hot water lines from WH to shower valves in 7B. Insulate as specified in SOW.

6 New Urinals & Urinal Partitions New Toilet Partitions & TOILETS Re-Finish ceiling with specialized finish matching the specialized finish on the walls in room 1A ROOM #1 ROOM 1A ROOM #1B Re-Finish floor with specialized floor covering material BUILDING S1725, ROOM 1, 1A, &1B CEILING & WALL FINISH, TOILET PARTITIONS, URINAL SCREENS, SKETCH # 4

7 ROOM 2A ROOM 2 TOILETS & TOILET PARTITIONS URINAL & URINAL Partitions BUILDING S 1725, NEW LOCATION FOR FIXTURES IN ROOM 2A, SKETCH # 5 SINK, TOWEL & SOAP DISPENSOR RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH & REFINISH FLOORS

8 BABY CHANGING STATION BUILDING S1725, NEW LOCATION FOR FIXTURES IN ROOM 6A,, SKETCH # 6 RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH & REFINISH FLOORS SINKS,SOAP& TOWEL DISPENSERS

9 ROOM # 7 BUILDING S1725, LOCATION FOR NEW FIXTURES ROOM # 7 SKETCH # 7 RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH & REFINISH FLOORS RE-FINISH WALLS, & CEILINGS WITH SPECIALIZED FINISH

10 NEW ASPHALT PAVEMENT EXISTING PAVEMENT BUILDING S1725 NEW PAVEMENT, SKETCH # 8 Existing Trees Level, add topsoil and grade to (2) existing drains

11 ROOM # 5 BUILDING S1725, EXPANSION JOUNTS, SKETCH # 9 ROOM # 1 Room # 1A ROOM # 1B ROOM # 2 ROOM # 2A ROOM # 3ROOM # 4 ROOM # 6 ROOM # 6A ROOM # 7 ROOM # 7A ROOMC # 7B ROOM # 7C BLEACHER AREA = ALL EXPANSION JOINTS TO BE REPOINTED PAINT ALL PREVIOUSLY PAINTED STAIR TREADS = REPRESENTS EXPANSION JOINTS AT BASE OF ENTIRE REAR OF BUILDING Paint Stadium interior wall same as existing color Power and clean flooring in all rooms Bleacher area F Repair 4 cracks in concrete. 1 crack in aisle btwn E and F Bleacher area E Repair 1 crack in concrete E F C D Bleacher Area D Repair 2 cracks in concrete Bleacher area C Repair 2 cracks in concrete. 1 crack in aisle btwn C and D Bleacher Area A Repair 3 cracks in concrete Bleacher Area B Repair 5 cracks in concrete B A

12 BUILDING S1725, PAINT GUARDRAIL, SKETCH # 10

13 BUILDING S1725 DOOR LOCKS, SKETCH # 11