Summary Plans 2013. Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.

Slides:



Advertisements
Similar presentations
1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
Advertisements

José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Walls crates cables gas chambers electronics CERN adb.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
NA62 straws Status and plan. Content Module assembly and preparation Electronics Testing, design, procurement Stacking Shipping Technical run Excitation.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
March ‘08G. Ruggiero Totem Collaboration Meeting Roman Pot Detectors 1 st RP Detector Assembly RP vs DCS and DB CERN Open day.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Technical Support Activities in PH-ADO-PO
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Status of NA62 straw electronics Webs Covers Services Readout.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
CLAS12 Drift Chamber Prototyping
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Electronics and DAQ status Frontend - covers – Preparation of the final cover version and production Design finished Mounting of RJ45 verified using selective.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
Status of NA62 straw electronics and services
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
News about the WA104 Programme
T1 Electronic status Conclusions Electronics Cards:
10/month is the present production rate 2 FTE + sporadic contributions
Pierluigi Paolucci - I.N.F.N. Naples
UK CMS Oversight Committee Mtg
CAN branch PSU – Update meeting
Testbeam status report
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

Summary Plans 2013

Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary

Module assembly First chamber at CERN well under way (HV going on) First module in Dubna is progression well. The plan is to complete 3 modules by the end of Production DB!! (discussion next week in Dubna)

Plans and manpower at CERN ~12 months or 6 months of two operators

Readout DAQ Several issues are identified and we need to establish a plan to address them Set-up in the lab, 64-straw prototype and Module 1 in ECN3 is available No more test beam COSMICS Use monochromatic electron beam (2 MeV at ~100Hz) made in DT and coordinated by Christian Joram. Ready in January DAQ ? DCS

Procurement full detector Module frames have been delivered Manifold delivery will be completed in February These are the big contracts for detector parts Active webs are ordered and first delivery in February Plastic parts, crimp tubes, gas connectors, covers, wires etc ok MPOD ok. Order the complete set Gas system works well: the 3 other racks need to be completed Patch panels. Validation has been done (except HV). A few modifications to add, but we can launch the production of patch panels About 1200 straws needed at CERN Electrical components, cables, Active Covers, PP, SRBs….

Stacking and installation The stacking table need probably to be moved to a different location We have validated the procedure which allows to be confortable with 1 week per chamber for stacking Note: We have not yet addressed in detail the test and commissioning

Summary The TR has been very important step and we have solved a long lists of issues. The time it has taken to complete the first chamber for the TR is well invested will be recovered when we install the 4 chambers in 2014 We have also identified issues on readout and DAQ which we have to work on during 2013