Data Archival and System Redundancy John Ledford August 7 th, 2007.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Creating a Digital Picture Frame John Martin Summer 2006 EDIT 6000.
Introduction to Storage Devices
Aloha Observatory Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
The 5-slot 4U DC chassis is one of a line of products that Asis has developed over the years with it’s vas experience in the ATCA field. Asis AdvancedTCA.
The 5-slot 5U AC Chassis,fully field deployable chassis with AC power supply for full redundancy. AsisAdvancedTCA Class Asis AdvancedTCA Class.
Asis AdvancedTCA Class PEM (Power Entry Module) PEM (Power Entry Module) is one of several main components of the DC chassis, its purpose is to supply.
Zeus Server Product Training Son Nguyen Zeus Server Product Training Son Nguyen.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Adapted from CTAE Resource Network – Used with permission. PROFITT Curriculum Basic Computer.
New SIF computer system and TLC digitisation Dan Whiter ASK Workshop June 2008, Stockholm.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
Power System for Ocean Bottom Observatories Taken from the Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
MIS 1.5 Hardware Overview.
September 22, 2009GONG H-alpha Review1 Data Acquisition System (DAS)
Servers Redundant Array of Inexpensive Disks (RAID) –A group of hard disks is called a disk array FIGURE Server with redundant NICs.
Midterm Review MBS 2006 MP Electronics, Basic Concept  Two modules:  Probe module  Surface module  The surface module is replaced by the.
Computer Hardware The Basics. Overview Why is this important? To be able to recognize each of the main parts of a computer As a professional in digital.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Personal Computers and Applications Networking for Home and Small Businesses.
 Chasis / System cabinet  A plastic enclosure that contains most of the components of a computer (usually excluding the display, keyboard and mouse)
The Internal Components of a Personal Computer (PC)
Presented by:- NAME : Sanjay Kumar Pani BRANCH : Electrical & Electronics GROUP : ‘B1’ ROLL NO. : E/04/14.
TEE COURSE GRADE 10 Anatomy of a PC DISASSEMBLING AND REASSEMBLING STORAGE DEVICES Practical Activity Guidelines and steps.
COMPUTER MAIN PARTS “HARDWARE AND SOFTWARE”. HARDWARE LITERALLY, " HARDWARE " WOULD MEAN " HARD GOODS ". THIS CONCEPT IS INTENDED TO MEAN ALL TANGIBLE.
Day 10 Hardware Fault Tolerance RAID. High availability All servers should be on UPSs –2 Types Smart UPS –Serial cable connects from UPS to computer.
Elements of a Computer System Dr Kathryn Merrick Thursday 4 th June, 2009.
1 An Introduction to the Storage Bridge Bay Specification.
Server Hardware Chapter 22 Release 22/10/2010Jetking Infotrain Ltd.
Secondary Storage Chapter 7.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Dr. Walaa Nasr.  By the end of this lecture the students will be able to identify :  Computer system  Hardware and its contents  Software  Networks.
IS Fall 2009 Chapter 3 8/31/2009. LOOKING AT THE PARTS 8/17/2009IS 2101/01---Fall
COMPUTER PART ANALOGY PROJECT
Updated August 2013 Lead-Gen Strategy Using Exhibit Leads & Sales Technology.
October 28, 2002 International Loran Association Modernization of Nii Jima Transmitter Control Presented by Michael Weisenbloom.
Off Detector Electronics System [LNF-INFN] 1 Off Detector Electronics System Fan Unit ODEODE 1 ODEODE 2 ODEODE 3 ODEODE 4 ODEODE 5 ODEODE 6 ODEODE 7 ODEODE.
Databases March 14, /14/2003Implementation Review2 Goals for Database Architecture Changes Simplify hardware architecture Improve performance Improve.
REDUNDANCY Dr. John P. Abraham Professor UTPA. This slide series is a summary of what we discussed in class. Power Broadband Hard Drive Backup Cluster.
Storing data on your computer & network. Storage devices Hardware Hard drive Flash drive Tape File server (HD) SAN NAS Software System software Windows.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
McLean HIGHER COMPUTER NETWORKING Lesson 15 (a) Disaster Avoidance Description of disaster avoidance: use of anti-virus software use of fault tolerance.
Asis AdvancedTCA Class Front blades and RTM FRU stand for Field Replaceable Unit, front blade is a third party blade (must be ATCA compliant), that the.
5.3 HS22 Install Specifics. Removing the blade server cover If the blade server is installed in a BladeCenter unit, remove it (see Removing the blade.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
An Investigation of Crosstalk on the Rapid Transfer BPM Analog Transition Module PC Board August 23, 2006 David Peterson Antiproton Source Department Fermi.
Disaster Recovery and Business Continuity Planning IBK3IBV01 College 7 Paul J. Cornelisse.
The 2-slot 2U DC chassis is one of a line of products that Asis has developed over the years with it’s vast experience in the ATCA field. Asis AdvancedTCA.
Chap 5: Hard Drives. Chap 5: Magnetic HD Chap 5: Solid State Drives.
Install, configure and test ICT Networks
By Paul John PARTS OF A COMPUTER. Modem  device connecting computers via phone line, allowing the exchange of information.
1 CEG 2400 Fall 2012 Network Servers. 2 Network Servers Critical Network servers – Contain redundant components Power supplies Fans Memory CPU Hard Drives.
ARUN S CS-7 NO:6. HIGH SPEED OPTICAL CABLE TECHNOLOGY HIGH BANDWIDTH UNIVERSAL CONNECTOR SUPPORTS MULTIPLE PROTOCOLS  10Gb/s to 100Gb/s  single universal.
High Availability Environments cs5493/7493. High Availability Requirements Achieving high availability Redundancy of systems Maintenance Backup & Restore.
Etere MTX IT Based Playout. Why MTX  Our vision is to deliver an integrated framework  MTX follow this vision not a simple video device but an integrated.
 There is a growing trend in the use of digital media compared to more traditional formats  The Apple iTunes Store SM became the #1 music retailer in.
MSG Laptop Computer (MLC) Transition to A31p Thinkpad.
62cm 64cm. DAQ status and Plans DAQ –Timing tuning –Which tools to learn (SC, Event monitor, GPIO, MIDAS, DIP, laser, storage, analysis) Plan with beam.
~How PC Parts Work~ (30 MARKS). List 4 External components you can see on the PC in front of you and describe the basic function of each one. 1) DVD Drive.
CompTIA Server+ Certification (Exam SK0-004)
Aloha Observatory Design
Chapter Objectives In this chapter, you will learn:
Etere MTX IT Based Playout.
Software Overview Sonja Vrcic
T1 Electronic status Conclusions Electronics Cards:
4-3-1 Data Transfer. By the end of this topic you should be able to:-
Power couple. Dell EMC servers powered by Intel® Xeon® processors and running Windows Server* 2016, ready to securely handle dynamic business workloads.
Introduction to Storage Devices
Computer Buying Project
Seminar on Enterprise Software
Presentation transcript:

Data Archival and System Redundancy John Ledford August 7 th, 2007

2 of 9 Data Backup Servers 6 Terabytes each Two identical servers RAID6 Fully tested Ready to be packed 60-80MB/s transfer Anthony trained Manual written

3 of 9 Getting the Data Off Radar Manual written Updated Contains Linux Primer for Radar Anyone should be able to use

4 of 9 Getting the Data Home Waterproof Padded Lockable Wheels Hard to miss Two hard drive sets Two paths home

5 of 9 System Redundancy Three Systems, just in case. 1.Main system 2.Full set of replacement cards 3.Another set of replacement cards for depth sounding only

6 of 9 COTS Equipment Spares Brand new CPUs –Primary and secondary = brand new Brand new HD Carriers –Primary = all new –Secondary #1 = new carrier, old HDs –Secondary #2 = new carrier, old HDs Spare VICOR Power Supply Spare CPCI Power Supplies –Already double redundant in chassis Spare Booster Fan

7 of 9 CReSIS Equipment Spares 100% Backup of Digital Cards (2) Spare RF Receivers (1)Spare RF Transmitter (9) Spare Rear Transition Modules (1)Spare Timing Backplane (1) Spare Power Backplane

8 of 9 Another Backup Additionally another pair of carrier cards, waveform generators, and DAQ cards are being brought to make a simple depth sounder if necessary out of connectorized RF components.

9 of 9