1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring - Conventional Facilities Interfaces Erik Johnson, Accelerator Systems Interface Manager Accelerator Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Operations Erik D. Johnson, Deputy ALD for Programs NSLS-II Project Advisory Committee February 8-9, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Laboratory Office Building (LOB) Design Ove Dyling Assistant Director for Design Management CFAC Review November 9 – 10,
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Title II Design Status Ove Dyling Assistant Director for Design Conventional Facilities NSLS-II Conventional.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
1 BROOKHAVEN SCIENCE ASSOCIATES Installation & Integrated Testing Status & Plans Gregory Fries, ASD Project Engineer 9 th ASAC meeting for NSLS-II Project.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Director’s Review of August 2-3, 2007 CLASSE ERL Conventional Facilities Donald Bilderback Cornell High Energy Synchrotron Source, School of.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
K.Gadow CALICE technical review 1 Move to FNL ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3/B4.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Beamline Conceptual Design Overview and Interface Management
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Installation Gregory Fries, Project Engineer 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Getting the NSLS-II Accelerator ‘on-line’ Erik Johnson, Steve Hoey, Ferdinand Willeke NSLS-II PAC Meeting December 10-11,
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
CBETA Technical Review
IT-4189 Supply and installation of a cryogenic distribution system
FCC-ee MDI Civil Engineering update
Maintenance at ALBA facility: Strategy for the conventional services
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall - Hutches
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Interface Management Overview Implemented Changes Coordination with Technical Divisions Changes under Consideration Conclusion

3 BROOKHAVEN SCIENCE ASSOCIATES Interface Management Overview Accelerator Group – Erik Johnson (Interface Manager) Experimental Group – Andy Broadbent (Interface Manager) Interface Mgr activities: Formal Weekly meetings Additional meetings as required to resolve issues including Beneficial Occupancy planning Coordination meetings with Ring Building General Contractor Use of Navisworks to coordinate in real time Navisworks purchased by the Accelerator Group Interface Mtg Minutes Documented on Share Point

4 BROOKHAVEN SCIENCE ASSOCIATES Implemented Changes Changes Implemented for Accelerator Group Beneficial Occupancy Coordination –Revised how magnets will be entering the Ring Tunnel RF Area Design Maturity –Revised roll-up door due to cryogenic equipment sizes –Revised RF Test Room Radiation Shielding Door Ring Tunnel Design Maturity –Revised Gaseous Nitrogen to Compressed Air -Increased size of Cooling Tower Building Injection Building Design Maturity – will discuss later Changes Implemented for Experimental Group –100 Meter Long Beam Line (Hard X-ray Nanoprobe Satellite Building) -Vibration Analysis -Integrated into both the Ring Building and LOB 3

5 BROOKHAVEN SCIENCE ASSOCIATES Beneficial Occupancy Coordination Temporary Entry Door Forklift area Common Access Corridor Enlarged Opening

6 BROOKHAVEN SCIENCE ASSOCIATES RF Area Design Maturity Revised door height from 10’-0” to 14’-0” Revised Radiation Shielding Door design in RF Test Area

7 BROOKHAVEN SCIENCE ASSOCIATES Implemented Changes - MEP Labyrinth Coordination Ductwork, Sprinkler Piping, and Electrical conduits coordinated with Secondary DI water supply and return Revised concrete penetration in Labyrinth wall Injection Building Coordination Design Maturity of the Booster, Transport Line and Linac Revised sizing and location of the power supply. Revised layout of the Electrical Systems Coordination of ductwork layout Located Secondary DI water locations Revised concrete penetrations

8 BROOKHAVEN SCIENCE ASSOCIATES Injection Building Plan

9 BROOKHAVEN SCIENCE ASSOCIATES Injection Building Section

10 BROOKHAVEN SCIENCE ASSOCIATES Coordination with Technical Divisions Coordination Processes Shop Drawing Review Radiation Shielding Doors RF Test Area Shielding Blocks Location of Liquid and Gaseous Nitrogen drops Integrated Power Cabinet (PAC) design and locations Regular Field Tours/Inspection of On-going Construction Unistrut locations in Booster Tunnel Design documents indicated smooth arc Construction methods resulting in 4’-6” segments Penetration omission in Booster Tunnel Discovered mid August Issued ECN 126 August 30, 2010

11 BROOKHAVEN SCIENCE ASSOCIATES Changes under Consideration Beneficial Occupancy Planning: Timing of Epoxy costing of experimental floor Meetings conducted presently to identify optimal timing Accelerator System Scope: Considering scope transfer for CF oversight of: Experimental Electrical Cable Tray Lead Shielding in Ratchet Wall opening Secondary DI water system inside Service Buildings & SR Tunnel Experimental Systems : Additional Beam Lines during construction Utility hook up to Hutches

12 BROOKHAVEN SCIENCE ASSOCIATES Conclusions Technical Divisions and Conventional Facilities are confident that most changes have been discovered and incorporated into the design Planning for smooth integration of installation of Scientific equipment while construction is ongoing Technical Divisions and Conventional Facilities are well coordinated and are fully engaged in Conventional Facility Construction Progress