1 Industry Shipperless & Unregistered Working Group
Wednesday 19th October 11.00am at Xoserve

2 Agenda Introduction: (Alison Jennings & Mark Woodward)
Change to Shipperless & Unregistered sites responsibility Previous minutes Statistical Information: (Mark Woodward) Overall industry position with unregistered and shipperless meter points Updates: MOD0369/369a MPRN Creation Workgroup Review of root cause recommendations to date Agree next steps for workgroup A.O.B.

3 Statistical Information

4 Overall Industry Unregistered and Shipperless Sites Meter Points

5 Overall Industry Unregistered and Shipperless Sites Meter Points
Age Analysis Legitimate Orphaned Volume % < 2000 98 0.31% 2000 31 0.10% 2001 60 0.19% 2002 445 1.39% 2003 1,148 3.59% 2004 1,370 4.28% 2005 2,224 6.95% 2006 4,687 14.64% 2007 7,836 24.47% 2008 6,874 21.47% 2009 4,349 13.58% 2010 2,900 9.06% TOTAL 32,022 100.00% Volume % < 2000 349 2.33% 2000 587 3.92% 2001 852 5.70% 2002 1,002 6.70% 2003 1,628 10.88% 2004 1,489 9.96% 2005 1,112 7.43% 2006 1,161 7.76% 2007 1,851 12.38% 2008 2,144 14.33% 2009 1,847 12.35% 2010 935 6.25% TOTAL 14,957 100.00%

6 Overall Industry Unregistered and Shipperless Sites Meter Points
AQ value for SSP and LSP Shipper Activity Orphaned SSP LSP TOTAL 12,221 2,736 AQ Value 250,689,356 1,474,882,805 SSP LSP TOTAL 348 78 AQ Value 6,706,403 21,143,127 No activity Legitimate SSP LSP TOTAL 1,137 260 AQ Value 25,428,268 245,313,108 SSP LSP TOTAL 26,894 5,128 AQ Value 602,115,645 5,287,584,750

7 UNC Modification Proposal 0369 -
Re-establishment of Supply Meter Points

8 Isolation & Withdrawal (Meter Removed) (in scope scenario)
8

9 Isolation & Withdrawal (Meter Capped & Clamped) (in scope scenario)
9

10 Isolation & withdrawal, Shipperless then Confirmation (out of scope scenario)
10

11 Isolation only (no transfer) (in scope)
11

12 Isolation only & transfer (out of scope scenario)
1212

13 MPRN Creation – The circumstances that trigger a request to create a MPRN on UK Link

14 MPRN Workgroup a) Service laid at same point on the main (Alteration of service, Service replacement & Capacity increase) b) Old service disconnected and new service fitted at a different location in the gas main d) Additional service fitted at different points in same gas main c) Old service disconnected and new service fitted at different main

15 MPRN Workgroup e) House converted to flats old service removed and additional services fitted at different points in the same gas main f) House converted to flats and existed service changed to flat 1 and additional services fitted at different points in the same gas main g) New service laid at any point on the main (New Development) also Plot address

16 Timescales for MPRN Request
Current high level process: Requester to UIP for infrastructure UIP to network Planning for load (This only happens where the connection will be made to Medium pressure) Quote to requester Quote Acceptance UIP submits a request to connect to network and receives authorisation prior to proceeding UIP request for M Number Creation to xoserve UIP provides requester with M Number UIP notifies network of intended start date of works UIP provides network connections with service completion details and receives either an adoption of assets or rejection for data/contents

17 UIP M Number Creation process
Finish Start Details provided of M Number used for service Request for Service Service Cancellation Service Requester Start Service planned & M Number requested for creation on UK Link Finish Details provided of M Number created on UK Link Batch of MPRN’s requested Reinvestigated Reinvestigated Information returned on cancelled service Utility Infrastructure provider (UIP Service laid and tagged Service cancelled Rejected System validation checks performed Rejected System validation checks performed Accepted Meter point details on UK Link set to EX Accepted xoserve

18 Shipper M Number Creation process
Finish Start 7. M Number details provided date meter work planned 1. Meter installation required End Consumer 2. M Number requested for creation on UK Link via FOM or MNC 5. Details provided of M Number created on UK Link 6. MPRN provided to MAM meter work planned 4. Reinvestigated by Shipper Shipper Rejected 3. System validation checks performed Accepted xoserve

19 Options Option 1: Create MPRN at quotation acceptance stage (Current Process) Option 2: Create the MPRN at service planned date stage Option 3: Create the MPRN post service laid Option 4: Create MPRN at a fixed date prior to service in the ground and meter fix stage (e.g. 5 days etc..) Option 5: Create the MPRN with a PL status and change to LI when service laid (Set to EX if PL status and remained unregistered >2yrs)

20 Review of root cause recommendations to date