Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.

Slides:



Advertisements
Similar presentations
Overview What is the National ITS Architecture? User Services
Advertisements

Wade E. Kline, AICP Community Development Planner.
San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.
SAN DIEGO I-15 INTEGRATED CORRIDOR MANAGEMENT PROJECT Alex Estrella, SANDAG.
Integrated Corridor Management Initiative Overview Brian Cronin Congestion Program Manager ITS Joint Program Office.
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
CALTRANS’ TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS CTP 2040 PAC 1 Kris Kuhl Assistant Division Chief, Division of Traffic Operations 4/15/2014 CREATING.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar July Audio: , passcode
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
MTF Rail Development Forum
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
1 New Emergency Transportation Operations Resources Nancy Houston Booz Allen Hamilton.
1 Open Library Environment Designing technology for the way libraries really work December 8, 2008 ~ CNI, Washington DC Lynne O’Brien Director, Academic.
USDOT Intelligent Transportation Systems – Joint Program Office Mac Lister Program Manager Knowledge and Technology Transfer ITS Joint Program Office U.S.
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Practical Design in ODOT Roadway Conference April 13, 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
Integrated Corridor Management (ICM)
Montgomery County Maryland I-270 Integrated Corridor Management Project Tom Jacobs, University of Maryland Center for Advanced Transportation Technology.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
FHWA Office of Operations Research and Development and American Association of State Highway and Transportation Officials (AASHTO) AASHTO National Connected.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Minnesota I-394 ICM Corridor. What is Integrated Corridor Management? Independent Network of Transportation Systems –Freeways, including managed lanes.
I-15 Integrated Corridor Management Project I-15 Integrated Corridor Management Project MICM Workshop December 2007.
Mobility Services for All Americans (MSAA) Yehuda Gross ITS Mid-West State Chapter February 7, 2006.
Connectivity & Mobility
V ehicle I nfrastructure I ntegration Jeffrey F. Paniati Associate Administrator for Operations and Acting Program Manager for ITS Joint Program Office.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Connected Vehicle Program – Dynamic Mobility Applications Highlights for Tech Scan Scrum.
Presented to presented by Cambridge Systematics, Inc. WVDOT Planning Guidebook Interview & Development Process 2015 WVDOT/MPO/FHWA Planning Conference.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Traffic Monitoring Guide 2012 Update May 9, 2013 DBP Roadway Transportation Data Business Plan presented to Data Palooza U.S. Department of Transportation.
Guidance and Support of ITS Programs Michael Freitas May 2000 US Department of Transportation Federal Highway Administration.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
MIT - October 1, 2004Jeffrey D. Ensor 1 RSTP Planning for Operations Jeffrey D. Ensor Malaysia Transport Group M.I.T. October 1, 2004.
U.S. Department of Transportation Intelligent Transportation Systems Program 2005 Update Jeffrey F. Paniati Associate Administrator for Operations Acting.
Security and the National ITS Architecture ITS America 2003 Session 19: The State of the Practice: ITS and Homeland Security May 19, 2003 Minneapolis,
FHWA Perspectives on VII Pat Kennedy Road Weather Management Program Federal Highway Administration VII Weather Applications Workshop II June 21, 2006.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
Draft 2008 Congestion Management Process (CMP) Technical Report Andrew J. Meese COG/TPB Staff TPB Technical Committee June 6, 2008 Item # 8.
Context and Priorities April 9,  Why FHWA Focuses on Improving Operations  FHWA Operations Program Areas  Key Current Program Priorities.
1 based on Federal Highway Administration Capability Maturity Model Workshops Transportation Systems Management and Operations (TSM&O) Performance Measurement.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation.
ITS Architecture Development in a Regional Planning Context Central Ohio Case Study Erika Witzke Principal Engineer Mid-Ohio Regional Planning Commission.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
IntegratedCorridorManagement 1 Integrated Corridor Management Overview and Activities Jeff Lindley Director, Office of Transportation Management FHWA February.
Incorporating Connected/Automated Vehicles into the Transportation Planning Process November, 2015 Max Azizi US DOT.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Integrated Corridor Management (ICM) Brian P. Cronin, P.E.
Brian Cronin Federal Transit Administration ITSA Annual Conference May 4, 2005 Mobility Services for All Americans (MSAA) Foundation Research and Next.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
1 Clarus Clarus Nationwide Surface Transportation Weather Observing & Forecasting System Paul Pisano Team Leader Road Weather Management Office of Transportation.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
FHWA Update SHRP2 Implementation and Other Agency TSMO R&D Efforts Tracy Scriba, FHWA 12/8/15 1.
Pioneer ICM site in Seattle – SoDo Corridor Vinh Q. Dang, WSDOT.
1 USDOT Next Generation Initiative Laurie Flaherty EMS Division, NHTSA.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
Project Overview – Phase 1
Transportation Systems Management and Operations (TSM&O)
2017 Health care Preparedness and Response Draft Capabilities
Presentation transcript:

Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005

2 ITS Initiatives USDOT ITS program reoriented to focus on fewer, larger, higher-risk, high-payoff “major initiatives” Nine Major initiatives were approved by the Management Council Directly support USDOT’s goals of safety, mobility and global connectivity Integrated Corridor Management (ICM) is one of the major ITS initiatives started in 2004

3 Corridors Currently surface transportation systems are made up of several independent networks –Freeways, including managed lanes –Arterials –Bus Routes –Rail Transit Efforts to date to “reduce congestion” have focused on optimization of individual networks These adjacent network links overlay to form transportation corridors –Metropolitan areas contain several major corridors Corridors offer an opportunity to operate and optimize the entire corridor system as opposed to the individual networks

4 Integrated Corridor Management

5 Initial Definitions Corridor –A corridor is defined as a combination of discrete adjacent surface transportation networks (e.g., freeway, arterial, transit networks) that link the same major origins and destinations. Integrated Corridor Management (ICM) –Integrated corridor management is the coordination of individual network operations between adjacent facilities that creates an interconnected system capable of cross-network travel management.

6 Integrated Corridor Management Initiative Purpose –The initiative will demonstrate that ITS technologies can be used to efficiently and proactively manage the movement of people and goods in major transportation corridors by facilitating integration of the management of all the networks in a corridor. Goal –The goal of the Integrated Corridor Management Initiative is to provide the institutional guidance, operational capabilities, and ITS technical methods needed for effective Integrated Corridor Management Systems.

7 Integrated Corridor Management Initiative Vision –Improved mobility through integrated management of transportation assets – freeways, arterials, transit, managed lanes – in major transportation corridors in metropolitan areas Approach –Address Institutional, operational, and technical barriers to successful integrated corridor management –Demonstrate how mobility, safety and productivity can be increased in major corridors by Efficient, effective, proactive use of ITS technology Improved use of real-time data sharing Implementing demand management strategies

8 Missing Integration Institutional Integration –Lack of operational capability and technology that supports cross network distribution of responsibilities and sharing of control Operational Integration –Lack of integrated cross network operational strategies and analysis capabilities Technical Integration –Lack of cross network device-to-device data, communication, and procedure integration

9 ICM Program Plan

10 ICM Roadmap: Phase 1

11 Stakeholder Involvement Stakeholder Work Group –20 representatives Request For Information (RFI) –Gather information on corridor management activities –Study to identify needs –18 Responses Stakeholder Workshops –June 22 and 29 (one workshop, two locations) ITSA –Website –Conference Model Deployment Candidate Sites

12 Model Deployment Site Selection Approach Two-phased Approach: –Select candidate sites –Select model deployment site from candidate sites

13 Phase 1 – Foundational Research Team: Siemens ITS, TransCore, Dunn, SAIC, University of Virginia, Transystems, Howard / Stein-Hudson Major Activities –Program management & stakeholder meetings –Definitions, criteria for delineating a corridor, relationship to regional ITS –Generic Concept of Operations for ICMS –ICM system requirements –Document successful local integration efforts –Identify corridor types, operational approaches / strategies, analysis tools –Analyze associated operational, institutional, & technical integration issues –Develop ICM development feasibility report / briefing –Assist with MDI effort

14 Phase 1 Activities To Date Definitions –“corridor” –“integrated corridor management” Concepts for Delineating Corridor Boundaries Relationship Between Corridor & Regional Management Outline for Generic Concept of Operations Stakeholder Meetings Other Ongoing Activities –Review RFI responses, draft generic Con Ops, corridor types and strategies / operational approaches, simulation modeling

15 ICMS Concept of Operations “Concept of Operations” is Integral Part of Systems Engineering Process –High-level description of what the major system capabilities will be in ICM ICMS Con Ops a Formal Document Providing a User-Oriented Vision of ICM System –Can be understood by a wide variety of stakeholders (different operational & technical experience) –Engage stakeholders; soliciting input & feedback Generic ICMS Con Ops Will Serve as Template for Each MDI Candidate to Develop Their Corridor – Specific Con Ops

16 ICMS Concept of Operations Outline Based on FHWA Document “Developing and Using a Concept of Operations in Transportation Management Systems” –Overlap in content between sections 1 – Scope5 – Operational Needs 2 – References6 – System Overview 3 – User Oriented Operational Description 7 – Operational & Support Environment 4 – Relationship of ICMS to Regional ITS 8 – Operational Scenarios

17 Con Ops Operational Scenarios Normal operations (recurring congestion – Traffic and Transit) Scheduled events (special event / work zone) Evacuation Roadway, Transit, and Rail incidents Multiple simultaneous scenarios Others (as identified by stakeholders)

18 ICM Contacts and Information Mike Freitas, DOT JPO John Harding, FHWA Office of Operations Dale Thompson, FHWA Office of Operations R&D ICM Website: