2 SASSO FIELD New Turf Field Installed

3 Sasso Field Painted buildings & new tent

4 Sasso Field Lightning Detector

5 SASSO FIELD New cameras Installed Sealed blacktop under bleachers

6 High School A-gym Floor Refinished

7 FAIR LAWN HIGH SCHOOL B-WING CAFETERIA ROOF

8 HIGH SCHOOL Abated 3 classrooms (Rms B120, B122, B204) Painted 5 classrooms Retiled A-wing girls bathroom HS Stage Lighting HS Lighting (pending) Auditorium underground conduit, carpeted aisles

9 Memorial – Completed installation of windows on west side of building

10 Memorial School Painted lockers on 1 st and 2 nd floor

11 MEMORIAL SCHOOL – Trimmed trees back from field

12 Memorial School Trimmed trees back from steps

13 MEMORIAL SCHOOL Installed new energy efficient LED lights in auditorium Rm 214 – converted from storeroom to classroom instruction Auditorium – rebuilt exhaust fan Repaired terrazzo floor outside main office

14 THOMAS JEFFERSON SCHOOL Repaved & striped front lot Widened exit driveway to allow right & left turns upon exiting

15 THOMAS JEFFERSON SCHOOL Painted lockers and installed new lockers on 1st floor Carpeted 5 offices in Child Study Team room Boys locker bathroom and boys room by Rm 119 – installed new floor drains & waterless urinals Installed wireless clock system Rm 116 – abated floor and installed VCT tile

16 EDISON SCHOOL Moved sign from HS and installed at Edison

17 EDISON SCHOOL Paving of front lot and re-striping for bus access (pending) Repaired windows

18 FORREST SCHOOL Installed VCT tile in 4 classrooms Moved KECO from Forrest to Edison School

19 Lyncrest School Canopy, Ceiling & LED lights

20 MILNES SCHOOL Refurbished 2 storm drains in rear parking lot and repaved.

21 INSTALLED CHAIRLIFT AT MILNES SCHOOL

22 Radburn School Kindergarten Windows Installed new energy efficient thermopane windows

23 RADBURN SCHOOL Converted music room to new kindergarten room on ground floor Installed new security gate on ground floor by new addition lobby Ground floor boys room in stairwell – installed new floor drains and waterless urinals

24 Warren Point School Installed new digital sign on Broadway

25 Warren Point School Milled and repaved teacher parking lot and installed new security gates

26 Warren Point School Installed 100 cubic yards of mulch on playground

27 Warren Point School Installed new Fire Doors in old wing-1 st floor

28 Westmoreland School Installed energy efficient thermopane windows in gym

29 WESTMORELAND SCHOOL Replacement of bathroom partitions (pending)

30 DISTRICT Installed security locks in all school buildings Room numbers stenciled on exterior windows in all school buildings Purchased maintenance truck Purchase of leaf vacuum (pending) Purchase of salt spreader (pending)