Agenda Introduction et présentations Personnel + Superviseurs Organisation et Activités dans la section Piquets services / Working Hours AOB –Holiday planning.

Slides:



Advertisements
Similar presentations
Unit 5: The Executive Branch
Advertisements

What is FEC? Full Economic Costing. Background  1998 Spending Review – Extra Research Funding  TRAC: All Universities were in deficit for research Significant.
F. Fernandez 28/10/ Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Info Day on New Calls and Partner Café Brussels, 8 September 2010 How to apply – Budget and Reporting.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
RCUK fEC Update. Full Economic Costing From 1 September 2005, research grants awarded by the UK Research Councils.
Michaela Striteska Vice-Dean for External Affairs Jan Stejskal Supervisor of the Joint Study Programme
P.R.A.T. Patients’ Rights Advocacy Training Building Advocacy Skills Basic Training- Lanterman-Petris-Short Act.
May 5, 2010, Human Resource Services Agenda Preventing Sexual Harassment Year End Closing – Payroll Distributions SPI Form Summer Appointments For Faculty.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
FAO/WHO Codex Training Package Module 3.2 FAO/WHO CODEX TRAINING PACKAGE SECTION THREE – BASICS OF NATIONAL CODEX ACTIVITIES 3.2 How to develop national.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Draft Collaboration Model for HLLHC-DS HLLHC-DS Meeting 20th July 2010.
Özkan ŞAHİN Uludağ University Physics Department Bursa -TURKEY Bursa gas detector laboratory, status.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
1 29 June 2011EDMS CERN Greenhouse Gas Inventory – Detector Cooling 1.Background; 2.Status on regulatory requirements; 3.Inventory carried out.
Joint Meeting ATLAS-CERN Detector Group / PH-Detector Technology Group Overview of the PH-DT group: Group Structure Current Projects Services White Paper.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
CERN HR Department Strategy, Management and Development DT2 News Summer Students Presentations: Henrik Friis Dam 'Characterization of Scintillating Fibres.
DT News The Insertable B-layer (IBL) project for the ATLAS Upgrade Raphael Vuillermet, François-Xavier Nuiry and Christophe Bault DT Science-Techno Tea.
Alternative Work Schedule
Compensation Methods.
CERN Stand-By Duty Rules From “Staff Rules and Regulations” + AC23 9 th November 2006 Véronique Lefébure.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Status and role of International Department (Slovak experience) MGSC Meeting Luxembourg 23 – 24 March 2012 SOSR.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
DT Science-techno tea DT news (CJ) Presentation : Principle, Design and Construction of the ALICE HMPID Paolo Martinengo, Yannick Lesenechal and Jaap van.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 The agenda Coordinator's Welcome 09:05.
DT News CJ DT Annual Report 2010 CJ Measurement of the LHC Luminosity André Braem, Matthieu Heller with Scintillating Fibre Detectors in Roman Pots DT.
General News DT Buildings New Tasks - Projects Other items G. Olesen - PH-DT-DI.
25/03/2014P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas1 Outline LHCb gas systems meeting Outline Introduction Review usage of LHCb gas M&O 2013 Review achievements.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
PH Theme 3 R&D Meeting with WP leaders 3/7/2008. Overview of WP’s.
Section meeting PH-DT-EM2 Agenda  Short presentation (tour de table)  General information news  Future projects  Discussion  Coffee and cake PEREZ.
1 st DT-PO section meeting Friday May 16th,14:00, in 155-R-047 Agenda Meeting people Structure and organization of DT Budgets Office Space Mandate of PO.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Transport and Handling Manpower Planning S. Prodon – LEAF
DT News CJ Survey techniques for experiments and advanced 3D Digital Reconstruction Andrea Catinaccio, Aurelie Maurisset, Christophe Bault DT Science-Techno.
Thursday December 11th, 15:00 Hrs, room 155-R-047 Agenda General news and DT (Andrea, Antti) Euclid-Catia.
Thursday November 19 th, 15:00 Hrs, room 155-R-047 Agenda An introduction to the Project Office.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
New PH-DT website Nefeli Kousi PH-SFT/PH-DT Supervisor: Danilo Piparo PH-SFT.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
CLIC-CTF3 accelerated programm meeting – CERN- 19/05/04 1 CLIC-CTF3 accelerated programm Meeting May 19 th 2004 LAL statement P.LAVOCAT LAL Technical Director.
Section Meeting News and MARS 22/01/ FH1. General Activity and Staff Organigram for the DI Section 22/01/ FH2 TF+GlassAndre Braem Thomas Schneider.
Performance Appraisal and Management at CERN
Detector Technology Group (PH/DT)
IT-CM Group Meeting Tim Bell 12th January 2016
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Performance Appraisal and Management at CERN
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
CMS gas systems meeting
Merging DT1 + DT2 FH /
Performance Appraisal and Management at CERN
Cryogenic Risk Assessment in LHC
EU Institution Board 1 representative of each participating institute
Informal document GRPE-74-20
the field of Solid state Detectors This comprises
Presentation transcript:

Agenda Introduction et présentations Personnel + Superviseurs Organisation et Activités dans la section Piquets services / Working Hours AOB –Holiday planning

Personnel + Supervisor NameFirst NameSupervisor BERGSMAFelixHahn BOURGEOISNicolasMaire BRAEMAndreHahn CARRIEPatrickHaider COSSEY PUGETFrancoiseMoll D'AURIAAndreaHaider DAVIDClaudeBraem DE MENEZESLouis-PhilippeHaider DERONTLaurentMaire FORTINRichard GeorgesMoll GLASERMauriceMoll GUIDARobertoHahn GUIPETAntoineMoll HAHNFerdinandJoram HAIDERStefanHahn MAIREGillesHahn MCGILLIanMoll MERLETFredericHaider OLESENGertHahn PAVISStevenHaider PONSXavierMaire RAVATSylvainMaire REY-MERMIERRolandBergsma or FH SBRISSAEdoHahn SCHNEIDERThomas HansSchmidt VAN STENISMirandaBraem WASEMAlbinHaider

Work Organisation The DT group has defined: –Projects: A project is a temporary (usually > 3 months) endeavour to provide a deliverable, a service or scientific results (report). Types: Detector Construction, M&O or R&D. –Services: A service is a competence or a performance which is kept available centrally in the benefice of all experiments, e.g. Bonding Lab or the PS irradiation facility –Small Activities: Is a short job which is not defined as project and which is not a service. –Design Studies: Design studies are activities of limited volume (in manpower and time) to assess the feasibility of an approach. (often prior to a project) The work is done in a matrix structure Resources are allocated in the DT Coordination Meeting

Projects with DI participation ProjectProject TypeProject Leader DI FTE (2008) Gas System M&OM&OSH4.1 Gas System Construct.Det. Construct.SH + FH3.6 Magnet ControlsDet. Construct.Edo S.3.2 MCS, MSS, DSS + RCSM&OEdo S. + Gilles M.2.7 WP4 +7R&DMM + MC1.3 ATLAS ALFADet. Construct.C. Joram1.2 TOTEM RP + T1/T2Det. Construct.CJ + Leszek R.0.9 LHCb MuonDet. Construct.Burkhard S.0.7 T2K Field MapperExternalStéphane R.0.6 X-HPD + AX-PETR&DC. Joram0.1 Total18.4

Services with DI Participation ServiceResponsibleFTE’s from DI Bond Lab.M. Moll2.4 Thin Film Glass Lab.A.Braem1.3 B-field measurementsF. Bergsma1.2 Irrad. FacilitiesM. Moll / M. Glaser1.1 Rad. MonM. Moll0.4 Gas SupportS. Haider0.3 Total6.7

Small Activities with DI Participation Small ActivityTypeActivity Leader AMS Field MapperExternalFelix B.

Working Hours (1) Introductory –New SR will be presented to council in June –New AC in preparation for next year (temporary regulation for this year) –All extra payments for overtime, standby, aso. need prior approval from Department Head. Issues: Overtime Standby (voluntary staff above 55 years) Free Standby (Expert support or 2 nd level) voluntary basis Shift Work (doesn’t concern us) Changes in in new Rules (not necessarily complete): –Fellows (same level as staff) –Associates cannot participate in official CERN Standby service –Remote interventions will be possible and compensated Current compensation up to CP Eb Note: preliminary proposal (not endorsed)