CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
J-C Brient LLR Progress report on the ECAL prototype 2 - New informations on the cost of the W-Si ECAL 3 - A proposal for a new design of the.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
Portland, October 20, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba* Institute of Physics, AS CR, Prague *for CALICE collaboration Silicon.
Henri Videau LLR Ecole polytechnique - IN2P3/CNRSCalor Calorimetry optimised for jets Henri Videau Jean- Claude Brient Laboratoire Leprince-Ringuet.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
Vanel Jean-Charles LLR / IN2P3 NIKHEF 1-4 April 2003 NIKHEF 1-4 April 2003 Technical status of the W-Si project CALICE : CAlorimeter for the LInear Collider.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
CALICE Thermal Simulations Steve Snow 6/3/06 Aim to predict the temperature values and gradients within the CALICE structure. Use spreadsheet estimates.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
10 Nov 2004Paul Dauncey1 MAPS for an ILC Si-W ECAL Paul Dauncey Imperial College London.
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
NIU Workshop R. Frey1 Reconstruction Issues for Silicon/Tungsten ECal R. Frey U. Oregon NIU Workshop, Nov 8, 2002.
28 June 2002Santa Cruz LC Retreat M. Breidenbach1 SD – Silicon Detector EM Calorimetry.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
LCWS2002 R. Frey1 Silicon/Tungsten ECal for the SD Detector M. Breidenbach, D. Freytag, G. Haller, M. Huffer, J.J Russell Stanford Linear Accelerator Center.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
Report from CALICE meeting CERN 9/23-23/2002 Andy White Web Site for meeting: agenda_CALICE_23090.html.
J-C BRIENT LLR AGENDA CALORIMETRY and other subdetectors session J-C. BRIENT LLR Status report on the W-Si ECAL 30’ V. VRBA IP-ASCR Silicon pad sensors.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
J-C BRIENT Prague Performances studies of the calorimeter/muon det. e + e –  W + W – at  s=800 GeV Simulation SLAC-Gismo Simulation MOKKA-GEANT4.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
V.Dzhordzhadze1 Nosecone Calorimeter Simulation Vasily Dzhordzhadze University of Tennessee Muon Physics and Forward Upgrades Workshop Santa Fe, June 22,
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
1 Progress from José Repond Argonne National Laboratory LCWS 2007, DESY, May 30 – June 3, 2007 Emphasis on test beam results.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
P. Checchia LCWS02 Jeju1 Lccal * : an R&D project for the Electromagnetic barrel Calorimeter Design principles Prototype description Status of.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
CALICE Silicon ECal Sensors Status and prospects
Test Beam Request for the Semi-Digital Hadronic Calorimeter
ECAL EUDET MODULE Summary talk
CALICE Meeting Tokyo University, 26/09/2017
Status of Ecal(s) for ILD
(My personal) CALICE Report
ECAL project in the future 2-3 years
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
C. de La Taille IN2P3/LAL Orsay
CALICE Collaboration Meeting KEK/Japan – April 2015
Electronics for the E-CAL physics prototype
prototype PCB for on detector chip integration
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey Mechanics … - Myself Presentation on the hardware R&D Tungsten-silicon sampling calorimeter OUTLINE  status on the physics prototype (mechanics)  status of the technological R&D on the new design

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The mechanics for the physics prototype  Tungsten metrology  Detector slab design  W-Carbon fiber structure The LLR mechanics group participating M.Anduze, A.Busata, P.Maritaz, D.Pineihro, P.Poileux,etc…

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island Physics Prototype – global presentation VME HCAL Movable table Silicon wafer Electronics Beam monitoring Movable table ECAL Detector slab 1 st structure (1.4mm of W plates) 2 nd structure (2×1.4mm of W plates) 3 rd structure (3×1.4mm of W plates) 370 mm 180 mm from Marc Anduze ( LLR ) The CALICE-ECAL physics prototype beam

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The first 3 tungsten plates measured at LLR measured at LLR It confirms the good quality of the plates As measured at IHEP and ITEP. Assuming no strong Geometrical correlation Like for the first 3 plates Marginal impact on the energy resolution for single particle* * Following MOKKA and GEANT4 Tungsten metrology

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island Front End electronics (CFi / W) structure type H PCB Silicon wafer Prototype configuration : using PCB solution + external Frond End Shielding Detector slab schematic view

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island Tungsten 1.4 mm thick Carbon fiber Structure type H Piece of the first structure Structure W-Cfi 5 alveoli (10 layers)

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island Structure type H with its aluminum shielding

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island DONE  The production of a sample of 40 tungsten plates starts. it corresponds to the first technological test and first stack of prototype  Production of the final set of masks for the silicon wafers and successful processing of the first 25 silicon wafers (DC coupled) at MSU  The design of the front-end chip is fixed. First batch for test in September. Fall 2002  Processing and test of about 100 silicon wafers (PRAGUE, MSU, LLR)  Final submission of the VFE chip for the prototype (LAL)  Construction of the first 1/3 of the W-CFi structure of the prototype (LLR) Summary on the ECAL prototype

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island Pad Silicon wafer PCB Aluminium Cooling tube VFE chip 1.3 mm 1.0 mm 0.5 mm Thermal contact Gluing for electrical contact AC coupling elements ? power line command line signal out A design with electronics inside detector R&D on the new design of the full scale detector

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island  A priori, all processes are uncorrelated (Si wafer, VFE chip, PCB,...) we could expect a good Industrial Yield  A priori, all processes are (quasi-)industrial  The mounting of the detector slab is a classical job for electronics industrial  Probably easier access to VFE board (not so trivial argument)  Technically, There are interesting challenges, BUT there are no orders of magnitude to gain  Almost feasible today  What is the behaviour of a VFE chip when a 400 GeV e.m. Shower goes through ??  Thermal studies to design of a ``realistic’’ cooling system Advantages Drawbacks Advantages and drawbacks

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island 1 – Analytic calculation SPICE 2 – First simple test with SPICE software SPICE 3 – A PCB prototype to validate SPICE SAMCEF 4 – Very small grid size with SAMCEF software 5 - ``Realistic’’ PCB with cooling circuit SAMCEF-SPICE validation Thermal studies Participation at LLR M.Anduze, J.Badier, A.Karar ….

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island What we simulate The analytic result for 6 ``VFE chips’’ Note the asymmetric Temperature peak Heat points (VFE chip) One of the 7 points of measurements Simulated cooling tube PCB 1mm thick

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The way to simulate SPICE with SPICE The results Point numbers Degree K Here different level of cooling on the border is applied V=Temperature I=Caloric quantity

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The time constant Is very large  Average calculation Is good enough SPICE REAL PROTO. The prototype is not exactly simulated since it is not inside a W-Cfi structure… And other ``small’’ differences It will be improved in the future FIRST TEST on the time constant

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island SPICE  SPICE is tested with the PCB prototype and use for the test of the dynamic of the system SPICE  When SPICE is validated, it is used to give the condition SAMCEF at the limit for a more sophisticated software : SAMCEF SPICE  Try to find reasonable agreement between SPICE SAMCEF and SAMCEF and the measurement with the prototype SAMCEF  Use SAMCEF for the simulation of the full scale detector - heat source not pointlike - different caloric capacitance (PCB,VFE,strips,…) - very small grid size The proposed strategy

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island First simulation with SAMCEF SAMCEF software Note the asymmetric behavior

CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island New design of the detector slab  Thermal studies begin ….  The behavior of the VFE with 400 GeV e.m. shower ??? Volunteers !!! The prototype  More or less in the scheduled time (ready for beam at the end of 2003)  Carbon-fiber and tungsten have good behavior … Conclusion Beam 5<P<50 GeV/c Pion/electron beam in 2004 –2005 ????? Same problem for SLAC/Oregon design !!!