Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Quality Assurance of Silicon Strip Detectors and Monitoring of Manufacturing Process Thomas Bergauer Institute f. High Energy Physics HEPHY, Vienna SiLC.
Silicon Preshower for the CMS: BARC Participation
sTGC for ATLAS Small Wheel upgrade
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Trakcing systems with Silicon with special reference to ATLAS-SCT Some generalities about tracking Special requirements in LHC environments About silicon.
November 3-8, 2002D. Bortoletto - Vertex Silicon Sensors for CMS Daniela Bortoletto Purdue University Grad students: Kim Giolo, Amit Roy, Seunghee.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
20th RD50 Workshop (Bari)1 G. PellegriniInstituto de Microelectrónica de Barcelona G. Pellegrini, C. Fleta, M. Lozano, D. Quirion, Ivan Vila, F. Muñoz.
Sensor overview Ulrich Heintz Brown University, Providence, RI 6/18/2015U. Heintz - Sensor Overview 1.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
P3MD Labs Introduction to the facilities of the Purdue Experimental Particle Physics research groups.
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
8/22/01Marina Artuso - Pixel Sensor Meeting - Aug Sensor R&D at Syracuse University Marina Artuso Chaouki Boulahouache Brian Gantz Paul Gelling.
Precision Dispensing Purdue takes advantage of the gantry’s precision by fixing a 150 micron inner diameter dispensing tip to an EFD dispensing pressure.
1 The 3-rd Work Meeting of the CBM -MPD STS Consortium “Technical challenges of the CBM and MPD Silicon Tracking Systems 2009” THE CABLES FOR THE CABLES.
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
1 Plans of Vienna SLHC Proposal Workshop 20. February 2008.
Medipix sensors included in MP wafers 2 To achieve good spatial resolution through efficient charge collection: Produced by Micron Semiconductor on n-in-p.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
2004/09/07 Junkichi Asai (RBRC) (Kieran Boyle (SBU))
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Examples and disciptions for measurements On pixel and strip sensors.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Summary of Si Strip Group QA Preparation & Schedule and Costs Abhay Deshpande Stony Brook University PHENIX VTX Detector Readiness Review Brookhaven National.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Foundry Characteristics
DOE Rev of Run IIb Sep 24-26, Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University Frank Lehner University.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
SOME COMMENTS Ulrich Heintz Brown University 7/23/2015Ulrich Heintz - HF plan 1.
Report on CMS 3D sensor tests Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
Lehman Review April 2000 D. Bortoletto 1 Forward Pixel Sensors Daniela Bortoletto Purdue University US CMS DOE/NSF Review April 12,2000 Progress.
Phase 2 Tracker Meeting 6/19/2014 Ron Lipton
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
R. Lipton Vertex ‘98 Santorini, Greece The D0 Silicon Microstrip Tracker (D0SMT) Outline  Design  Detector Studies Coupling capacitors Radiation Damage.
Procurement Readiness Review : Detector Fabrication, Qualification & Assembly at India M D Ghodgaonkar Electronics Division, BARC, India.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Studies on n and p-type MCz and FZ structures of the SMART Collaboration irradiated at fluences from 1.0 E+14 to 5.6E+15 p cm -2 RD50 Trento Workshop ITC-IRST.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
B01.2- Outer Tracker Gino Bolla, L3 Manager, January 31, Director's Progress Review – Outer Tracker.
25 April 2013 Thomas Bergauer (HEPHY Vienna) Components and ladder quality control and testing procedures Belle II Vienna-Pisa meeting.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Karlsruhe probe equipment and QA proposals/expertise
HV/HR CMOS in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Huffman, Jaya John, Nickerson, Placket, Shipsey, Vigani.
Advanced hybrid detectors in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Placket, Shipsey.
Highlights of Atlas Upgrade Week, March 2011
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
SuperB SVT Silicon Sensor Requirements
Design and fabrication of Endcap prototype sensors (petalet)
Sidet Facilities A snap shot of space and equipment at Sidet and their current use Projected future uses and upgrades Hogan Nguyen, Fermilab May 22nd 2007.
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented to the Tracker Management board in 3 weeks – Intentions – not commitments Has the vision evolved since CalTech? – How does the MREFC play into the balance between pixels and OT? Can OT centers also do pixels? – Does the HGC decision affect production plans? Many HGC operations share infrastructure with the tracker Expect Fermilab to work on HGC modules – What infrastructure costs can be paid by the project/local institutions?

build and test a fraction of the PS modules (~4000). Develop assembly techniques Test sensors Develop and model sensor designs Design flat barrel section Participating US Institutions – Brown University – Cornell University – Davis – Fermilab – Rutgers University – University of Rochester – Santa Barbara – Princeton University US interests

1.develop and build the support and cooling structure for the flat part of the barrel 2.and in the assembly of a number of the PS modules. – The PS modules consist of a strip sensor and a pixel sensor. – The strip sensor has two rows of AC coupled strip with a length of 2.5 cm and a pitch of 100 m. It is bonded on either side to a hybrid with a row of short-strip ASIC (SSA) readout chips. – The pixel sensor has 32 rows of macro-pixels of length 1.5 mm and pitch 100 m. The macro-pixel ASIC (MPA) readout chips will be bump-bonded directly onto the sensor to form a macro-pixel-sub-assembly (MaPSA). – The module assembly has to provide for precise alignment of the two sensors relative to each other and supply power and cooling to the sensors and readout chips. Our interests in OT modules

PS Module Participation plans TaskBrownCornellDavisFermilabSanta BarbaraRochesterRutgersPrinceton Module Constrtcution Tasks 1Sensors 1.1Sensor Quality ControlXX 1.2Process Quality ControlXX 1.3Irradiation TestsXXX 2Hybrids 2.1FE or Service Hybrid QAX? 3Mechanics 3.1Al-CF production(vendor contact) and QAX 3.2Al-CF coatingX? 3.3CF production (vendor contact) and QAX? 4MaPSA 4.1Vendor Contact and QAXXX? 5Assembly 5.1GluingXXXXXXXx 5.2verification of geometrical precisionXXXXXXx 5.3WirebondingXXXX?XXx 5.4QA assembled modules (connectivity etc)XXXX?XXx 5.6Full QA w/ extended operation & thermal cyclesXXXXXXx 5.7Transport EquipmentXX? 6Mechanical Structures 7Tracker IntegrationXX XX?XX 8Backend Electronics/L1 Track Trigger X X X Not a productionassembly w/w/Rutgers centerCornell

Centers and equipment R. Lipton5 Test system CMM Auto. Probe station Assembly fixtures Auto Wirebonder Cooling system Burn-in system Gantry Hybrid TestingX Sensor pkg assembly X X MPA testingX X Hybrid assembly to baseX XX-X ? Sensor assembly to baseXX XXXXX Assembly to rodsXX X XX

Wire bonder : ~$200K Pull tester. e.g. Dage 4000: ~10K$ Microscope for optical inspection. Microscope with LED display for quick viewing. ~5K$ Glue dispensing robot. ~20K$ Gantry style robot. Aerotech AGS10000 for TOB construction. ~100K$ Automatic Probe station with cold chuck: ~150K$ Camera with LabVIEW Vision system for robot. ~$20k Keithley 237 voltage sources. Standard lab power supplies. ~10-20K$ Vacuum oven: ~20K$ Dry storage units with grounding capability. ~10-20K$ Anti-static protection system. ~5-10K$ CMM ??? Cooling system Burn-in system Test systems Clean Room? Estimate: 400K$ + wire bonder (200K$) + clean room Infrastructure: module assembly

Sensor tests HPK wants to reduce the level of probing Measure IV/CV curves for ~20% of sensors Carry out strip measurements (w/o interstrip) for 5% of sensors Carry out full strip testing (including interstrip) for 1% of sensors Perform radiation testing on diodes early in the production to control the material properties – Irradiate mini-sensors and test-structures to 150% maximum fluence during production, Measure before and after irradiation – Bias voltage up to 1000V. Perform measurements with sensors at -20°C Establish strong feedback between module and sensor testing 3/1/2015Demina/Heintz - Caltech7

Infrastructure: sensors Clean room (class 100,000 or better) Basic equipment – Source meter ≥ 1000V, Imax ≥ 1mA – pAmmeter (2 or 3) – LCR-Meter 100Hz ≤ f ≤ 1MHz – Voltage source – Temperature controlled vacuum chuck (~20°C) for sensors up to 16 cm long – Light-tight and humidity controlled metallic enclosure – Probes, vacuum tweezers, microscope – Humidity controlled storage Additional equipment for strip measurements – automatic probe station (up to 2032 strips, 5 parameters each) – XYZ-stage (accuracy ~5µm) – Switching-matrix including HV switching – Long-term setup to monitor leakage current at 500 V for 48h Estimate: 250K$ + wire bonder (200K$) + clean room 2/27/2015Ulrich Heintz - Caltech USCMS meeting8

Institutional Interests R&D TaskBrownCornellDavisFermilab Santa BarbaraRochesterRutgersPrinceton R&D Tasks Module PrototypingXXXXXX Development of assembly proceduresXXXXX Development of testing proceduresXXX Development of production infrastructureXXXXX Support DevelopmentXX Mechanical and thermal testsXXXX Readout and test electronicsXXX Beam testsXXXXXXXX

Novati Wafer Tests We performed initial tests on the Novati 8” sensor wafers 5 Wafers received – 2 x 725 micron p-spray + p-stop – 1 x 725 micron p-stop only – 2 x 500 micron p-spray + p-stop We do not expect to be able to deplete the 725 micron thick devices

Initial VI Wafer 4 – 725 micron – first VI

Breakdown seems to decrease after first measurement First Vi Next 2

But it is all from the guard

CV- Depletes around 400 V W9-TS1-SD

W9_TS4_LD

Resistivity Neff Calc mup=502cm2/Vs eps=11.9 eps0= E-14F/cm D0.05cm q E-19 Vdep400V Neff2.10E+12 Resistivity5.91E+03Ohm-cm