Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.

Slides:



Advertisements
Similar presentations
LCW Upgrades Update Booster Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were.
Advertisements

19 Jun 031 Lamberston Removal and F0 Straight Section Vacuum Upgrade Mike McGee FNAL.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
Hollow Cathode Light Source at MSU Aaron Kingery MSU 2009 REU.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
SPECTRAP - GSI progress report and status overview.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Maintenance and Accelerator Support RHIC Start Up 12.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Accelerator Status and Plans
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
March 4, 2013 Photo by Martin Murphy. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
March 7 th Shutdown Shutdown Begins: Monday morning, March 7 th :00 Beam OFF Safety System Testing 08:00 Rack out KRSS, switch MI house power to.
Accelerator Support and Maintenance Startup for Run 13.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
ESS Vacuum Standardization
FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.
Muon Long Term Schedule August 15, µ Points to discuss What is the schedule What is the schedule Shutdown schedules Shutdown schedules How do we.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Friday 5/1/ meeting. I wish to lock in the power outage onTuesday 5/5/09 at the end of the 0930 lab scheduling meeting speak now or :
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Shutdown Update Switchyard - Neutrino Muon MTest - MCenter Michael Geelhoed 2/22/13.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
CUB Outage Schedule April 21, 2006.
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to resolve the high gas load at MI308 MI back-fed from Master Sub-Station ○ KRS T85 work complete, but still using Feeder 45 for MI conventional Need to schedule a 20 minute MI conventional power outage to remove the back-feed from Master Sub-Station after tunnel work.  SY120 Neutrino Muon ○ G2 NM1 berm pipe progressing Mtest ○ MC6 magnet replacement

MI 307 to 309

Section 3  Stable Holding vacuum No further work

Section 2  Contamination Bellows Pirani Gauge Samples sent for testing  Section 2 removed Cleaning elements and building a new section in parallel Leak check and reinstall

Section 1  RGA Scan completed Friday Did not reveal anything conclusive Additional baseline scans this morning  Downstream end put under vacuum (not including collimator) Heated bellows for 30 seconds Ion pump tripped off.  Section 1 contaminated Collimator beam pipe will be cleaned in place Remainder of section replaced.

Neutrino Muon M. Geelhoed 8/16/2013 G2 NM1 Berm Pipe Progress Status – Welding third set of pipes in enclosure

August 2013 DRAFT

Shutdown 2012 Schedules and Links: Schedule can be accessed from the Operations Home Page - Schedules -> Operations ScheduleOperations Schedule Direct link to schedule -