News from DESY. Joachim Mnich Plenary ECFA CERN, November 2011.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Schedule Remove ARGUS experiment - Fall 2009 Disassemble and ship OLYMPUS detector - Spring 2010 Ship target and beamline – Fall 2010 Modify DORIS beam-line.
Status at DORIS Hall New fixed cable channel on the floor for cables from outside to electronics hut Firedetection and network connections rerouted to.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Richard Milner April 22, Internal Target Experiment at DORIS Proposal of a new experiment at DORIS using the available MIT-BLAST detector and.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
OLYMPUS U.Schneekloth/R.Beck PRC closed session
DESY PRC May 10, Status of OLYMPUS -Project DESY PRC MAY 5, 2009 OLYMPUS-Proposal conditionally approved by PRC October 2008: 1.) details of the.
DESY. Status and Future Developments Albrecht Wagner Plenary ECFA 28 November 2008 CERN.
1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
DESY Participation in an External Experiment Joachim Mnich PRC Meeting
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
Short Range Correlation in 4 He E07 – 006 Update report presented to the Hall A User group meeting the Hall A User group meeting Igor Korover Tel Aviv.
Astroparticle Physics at DESY IceCube CTA Recommendations.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Status of the Project April EPOG, 12th Outreach-Meeting, CERN, Petra Folkerts, DESY 1 Report from DESY, Hamburg, Germany The Status of TESLA and.
ECFA Chairman’s report T. Nakada EPFL. New members Romanian members ratification on by the ECFA members – R/PECFA member: Dr. Calin ALEXA,
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
ECFA European Committee for Future Accelerators Report from the chairman M. Krammer HEPHY, Vienna, Austria July 24, 2014RECFA DESY1.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
COMPASS FRC – November 29, COMPASS FRC Novembre 29, 2013 COMPASS – phase II MoU Technical Coordinator Preparations for 2014 run Publications.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Particle Physics in Germany activities and perspectives Bernhard Spaan - TU Dortmund Chair of Komitee für Elementarteilchenphysik (KET) technische universität.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Hall C Users Meeting SHMS Structure Installation A pictorial review Mike Fowler Hall C Engineering 21 Feb 2014 M. Fowler Hall C Users Group, 2014.
Large Hadron Collider BY: DARSHAN MISTRY, ALEX GUMBRELL, CHRISTINE AUCIELLO, PATRICK DUNGOG.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
Report on ECFA Gerard van der Steenhoven Based on plenary ECFA meeting of 26 Nov. CERN Issues: – Business as usual (chair, CERN, DESY) – ESGARD.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
KIT – Universität des Landes Baden-Württemberg und nationales Forschungszentrum in der Helmholtz-Gemeinschaft Detector Technology and Systems.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
ELENA installation progress F. Butin / ELENA collaboration.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
KEK news ( ) S.Tanaka.
LHC schedule.
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
LLRF systems status update
ICEC/IMC 2016 Sergiy Putselyk DESY MKS
SCHEDULE Nov 1st - Assembly Table Complete
News and brief overview of Beamline plans for the next few months
XFEL Vacuum System Commissioning
NA61 news and plans News from other labs/experiments
10/month is the present production rate 2 FTE + sporadic contributions
Report on EUCARD WP6: MICE Transnational Access (TA)
News from DESY. Joachim Mnich KET Jahresversammlung Bad Honnef
WP Coordinaten XFEL RF Operation
Status of CO2 Cooling tests at CERN for Pixel phase 1
Presentation transcript:

News from DESY. Joachim Mnich Plenary ECFA CERN, November 2011

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 2 Status European XFEL >Good progress >Civil engineering  Injector building  Accelerator tunnel >Fully assembled SRF prototype module at DESY

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 3 Status Tunneling

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 4 Completion of Accelerator Tunnel

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 5 Injector Building

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 6 Injector Building

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 7 Module Production >1st XFEL module fully assembled at CEA-Saclay >Arrived at DESY on October 28 >Installed on cryo module test bench AMTF hall at DESY >Helium transfer line sections arrived from Poland (Wroclaw)

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 8 OLYMPUS Experiment at DORIS >Measurement of elastic cross section ratio e + p vs e - p >Use BLAST detector (MIT) Schedule: >2010 set-up experiment at DESY >2011 commissioning >2012 data taking (3 months)

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 9 >Detector rolled into beam position in July former place of ARGUS >Almost all detector components installed and operational Status OLYMPUS Assembled detector in park position Detector during roll-in

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 10 OLYMPUS Commissioning >Target system OLYMPUS data taking runs >Jan. – Feb st run >Oct. – Dec nd run DORIS will be shut down end of 2012 >Wire chambers

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 11 BELLE II >DESY joined BELLE II at SuperKEKB >Strong German consortium to build the vertex detector in DEPFET technology  Bonn, DESY, Gießen, Göttingen, Heidelberg, Karlsruhe and Munich (MPI, LMU and TU) >DESY will contribute to integration issues  Mechanics, cooling, beam pipe …

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 12 Helmholtz Association >Restructuring of research area for next funding period (2015 ff) Structure of Matter 4 programmes:  Particle Physics  Astroparticle Physics  Hadron and Nuclei  Photon, Nuclei, Ions Matter 3 programmes:  Matter and Universe  From Matter to Materials and Life  Matter and Technology (Accelerator, Detector, Computing) new Portfolio topics accelerator, detector and computing approved

Joachim Mnich | DESY | Plenary ECFA 2011, CERN | November 24, 2011 | Page 13 Helmholtz Alliance „Physics at the Terascale“ >Network of complementary excellence between  2 Helmholtz centres  18 German universities and  1 Max Planck-Institute >Project duration: 2007 – 2012  Funding approx. 5 M€/year >Future funding of the project still uncertain