Calendar Item No. 104 California State Lands Commission Adjourned to August 20, 2012 Central Coastal California Seismic Imaging Project R/V Marcus G. Langseth.

Slides:



Advertisements
Similar presentations
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Advertisements

Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
1 Central Coastal California Seismic Imaging Project California Energy Commission Workshop Dr. Stuart Nishenko PG&E April 27, 2015.
ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005.
Planning & Community Development Department Municipal Code Amendments: Adoption/Certification Authority of California Environmental Quality Act Reviews,
1 State Water Resources Control Board Environmental Review for State Bond Funded Grant Projects Presented by Lisa Lee, Environmental Review Unit.
MANAGEMENT BOARD 1 Working Safely While Protecting the Environment – Role of the ESRF Paul Barnes, ESRF Management Board Chairperson U.S. – Canada Northern.
1 Lead Emissions from Piston-Engine Powered Aircraft: EPA Activities & Next Steps For National Tribal Forum on Air Quality Meredith Pedde May 21, 2015.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Douglas P. Carstens Chatten-Brown & Carstens LLP, Hermosa Beach L EGAL A SPECTS OF C LIMATE C HANGE & U SING CEQA TO S UPPORT B ETTER P ROJECTS.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
Agricultural Preserves Program Uniform Rules Update Office of Long Range Planning Board of Supervisors Hearing September 25, 2007.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Butterfly Village (PLN080209) Monterey County RMA- Planning Director July 30, 2008.
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Protecting Special Places California & Hawaii Chapter Conference: September
Planning and Community Development General Plan EIR: Preliminary Alternatives City Council February 10, 2014.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
Greenhouse Gas CEQA Significance Threshold Stakeholder Working Group April 30, 2008 SCAQMD Diamond Bar, California.
August 30, 2011 Board of County Commissioners. Background Physical Description Small cylindrical beige to grayish nearly legless lizard Adults 4 to 5.
Alternative Ballast Water Exchange Areas Workshop June 20-22, 2006 Seattle, Washington Maurya B Falkner California State Lands Commission Marine Facilities.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Planning & Community Development Department Conditional Use Permit #5029 and Other Land Use Entitlements: Final Environmental Impact Report and Statement.
Revised PRC 421 Recommissioning Project on State Oil and Gas Lease No. PRC California State Lands Commission December 17, 2014.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
1 Findings and Board Resolution Steven Blum. 2 CEQA Findings in the Board Resolution  Resolution or separate appended document contains findings critical.
City of Solana Beach Local Coastal Program Land Use Plan Amendment CCC Item Th7d January 9, 2014.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
Pacific Gas and Electric Company Scientific Collecting Permit Presentation to the Fish and Game Commission September 24, 2012 Brian Owens, Marine Region.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Offshore Central Coastal California Seismic Imaging Project April 4, 2012 Central Coastal California Seismic Imaging Program September 10, 2012.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
Implementation of National Ambient Air Quality Standards Bill Harnett NACAA Fall Meeting September 22, 2009.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
California State Lands Commission February 20, 2015.
City Council Meeting October 15, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of Element.
Small Town Service ~ Community Stewardship ~ Future Focus ALBRIGHT OFFICE PARK Planned Development PD Architecture and Site S Environmental.
Joint Public Hearing - Closed Redevelopment Agency & City Council Amended and Restated Redevelopment Plan for the North Stockton Redevelopment Project.
Planning Commission Meeting July 30, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of.
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Parks and Recreation Commission
Facebook Campus Expansion Project EIR
City of Los Angeles Department of Public Works Bureau of Engineering
NORTH TRUNK SEWER REPLACEMENT PROJECT
Planning Commission Hearing
NORTH TRUNK SEWER REPLACEMENT PROJECT
Overview What is the CEQA environmental review process?
Fifth Standard Solar Project Complex
City of Los Angeles Department of Public Works Bureau of Engineering
Modify Approval of Conditional Use Permit #6222 and Mitigated Negative Declaration for the Arroyo Seco Canyon Project PUBLIC HEARING City Council July.
SEASP Draft Environmental Impact Report
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
General Plan Amendment & Zone Change Timeline
Brackish Water Desalination Project Draft EIR
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Calendar Item No. 104 California State Lands Commission Adjourned to August 20, 2012 Central Coastal California Seismic Imaging Project R/V Marcus G. Langseth

2 DCPP PG&E Project Objectives State waters (3 nm limit) Zone 3: Hosgri fault zone Zone 4: Hosgri & Los Osos fault zones Zone 2: Hosgri fault zone & Shoreline, Hosgri, and Los Osos fault intersections Zone 1: Hosgri and Shoreline faults (includes southern extent of Shoreline fault) Obtain Deep, High Resolution, Seismic Imaging of Faults (proposed survey footprint in yellow) White Rock- Cambria & Point Buchon MPAs

3 Project Environmental Impact Report (EIR) Identifies Significant & Unavoidable Impacts ImpactEIR Section Air Emissions due (Air Quality & to Survey Vessels Greenhouse Gases) Noise Impacts to (Biological Marine Mammals Resources – Marine) Marine Protected Areas(Land Use) Commercial & (Land Use & Recreational FishingCommercial Fishing) Impacts remain Significant and Unavoidable after mitigation.

4 # I No Project Alternative CSLC does not approve Project. IIbPhased Survey PG&E conducts part of survey in first year, followed by a delay of some months to a year before conducting second part of the survey. IIIb Three-Loop Configuration * Eliminates northern zone near MBNMS and two MPAs (Zone 3). IIIc Two-Loop Configuration PG&E’s original survey consisting of two “racetracks” (replaced with proposed four-loop Project in January 2012). * Environmentally Superior Alternative in EIR EIR Identifies & Analyzes Alternatives

5 Proposed Project Versus Other Options Proposed Project Years2012 Start date~10/1 End date12/31 # Zones/ MPAs 4 / 3 # days of air guns 41 Total days 82 Pro- posed IIIb Years2012 Start date~10/1 End date12/31 # Zones/ MPAs 4 / 33 / 1 # days of air guns 4134 Total days 8268 IIIb Modified Timing, 3-Loop Years / 2013 * Start date ~10/1 10/15 Air gun start11/1 End date12/31 # Zones/MPAs3 / 1 # days of air guns 34 *2012Mobilization can begin October 15. Air gun window: November 1 – December 31. Survey ends on or before December If PG&E cannot survey all target faults in 2012 (due to weather, equipment problems, presence of marine mammals, etc.), survey may continue in 2013, as described above.

6 Commission Options (EIR certified on August 14) This concludes the staff presentation. 1) Adopt Mitigation Monitoring Program (Exhibit D). 2) Adopt CEQA Findings & Statement of Overriding Considerations for: Alternative IIIb, Three-Loop Configuration (Environmentally Superior Alternative); OR 3) Approve the Geophysical Survey Permit. Modified Timing Three-Loop Configuration