1 SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Rick Faircloth Cameron

2 SC-6 TG1 Status Report 6DSS 3rd Ed. Subsea pipeline valves
6DSSX 1st Ed. Actuator Sizing for Subsea pipeline valves 6FA 3rd Ed - Fire Test Valves 6FB 3rd Ed.- Fire Test End Connections 6FD 1st Ed.- Fire Test Check Valves

3 6DSS 3rd Ed. Subsea pipeline valves
TG held 3 meetings since last report June in US and 1 in Italy About 20 active TG members Completing annex’s on Hyperbaric qualification and design qualification Plan 1 additional TG meeting before next SC6 meeting in June 2016 Plan to go out for ballot and publish by end 2016

4 6DSSX 1st Ed. Actuator Sizing for Subsea pipeline valves
TG held 4 meetings since last report June in US and 1 in Italy About 20 active TG members Currently working on Section 5 on Design. To date, 46 design related topics identified for technical content. Approximately 1/4 of these have been written.

5 6DSSX 1st Ed. Actuator Sizing for Subsea pipeline valves
5 meetings to be held in in Europe and 2 in US. Dates TBA. At current progress, anticipated date for first ballot is Q

6 Fire Type Testing standards
6FA 3rd Ed – R2011 Sept. Fire Test Valves- Scheduled for possible review or reaffirm in 2016. 6FB 3rd Ed.- R2011 Sept. Fire Test End Connections- Scheduled for possible review or reaffirm in 2016. 6FD 1st Ed.- R2013 Sept. Fire Test Check Valves- Scheduled for possible review or reaffirm in 2018.

7 Fire Type Testing standards-continue
6FA 3rd Ed – R2011 Sept. Fire Test Valves & 6FD 1st Ed.- R2013 Sept. Fire Test Check Valves- to start a new TG and review both document and consider parts of API th Ed. that may be included in next issue of 6FA and 6FD. TG will issue a SR3 for 6FA and 6FD to SC6 to have the documents ready fro ballot by June 2017 with final publication by End 2017.

8 Fire Type Testing standards-continue
6FB 3rd Ed.- R2011 Sept. Fire Test End Connections- reaffirm in Will request secretary to send out a request to all SC6 members if any one want to work on revising the document or just reaffirm.