The Plaza at Santa Monica Project PUBLIC SCOPING MEETING

Similar presentations


Presentation on theme: "The Plaza at Santa Monica Project PUBLIC SCOPING MEETING"— Presentation transcript:

1 The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
City of Santa Monica Ecotierra Consulting January 30, 2017

2 Project Review Process
Community Workshops Vision (Mar 2011) Council Study Session (May 2011) Community Workshop Alternatives (Jan 2012) Community Meeting (Sept 2014) (June 2015) PC Float Up Council Float Up (Oct 2015) Scoping Meeting EIR EIR Preparation (approx. 1 year) PC Hearing City Council Hearing

3 Purpose of scoping meeting
Beginning of the CEQA review process Inform the public of the proposed project Provide an overview of the environmental review process Identify environmental issues for analysis in the EIR Receive public comments regarding environmental topics, issue of concern, and alternatives to be evaluated

4 Project location

5 Project site photos 4th Street View of Site Arizona View of Site

6 Conceptual Site Plan

7 Rendering southeast view
Arizona Avenue 4th Street

8 Aerial view

9 Elevations Arizona Avenue 4th Street 5th Street

10 Project components Use Detail Max. Square Footage Public Open Space
Grand Plaza, 5th and Arizona Plaza, Pocket Parks, Second Level Park 41,557 sf Retail/Restaurant Neighborhood serving and regional retail/restaurant 42,200 sf Cultural Uses A large area of the ground floor will be made available at below market rent for cultural uses. 12,000 sf Bicycle Center Bicycle center will include lockers and showers. 1,700 sf Workspace Creative workspace 106,800 sf Affordable Housing 48 units (4 3-bedroom units, 8 2-bedroom units, 20 1-bedroom units, 16 studios) plus residential circulation and ground floor lobbies. 40,300 sf Hotel 280 Rooms 154,000 sf Total Commercial Uses (not including public open space) 357,000 sf 1

11 California Environmental Quality Act (CEQA)
Purpose: to inform decision-makers and the public of a project’s potential physical effects on the environment Applies to discretionary projects Increases public understanding of and participation in environmental review process Discloses potential impacts on the environment Identifies ways to avoid or reduce potential significant impacts through feasible mitigation measures or alternatives

12 CEQA EIR is an informational document that represents “good faith” effort to disclose projects’ potential environmental impacts and identify ways to lessen such impacts CEQA does not deny or approve a project

13 Overview of CEQA Process
Notice of Preparation (NOP) Extended public comment period (January 15, 2017 through February 16, 2017) January 30, 2017 Scoping Meeting Prepare & Publish Draft EIR 45-day public review Prepare & Publish Final EIR Response to comments on Draft EIR Corrections or additions to Draft EIR Planning Commission and Council Consider Final EIR and Project Council Certifies EIR If significant impacts, Council must make Findings, adopt a mitigation monitoring program, and adopt Statement of Overriding Considerations

14 The CEQA EIR Process Prepare/Distribute Notice of Preparation
(30-day review period) Prepare Final EIR Including Response to Comments Public Scoping Meeting Review of Responses by Commenting Agencies We are here Prepare Draft EIR Planning Commission Hearing Prepare Public Notice of Draft EIR Availability File Notice of Determination Public and Agency Review of Draft EIR (45 days) = Opportunities for Public Input

15 Scoping Meeting Purposes
Inform the community and concerned agencies about the project and the EIR Solicit input regarding the EIR scope Inform the community about process and future opportunities for input

16 Preliminary EIR scope: Potential Environmental topics For Analysis
Aesthetics (including Shadows) Neighborhood Effects Noise Air Quality Population/Housing Cultural Resources Public Services (Fire/Police/Parks/Libraries) Construction Effects Geology/Soils Transportation/Circulation Greenhouse Gas Emissions Utilities (Water/Sewer/Solid Waste/Energy) Hazards and Hazardous Materials Mandatory Findings of Significance Land Use and Planning

17 Contents of Draft EIR Description of the Projects
Existing Environmental and Regulatory Setting (baseline) Analysis of Projects Impacts on the Environment Based on CEQA Guidelines and Thresholds and substantial evidence in the record Includes analysis of cumulative impacts Feasible Mitigation Measures, as necessary Analysis of Reasonable Range of Alternatives

18 Opportunities for Public Comment
Public Comments on Scope, Focus, Content of EIR Provide comments at tonight’s meeting Form for written comments provided Turn in to staff Mail/drop off to City Hall comments Comments will be reviewed by EIR consultant and City to ensure that environmental issues/concerns are addressed in the EIR

19 Please direct your comments to:
Contact Information Please direct your comments to: Rachel Kwok City Planning Division City of Santa Monica 1685 Main Street, Room 212 Santa Monica, California 90401

20 Open House/Public Comments
Please go to open house stations Provide public comments