S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.

Slides:



Advertisements
Similar presentations
CSC Supervisor Scheme CSC-SV PerCrate FED LTC/TTC TF CSC-FM RCMS DCS Local DAQ HV LV gas RUI EVM (RU/BU) FU/TA.
Advertisements

Slice Test DAQ. Two Systems Underway There are essentially two systems being designed concurrently: Trackfinder test, and EMU slicetest. Goals of the.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Slice Test DAQ Software what we did in Florida, and what problems may be lurking beneath the surface…
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
XTRP Hardware Mike Kasten University of Illinois 2/24/00.
TB2004 DAQ Code Development Status & Prospect. July 1, 2004TB2004 DAQ Code Development2 Contents 1.TB status –run control –peripheral/FED crate –DAQ column.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Gregory PawloskiAugust 22, 2002 MPC Testing Progress.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
EMU Reference Histogram Comparison Unit R. Cavanaugh, V. Barashko, A. Korytov.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
1 The TrackFinder GUI D. Acosta, L. Gray, N. Park, H. Stöck University of Florida.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
27-April-2009CSC Shifter Training Manual1 CSC Shifter Training EMU Page 1 Fred Borcherding Reach from CSCOperations Twiki page or directly:
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
Test Software for EMT Paul Padley Rice University May, 2005.
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
SX5: YE+2Counting House iBoot NPS emu slice0 2 emu slice0 1 Emu dqm Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
DCC Out of Sync Problems Stan Durkin, Ohio State.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Recall: CSC TF Halo rate spikes during run (23 May)
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
University of California, Los Angeles Endcap Muon Purdue
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
University of California Los Angeles
University of California Los Angeles
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Current Status of CSC Trigger Elements – Quick Summary
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
The Ohio State University
CSC Trigger Primitives Test Beam Studies
University of California Los Angeles
TMB and RAT Status Report
B904 Status Report by Fred B.
Fred’s Input to Rice Workshop
Configuring the Peripheral Crates
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
FED Design and EMU-to-DAQ Test
Plans for the 2004 CSC Beam Test
CSC Status Report Status reports;
Presentation transcript:

S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005

S. Durkin, Software Review, March 16, 2006 CSC CFEB ALCT 1 of 24 CFEB 1 of 2 LVDB AFEB CFEB ALCT MPCMPC DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB CCBCCB VMECONTROLLERVMECONTROLLER Peripheral Crates (on iron disks) DCS TTC Crate Track Finder Crate Readout Data FED Crates (in USC55) in USC55 TMB-RAT DMB CCB MPC DDU DCC 1 of 5 Emu Electronic System

S. Durkin, Software Review, March 16, 2006 There will be 4 CSC FED crates in USC55 36 DDU’s, 8 DCC’s in total Receive data from DMB’c Format and send data to DCC Send Data to Local Farm Detect and report errors Receive data from DDU’s Merge and send data to FRL via SLink Custom J3 Backplane High speed data transmission from DDU to DCC DCCDDUs DCC DDUs optional Baseline Optional CRATECONTROLLERCRATECONTROLLER DDUDDU DCCDCC DDUDDU DDUDDU DDUDDU DDUDDU DDUDDU DDUDDU DCCDCC DDUDDU DDUDDU DCC DDU FED Crate Hardware

S. Durkin, Software Review, March 16, 2006 DDU Error Checking

S. Durkin, Software Review, March 16, 2006 FED Library (C++) Controls/Monitors/Updates DDU/DCC Electronic Boards CAEN VME Crate Controller JTAG PROM/FPGA programming Read DDU/DCC Registers for Debugging Monitor Voltages/Temperatures Very Few Write Registers VME Write Registers 1.Kill Fiber 2.Use Fiber 3.Scaling Local Farm 4.FMM Error Register 5.Test Registers

S. Durkin, Software Review, March 16, 2006 FED Library (C++) Modeled directly on Peripheral Crate Library (see M. Von der Mey previous talk) Similar structure reduces programming work XDAQ communications/messaging identical JTAG Firmware (*.svf) Programming Routines Identical Voltage/Thermometer and Register Readout Identica Problems found in Peripheral Crate Software can be fixed in FED Crate -Software and visa versa FED Crate – Run Initialization No special initialization necessary. TTC signals only.

S. Durkin, Software Review, March 16, 2006 FED Library (C++) FED Crate Hardware is Self Monitoring Hardware sends VME IRQ interrupt on Error Detection 4 threaded processes (one for each crate) capture/service VME interrupts use CAENVME_IRQWait(); CAENVME_IACKCycle(); Threaded processes can request Global Reset from FMM FMM is signaled via VME write to a DDU register Hardware can also request Global Reset independently DCS (see V. Sytnik’s Talk) Board Temperature/Voltage will be accessed periodically through Slow Control

S. Durkin, Software Review, March 16, 2006 Another HyperDAQ GUI. There are 10 more Unique pages I won’t show.

S. Durkin, Software Review, March 16, 2006 FED Library (C++) Conclusions FED Library Status Software fully operational XDAQ Soap messaging for Run Control working XDAQ HyperDAQ GUI for local monitoring fully working VME Interrupt and FMM signaling threads fully working To do: xml initialization file  Oracle data base Firmware not presently archivaled, will do soon Library not tested for multi-crates (will work)