CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Chapter 8 Plot Plans.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
John Osborne GS/SE March 2013
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Construction and Installation of the CLIC Experimental Area
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
CENF target facility civil engineering specifications – summary M. Calviani (EN/STI) for the CENF-SBWG team Neutrino Platform Meeting 30 th October 2014.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
09 July EHN1 civil engineering project status (JUNE) Summary: Updating of the activities carried out on-site (Done) in JUNE List activities on going.
06 August EHN1 civil engineering project status (JULY) Summary: Updating of the activities carried out on-site (Done) in JULY List activities on.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Technical Specification Handling Engineering Group.
22 October Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER.
15 January Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Survey Meeting John Osborne, CERN 8 February 2016
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
Pieter Mattelaer (SMB-DI)
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
WP 17.1 Civil Engineering Point 1 - Networks LS2 COMMITTEE – CERN – Pieter Mattelaer (SMB-DI)
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
25 June EHN1 civil engineering project status (MAY) Summary: Updating of the activities carried out on-site (Done) in MAY List activities on going.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
IT-4337/SMB – Bidders Conference
Equipment simplified model SMR UR safety
San Luis Potosi – New plant April 24th 2015
Safety Documentation EHN1
CERN Neutrino Project 26th November, 2013 M.Nessi.
CE Status: Activities executed until 03/08 and ongoing
Special LS1 day on 12 June 2012, EDMS:
EHN1 Neutrino Installation Plans
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Building Construction I Sofia Sebastian 1
Value of contract: Length of contract: Contract start date:
Powering and Safety day Underground access during powering tests
East Hall under construction
LINAC 3 Meeting ICL machines Injectors
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved by CERN on 18/03/2014 (EDMS and ) Civil engineering Tender Design phase started on 2/04/2014 by ARCADIS Submission of the « Permis de construire » on 19/05/2014 Market survey issued to the firms on 11/06/2014 → Two work packages (WP1-Civil engineering & WP2-Steel structure and cladding) 18 September Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi

Done: (2/2) Tender documents ready and EDMS approval procedure launched on 10/07/2014 → 9 firms qualified for WP1, 7 firms for WP2 and 4 firms for WP 1+2 Specification Committee meeting held on 29/07/2014 Tender documents sent to the firms on 18/08/2014 Construction Design phase started on 18/08/2014 by ARCADIS Bidders Conference held on 4/09/2014 Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 18 September CENF – Civil Engineering Extension B887

Next steps: Bids expected on 2/10/2014 Preparatory works to start on October 2014 (abattage, déviation de réseaux, etc) Construction Design expected on November 2014 Adjudication foreseen on December 2014 FC Contract signature Start of the works expected on January 2015 (if possible, anticipate Excavation works as early as possible) Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 18 September CENF – Civil Engineering Extension B887

Extension Site Installation Area Tunnel TDC85 Experimental Hall B.887 (EHN1) The Extension will extend northwards from the building for about 70 m in the direction of the beams. Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 18 September Technical Aspect: Location CENF – Civil Engineering Extension B887

The Extension's dimensions are 72 m long by 50 m wide and 20 m high. The extension includes two large pits of 7.35m and 9.0m deep. The top metallic structure is similar to the existing building, allowing for an easy continuation of the overhead crane and services. Extension Existing EHN1 The technical gallery will be prolonged. Swallow service trenches will provide the access from the sidewalls to the pits. Metallic Structure Pits Technical Gallery Service Trenches The works are broken down into two work packages: Work package 1 - Civil engineering Work package 2 - Structural steelwork Technical Aspect: General info Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 18 September CENF – Civil Engineering Extension B887

Plan view Section A-A Section B-B A A B B -Construction sheet piles (or Reduce Cost Alternative Option) -Construction diaphragm wall and final tie beams -Construction of reinforced concrete structure (raft foundations, slabs, walls, etc.) -Demolition of the existing gable retaining wall Technical Aspect: WP1 main activities (1/2) CENF – Civil Engineering Extension B887 Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 18 September

The works to be carried out will include: -General worksite installation -Rerouting and cutting existing underground networks -Mass and ditch earthworks -Drawdown of the water table -Road works, car parks and landscaping. -Rainwater treatment structures (worksite and definitive) Notes: Particular attention should be kept to the extracted cut material within 5.50m of distance from the TDC85 Radiological Protection: People allow to enter the technical gallery or inside the existing building 887 should equipped (passive/operational dosimeter) and accredited by CERN. No special measure need to be planned to work outside Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 18 September Technical Aspect: WP1 main activities (2/2) CENF – Civil Engineering Extension B887

-Structural steelwork and associated components (Main and Secondary structures, Internal structures, Travelling crane structures) -Metalwork: guardrails, stairs, ladders, doors -Removal of the north gable of the existing building (not before the extension is water-tight and air-tight) Please note that primary framework shall be erected after completion of the infrastructures and therefore above the pit and that this work package shall provide the necessary worksite protections Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 18 September CENF – Civil Engineering Extension B887 Technical Aspect: WP2 main activities (1/2)

-façade -roofing -doors -glazed windows -ladders with safety cages -safety barriers -rainwater pipes -cryogenics roof -etc. Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 18 September CENF – Civil Engineering Extension B887 Technical Aspect: WP2 main activities (2/2)

Anticipated start of the works (if possible) + 18 months Source : ARCADIS → to be updated after tendering procedures Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 18 September CENF – Civil Engineering Extension B887 Schedule

Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi 18 September CENF – Civil Engineering Extension B887 Thanks for your attention.. Questions?