ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.

Slides:



Advertisements
Similar presentations
MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.
Advertisements

Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Third Energy Package for Change of Supplier 2009/73/EC.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
SPA Enquiry Process - Additional Requirements for AMR sites ICoSS Presentation.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal January 2010 Elaine Carr ScottishPower.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Version /08/2008 The AQ calculation and validation process Compiled and delivered from the xoserve AQ Team for Review Group 209 Susan Prosser & Steve.
Xoserve sense checks & validation Reasonable Endeavours Claims.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Shipperless & Unregistered site working group Recommendations to Process Backlog Shipper Activity Monthly report No interest - orphaned Widened identity.
PN UNC Workgroup Supply Point Register 25 th October 2011.
P274 – National Revenue Protection Service. 2 Principles of X-industry gas theft service The impact on the participants will be revenue neutral (no supplier.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
PN UNC Workgroup iGT Services 7 th February 2012.
1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Current and New process Current Process New Process Response: Does not want service but live supply -Passed into Orphaned Report Intends to confirm – Remains.
Analysis of the Xoserve Read Validation Proposal Author: Alex Cullin 27/08/2014.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Results of Group Discussion. Discussion Points Shipperless and Unregistered Sites have been partly There are a number of Shipperless and Unregistered.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
10 August 2011Page 1 IGG Agenda 10 th August 2011 Minutes from Previous IGG Meeting10:30 – 10:35 Review of Action Items10:35 – 10:45 CER Update10:45 –
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal February 2010 Karen Kennedy ScottishPower.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
Industry Dialogue on xoserve Services 14 th September 2007.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Gas Performance Assurance Framework 11 th January 2013.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Options for Mod 640 Replacement
Must Read Process Guide For Shippers
Incentives 26 September 2018.
Elaine Carr ScottishPower
Chris Warner Network Code Manager
Release 2 Scope Business Benefit Review
Industry Shipperless & Unregistered Working Group
Gas Long Term Vacant (LTV) Proposal April 2010
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Joint Theft Reporting Review (from meeting 1st March 2019)
Modification 421 – Updates and Benefits Case
AQ BTU Form – Process & Timeline 29th September 2009
Development Work Group 0209 Straw Man Update
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
Customer Issue Management CoMC Update
Retail Energy Code - Data Access Schedule
Customer Issue Management CoMC Update for April & May 2019
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower

ScottishPower, Energy Retail 2 2 Items for Discussion Scope of vacant process Initiation of vacant status Process/management of vacants Monitoring requirements Reporting requirements Safeguards Summary of Issues to Consider

ScottishPower, Energy Retail 3 3 Scope of the Vacant Process Should the proposal relate to SSP or LSP sites or both? In electricity the process relates to domestic and NHH What charges should be included – capacity or commodity or both? In electricity capacity charges are retained, however in the gas market these make up 95% of costs Propose that the modification relates to SSP and LSPs, with the exception of DM Propose that the modification applies to capacity and commodity Issues to Consider: Would the Modification need to change to reflect the detailed scope?

ScottishPower, Energy Retail 4 4 Initiation of Vacant Status Should a site classify for vacant status after 3 months? In electricity 3 months is the applicable period of qualification There has been no objection to the 3 month proposal in initial gas discussions What evidence does a Supplier have to provide to initiate a site as vacant? In electricity a flow kicks off the process There are no consistent meter read flows across the gas industry Propose that the modification retains a 3 month qualification period Propose that MR site visit notification is sent to Xoserve flagging a vacant property Issues to Consider: How do we ensure that only genuine vacants are notified?

ScottishPower, Energy Retail 5 5 Process/Management of Vacants [1] What do Xoserve do when a site is notified as vacant? In electricity the EAC is set to zero There are two schools of thought – either AQ goes to 1 or sites retain AQ and come out of Settlement What happens on conclusion of a vacant? In electricity EAC is set to Profile Class Average, until Annual Advance updated No definitive feedback received on gas equivalent Propose that AQ is set to 1 for capacity and commodity payment calculations Propose that AQ is set to historic pre-vacant value Issues to Consider: Should Xoserve “set aside” vacant sites for monitoring?

ScottishPower, Energy Retail 6 6 Process/Management of Vacants [2] What issues are there with the AQ Review process? There is no reason to exclude vacants from the AQ Review process The risk on reduced historic consumption factoring into future AQs is the nature of AQ/RbD How does a site retain vacant status? Supplier continues to send vacant notices on the back of reading visits, these being no more than seven months since the last notification There should be no consumption increment at the supply point Propose that vacants still go through AQ Review process as normal Propose that if a Supplier does not submit further notification or consumption commences that the AQ is reverted to the historic value Issues to Consider: What happens, and when, if a read is submitted for a vacant site? Are there invoicing considerations for when consumption re-commences? Are there any distinct issues for LSP sites, given the potential different usage of new tenants?

ScottishPower, Energy Retail 7 LTV Process and Timelines Data Retriever Supplier Xoserve property identified as Vacant? Identify as candidate for LTV process property identified as Vacant (2 records) Identify mprn as LTV. * Send update to xoserve Process mprn as Vacant Is property identified as Vacant Is it <3 months since Last reading/update Is it > 7 months since last reading/update Reduce AQ to ‘1’ yes no Send read to xoserve Process reading Reinstate pre-vacant AQ value Await further read/update within timescales Vacant flag will have lapsed. Process as Candidate. (M1) Is it >3, < 7 months since last reading/update * Send update to Xoserve confirming Vacant Retain Vacant status Retain AQ at ‘1’ Mprns vacant >24 months Arrange Isolation of meter Withdrawal notice To xoserve Process Withdrawal Notice * Medium of files to be agreed ** If no update notice is received by xoserve at the 7 month point, then the AQ reverts back to previous ** M1 M3 – M7 M7 – M24 M24+ (TBC)

ScottishPower, Energy Retail 8 8 Monitoring Requirements Audit/Xoserve Reporting Similar to the AQ Review process – anonomised information provided to industry Ofgem role Monitoring Shipper/Supplier usage Addressing concerns Following up on issues Audit, as required Regulatory sanction AQ Review Look for reads getting submitted for vacant sites Monitoring patterns of vacant sites (similar to Threshold Crossers) Customer contact Xoserve contact properties to ensure that a site is vacant

ScottishPower, Energy Retail 9 9 Reporting Requirements The Supplier must proactively attempt to obtain meter readings and retain a record of these attempts: –extra attempts to contact the owner e.g telephone, post, –attempting to contact the local estate agent or local authority –where dual fuel by checking for a similar pattern with electricity consumption All of this information and attempts to contact the customer should be retained for Ofgem monitoring Issues to Consider: Does this need to be prescriptive?

ScottishPower, Energy Retail 10 ScottishPower, Energy Retail 10 Safeguards Issues to Consider: Warrants are normally only obtained for inspection – are there any issues with this? Could there be regional differences with warrants, due to the different judiciary? If the industry process only allows for sites to remain vacant for a defined period of time would this allow easier access to warrants? What happens when a Supplier can’t obtain a warrant? Should there be a time limit in relation to how long a site can sit as a vacant site without moving to isolation/withdrawal? If a time limit is set, then this has to take account of commercial consequences and customer perception/inconvenience.... as well as addressing safety concerns/issues

ScottishPower, Energy Retail 11 ScottishPower, Energy Retail 11 Scope: Would the Modification need to change to reflect the detailed scope? Summary of Issues to Consider Initiation of Vacant Status: How do we ensure that only genuine vacants are notified? Process/Management of Vacants: Should Xoserve “set aside” vacant sites for monitoring? What happens, and when, if a read is submitted for a vacant site? Are there invoicing considerations for when consumption re-commences? Are there any distinct issues for LSP sites, given the potential different usage of new tenants? Reporting Requirements: Does this need to be prescriptive? Safeguards: Does this need to be prescriptive? Are there any other issues?