Presentation is loading. Please wait.

Presentation is loading. Please wait.

News from DESY. Joachim Mnich KET Jahresversammlung Bad Honnef

Similar presentations


Presentation on theme: "News from DESY. Joachim Mnich KET Jahresversammlung Bad Honnef"— Presentation transcript:

1 News from DESY. Joachim Mnich KET Jahresversammlung Bad Honnef
November 23, 2013

2 Status European XFEL Experimental Hall Injector complex on DESY site

3 Accelerator

4 Industrial Cavity Production
As of Num. of cavities: vendor 1 23 vendor 2 56 Close to ILC specs 2nd pass: additional high-pressure rinse Maximum gradient usable gradient: X-ray limited (dark current) LCWS13 Mike Harrison

5 RF Coupler Critical issue for schedule Main problem RF couplers
Delivery rate of 8 per week not yet reached Still problems with copper plating quality Critical issue for schedule

6 FLASH II and PETRA III PETRA III extension: FLASH II:
Civil engineering finished User operation in 2015 PETRA III extension: Civil engineering in 2014 No PETRA III operation in 2014 Impact on DESY Testbeam (see below)

7 DESY Particle Physics New funding proposal to Helmholtz (DESY+KIT) submitted November 1st evaluation February 2014 Common proposal with astro-particle and hadron & nuclei with other Helmholtz centres Application for base budget Investment proposals: LHC upgrades and German Tier-1/2 computing in preparation

8 DESY Particle Physics 2015-19
HERA Theory LHC ILC LHC (ATLAS & CMS) e+e‒ physics: (Belle & ILC) Theory

9 Helmholtz Large Investment Proposals
DESY: 20 M€ ATLAS + CMS GSI: 4.2 M€ ALICE KIT: 3.8 M€ CMS KIT: M€ Tier-1 DESY: 13.2 M€ Tier-2 GSI: M€ Tier-2 (ALICE) (invest for 5 years)

10 Laboratory for Large Detectors
Geb. 25c + extention1 DESY will provide the infrastructure for the detector construction & commissioning: reuse Geb. 25c (annex to DORIS hall) plus extension

11 Belle Backup copy of full Belle data set at DESY
about 1000 fb-1 collected between and 2010

12 DESY Testbeam High demand in 2013 for detector R&D
SPS shutdown at CERN 2013/14 Used by many projects >300 users in 2013 2014: due to PETRA shutdown dedicated resources required to operate DESY III and pre-accelerators Only 2 months scheduled (Jan/Feb 2014) booked out already Service weeks

13 Alliance: Schools & Workshops (since 08/2012)
“Prejudice meets reality” – 08/12 (Bonn) “Advanced programming concepts” – 10/12 Proton structure in the LHC era – 10/12 Introduction to the Terascale – 02/13 Fast detector simulation in HEP – 03/13 Introductory statistics school – 03/13 MCNet+Alliance MC School – 08/13 LC Physics School – 10/12 C /13 MC methods in statistics / data analysis – 11/13 (MPI) Fast MC in HEP – 01/14 MC School - 03/14 Introduction to the Terascale – 03/14 Statistics, PDFs – probably 04/14 Annual meeting – 12/12 MC methods in natural sciences, engineering, finance… - 02/13 Detector Workshop – 02/13 GPU workshop – 04/13 SUSY workshop – 05/13 Event generators and resummation (Durham, series initiated by Z. Nagy) – 07/13 Anomalous Quartic Gauge couplings – 09/13 (Dresden) LC Forum – 10/13 GPU workshop in Italy – series based on our first event – 04/14 PDF Benchmarking WS – 04/13 (?) Event generators and resumation – 06/13 (Münster) …. Plus: Sponsorship of conferences (Top2013, QCD Tools WS at FNAL, …) 10 Theorists of the Month in (Maltoni, Porod, Hautmann, Nason, Frixione, Papucci, Cacciari, Stewart, Krämer, Glover) Analysis Centre seminars ….

14 Application deadline for 2014:
January 31, 2014


Download ppt "News from DESY. Joachim Mnich KET Jahresversammlung Bad Honnef"

Similar presentations


Ads by Google