Health and Safety Coordination at CERN Environmental Health and Safety managing risks today for a safer tomorrow John Robert Etheridge, Emmanuel Paulat,

Slides:



Advertisements
Similar presentations
Risk Assessment. Objectives By the end of this presentation you will know: What risk assessment is; Where the need for risk assessment comes from; and.
Advertisements

Managing the Health and Safety of Contractors
Determining the True Root Cause(s) of Accidents and Safety Incidents Incident Investigation and Analysis.
Occupational Health and Safety Part 2 - Committees, Worker’s Rights, Worker’s Compensation.
Appoint a CDM – Coordinator if is notifiable. What is notifiable Prevent work starting if if no coordinator and council not notified. Retain a health and.
Health and safety at work
Workplace Safety and Health Program
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
State and Local. 3 Levels of government in ensuring food safety FSANZ development of food safety standards. DHS: Implementing and enforcing food legislation.
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
Presentation for health and safety coordination CERN Safety Coordination Mission and Role M. Arnaud, C. Bedel, J. Etheridge, E. Paulat.
1 CS38010 Professional Issues Health and Safety at Work.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Process Safety Management
JOB HAZARD ANALYSIS Example Guide.
Safe Working Practices - Contents
Management of Health And Safety.
Company’s short presentation. General presentation We offer a complete package of professional Occupational Health and Safety services; We hold the certification.
17 July 2002RSOC presentation G.D. 1 NEW SAFETY CODE A9 Origin –Revision of SAPOCO 42 document Main modifications: –Official name becomes SAFETY POLICY.
Occupational Health & Safety
Occupational Health and Safety
THE NATIONAL SITUATION ON THE HEALTHAND THE SAFETY AT WORK in Poland prepared by: Małgorzata Żydło Danmar Computers.
EuropeAid/131555/C/SER/RS Major Accident Prevention Policy Safety Management System Ernst SIMON, Styrian Regional Government, Austria Belgrade, December.
Standards and Standardization. Standard Levels Standards preside according to the level. Their effect, image and their scope of work change from one level.
Basics of OHSAS Occupational Health & Safety Management System
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Company duties under the ISM Code
Presentation 4: How can I know if nanomaterials are used in my workplace?
Health and Safety Policy
John Robert Etheridge, TS/HDO, Health and Safety Coordinator for the installation of the LHC and its Experiments Enviromental Health and Safety – managing.
Safety Stand Down – Together We Will Make the Difference.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000.
CERN Safety Coordination How it functions. CERN Safety: Who is Responsible?  Everyone present on CERN’s site, i.e. staff, members, and contractors alike.
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
EN/ACE/COS/EROS Engineering Referent for Operation Safety Cyrille Bedel, Yannick Beraud, Michel Bonnet, John Etheridge Emmanuel Paulat.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
6Standards for the planning, design and construction of ports and terminals OBJECTIVE: To ensure that Ports and Terminals are planned, designed and constructed.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
International Technical Safety Forum CERN, Geneva, Switzerland, April 12-16, 2010 CERN Safety Coordination How it functions M. Arnaud, C. Bedel, J. Etheridge,
Standards for Technical Educators Occupational Safety & Health.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Safety Management Standards. Introduction Health and Safety Procedures (which identify the risks, hazards and ways of mitigating these) are weak in that.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Lone Working – Good Practice Marie Foster Early Years Safeguarding Officer.
Health & Safety Management “and a few other things for your consideration”
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
National Food Control Systems
20 Principles for Managing Behavioural Safety & Process Safety
Health and Safety Policy
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
EP Experiments safety validation process Safety Permits
Temporary Works Co-ordination
People Responsible For Health and Safety
Regional Seminar for OIE National Focal Points on Animal Production Food Safety Importance of collaboration between the Veterinary Services and industry.
Regulatory Infrastructure and Transport Safety Section
How to conduct Effective Stage-1 Audit
12 Safe Maintenance Rules
How To be Safe On Stage ?. Introduction Safety in the theater means that the crews, cast and the audiences are kept safe from all possible hazards. Learning.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Health and Safety Coordination at CERN Environmental Health and Safety managing risks today for a safer tomorrow John Robert Etheridge, Emmanuel Paulat, Michel Arnaud

Health and Safety Coordinator. What's their job? Ensure that safety is integrated throughout the project. Evaluate the risks, in particular those resulting from co-activity and successive activities. Ensure that the general principles of prevention are implemented and the rules and regulations are enforced.

Professionals Check List Document describing the work that has to be carried out Has it been issued and approved by all those concerned including the safety coordinator. Have you got written confirmation that all the equipment has been inspected and accepted Have we agreed a date for the Joint Inspection so that you can start work. As the person in charge have you got or been given the means you need to ensure that the written procedures are respected If your not sure or you have a doubt ask

Why Must we do all this? Safety Coordination: Legal basis European Directive EEC 92/57 French Law L’ordonnancé fédérale du 29 th June 2005 Laws and Regulations of the host Countries CERN Safety Codes, Instructions, Notes and Bulletins

Health and Safety Documentation based upon the rules and regulations in vigour  Specific Method statements for the intervention to be carried out. (PPSPS, Fiche de Tache, Job Description) Drawn up by the work package contractors, CERN group, collaborators, or who ever will carry out work in the machine, 3 weeks before the start of work. Verified and approved by the safety coordinator.  Joint Inspections Carried out by the safety coordinator as close to start date as possible, with the work package contractors, CERN group, collaborators, or who ever will carry out work in the machine.  Register Journal Opened at the conception stage a form of log book of information that must be kept for a period of five years.

AFTER THOUGHT Avoiding the AFTER THOUGHT Syndrome For any project to retain integrity Environmental Health and Safety considerations have to be inbuilt from the design stage In reality, even in prestigious blue chip projects Environmental Health and Safety is often an after thought. It is critical that Environmental Health and Safety considerations are built in for the lifecycle of any project.

General principles of prevention Avoid the risks Asses the unavoidable risks Tackle risks at the source Adapt working conditions to the worker Keep up to date with technical development Replace dangerous items by safe ones or less dangerous ones Plan preventive measures as part of a whole preventive approach Give priority to collective protective measures over individual ones Provide clear instructions for the operators in their mother tongue

The documentation covers the following points Special situations… Risks for the worker Tests Urgent and Emergency Interventions Work in general including maintenance Procedure versus No Procedure

Special Situations There are none! All work, tests, interventions, must be –planned, –prepared, –authorized and –all documentation respected. Lack of rigour and discipline could result in incident and accident at the worst, but could also cost us time and money.

examples Without  the Environmental Health and Safety systems  training,  procedures,  maintenance devastation can follow

goals 1.Attain a satisfactory safety situation for all 2.Avoid accidents and professional illnesses

Conclusion We are here to help by –dealing with risks –adapting working conditions –planning preventive measures We are here to work with you. Not against you. We will do our best to help you find solution that are adapted to your needs. We can provide you with information regarding the interface between all work site, the LHC and the experimental caverns.