1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Mark Reichanadter LCLS FAC October 29-31, 2007 Report to the LCLS Facilities Advisory Committee Project Management Project.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
M. Reichanadter LCLS Project June 2008 FAC Meeting Report to the LCLS Facilities Advisory Committee Project Management.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April/May 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Support Update Diane Hatton, Project Support Division Director NSLS-II Project Advisory Committee Meeting May 24-25,
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Beamlines Qun Shen NSLS-II Experimental Facilities Director NSLS-II Project Advisory Committee Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II Project Advisory Committee Meeting December.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
1 BROOKHAVEN SCIENCE ASSOCIATES Installation & Integrated Testing Status & Plans Gregory Fries, ASD Project Engineer 9 th ASAC meeting for NSLS-II Project.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Anthony Indelicato DOE-Princeton Site Office May 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the NSTX.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – December 2012.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
Anthony Indelicato DOE-Princeton Site Office February 2014 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – August 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Getting the NSLS-II Accelerator ‘on-line’ Erik Johnson, Steve Hoey, Ferdinand Willeke NSLS-II PAC Meeting December 10-11,
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April 2013.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Ferdinand Willeke Director, NSLS-II Accelerator Systems NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Project Management W. J. Foyt
SmartMeterTM Steering Committee Update – September 2012
Management Breakout: MREFC Budget Summary Victor L
SmartMeterTM Steering Committee Update – March 2013
SmartMeterTM Steering Committee Update – July 2012
SmartMeterTM Steering Committee Update – February 2013
SmartMeterTM Steering Committee Update – November 2012
LCLS Project Management
Details supporting the increase
DOE Review of the LCLS Project
Project Management Issues John N. Galayda, SLAC April 24, 2002
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
DOE Mini-Review of the LCLS Project
DOE Status Meeting of the LCLS Project
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Cost, Schedule, & Project Performance Comprehensive EAC Risk Update Conclusions

3 BROOKHAVEN SCIENCE ASSOCIATES Cost Baseline TPC$ 912 M Baseline Cost (Planned work)$ 828 M Contingency $ 84 M Completed work (Feb ‘12) $597M (72% complete) Committed work-to-go$72M Uncommitted work-to-go$159M Remaining work ($231M) Contingency ($84M): 36% of remaining work 53% of uncommitted work-to-go

4 BROOKHAVEN SCIENCE ASSOCIATES Cost Baseline $109M Contingency utilization since CD-2 approval  $33M for additional labor (15% increase from CD-2 Baseline, $225M)  $40M for Materials & Services (8% increase from CD-2 Baseline, $494M)  $36M for scope enhancements/additions Cost performance:12% ($73M/$597M) over baseline plan ($M) WBS CD-2 (Nov ‘07) Dec ‘09 Baseline Last PAC (Dec ‘10) Current Baseline (Feb ‘12) Change since Dec ‘ Project Management R&D and Conceptual Design Accelerator Systems Experimental Facilities Conventional Facilities Pre-Operations Grand Totals:

5 BROOKHAVEN SCIENCE ASSOCIATES Contingency spending history (Mar ‘08 – Feb ‘12) ($K) total (per month)w/o scope addition (per month) 3/08-2/12 $109M ($2.2M)$73M ($1.5M) FY2008 $12M ($1.5M) $5M ($0.6M) FY2009 $17M ($1.4M)$17M ($1.4M) FY2010 $33M ($2.7M)$20M ($1.7M) FY2011 $39M ($3.3M)$23M ($1.9M) FY2012 $7M ($1.4M) $7M ($1.4M) Spending category: labor/space $33M (30%) M&S$40M (37%) scope additions $36M (33%)

6 BROOKHAVEN SCIENCE ASSOCIATES Schedule Float & Critical Path Critical Path: through Accelerator installation & commissioning 35mm Dipole magnet production delivery  girder assembly/installation  Storage Ring commissioning without ID  SR integrated test with ID scope beyond KPP (“schedule contingency”) Commission SR w/o ID June ‘13 – Oct ’13Met KPP for accelerator systems Install ID Nov ‘13 – Dec ’13 Commission SR w/ ID Jan ’14 – Apr ’14 Early Project Completion, June 2014 (Lv 1 Milestone) Currently projected early completion day is April 2014 Baseline Level-1 milestone date with built-in schedule float (~2 months) –“Spent” 7 weeks schedule float over past 33 months (<3% increase) CD-4, Start of Operations, June months after the projected early completion date 6 month extra credit activity

7 BROOKHAVEN SCIENCE ASSOCIATES Sectional commissioning without beam CD-2 Baseline schedule Current baseline Current projection (schedule EAC) Magnet Production & Installation Schedule Met KPP for Accelerator Extra credit activities

8 BROOKHAVEN SCIENCE ASSOCIATES Cost, Schedule & % completion Overall project : 72% complete as of Feb ‘12 with CPI = 1.01 & SPI = 0.96 Impressive amount of work ($238M) completed since last PAC meeting was 46% complete at Jan 2011 and now 72% at Feb 2012 (w/ additional LOB’s & other scope additions) We are maintaining our momentum into 2012 Expect to complete ~90% of current baseline by January 2013

9 BROOKHAVEN SCIENCE ASSOCIATES CPI = 1.01 SPI = 0.96 We are now near the shoulder

10 BROOKHAVEN SCIENCE ASSOCIATES Monthly Burn Rate Apr 2013 ($M) Cumulative ($M) Monthly

11 BROOKHAVEN SCIENCE ASSOCIATES Estimate at Completion (EAC) General Principles Aggressively pursue accurate EAC information as a management tool Estimates that are good projections (~50%<probability<~90%) but still can be managed Managing to the baseline. Contingency spending is not a routine solution 2011 Annual comprehensive assessment conducted over Sep – Dec ’11 Review of all activities through project completion date, especially labor estimate Bottom line: EAC was $24.4M over BAC (~$13M for Accelerator Systems) $13.4MM&S $7.7MTEC labor(~31 FTE-year) $3.3MOPC labor(~13 FTE-year) Risk was $30M, including $12.2M for additional labor $17.8MM&S $5.5MTEC labor(~22 FTE-year) $6.7MOPC labor(~27 FTE-year) 44 FTE EAC $24.4M Risk $30.0M 49 FTE 93 Total FTEs

12 BROOKHAVEN SCIENCE ASSOCIATES Comprehensive EAC (Dec 2011) WBSDescription($K)WBSDescription($K) 1.1 Project management labor, space and utilities 1, DW raw material cost increase 2, Design room equipment CPMU R&D Accelerator Physics additional Computers IVU overrun due to material price increase Cost increase for booster main power supply ID measurement & installation labor corr Booster rf cavities Vacc fac. Clean. Set-up cost overrun Transport line installation M&S and labor management budget increase Injector survey missing M&S and labor XPD Laue Monochromater cost increase Additional labor for injector process water sys HXN optics package contract award Injector installation labor short fall Phasing magnet for EPU's for CSX Magnet schedule mitigations 1, LOB std. lab equipment pack (3x) Labor for magnet schedule mitigation 1, Under estimated labor for beamline1, Magnet 2nd source contracts AE Support for LOB 4 & Magnet cooling water manifords Ring Building construction field changes1, Under-run in vacuum chamber contracts -1, Resolution of ESH issues from BOREs Power supply system labor and M&S overrun 1, Additional furnatures for larger LOBs (1&3) Increase in optical monitoring LOB construction Field Changes Frontend cost saving LOB construction safety incentive Additional labor and M&S for SR Survey Wireless communication repeaters SR utility labor and contract overruns Network infrastructure for LOB 4& Additional labor for girder installation Additional manpower for accelerator pre-ops2, PPS interlock materials and labor Additional manpower for beamline pre-ops1,242 EAC Total $24.4M ~ $4M PCRs approved since then

13 BROOKHAVEN SCIENCE ASSOCIATES Staffing 20 Staff at 9/06 80 Staff at 9/ Staff at 9/08 20 Staff at 9/06 80 Staff at 9/ Staff at 9/08 Increase in staffing for accelerator, beamline engineering, construction management (oversight, ESH, QA) and project support (procurement, HR, project control) Sufficient staffing allocated for all activities through FY12 Accelerator Systems increased from 554 at CD-2 to 717 FTE now (>29% increase) 35% increase (90 FTE) for remaining years captured in EAC and Risks Continue to evaluate details in commissioning & pre-ops Total Cumulative FTEs: CD-2 Baseline 1,188 today 1,467 (>23% increase) Allocated in EAC + Risk ~35% increase

14 BROOKHAVEN SCIENCE ASSOCIATES Risk Update Risk RatingAug 2008 Apr 2009 Jan 2010 Oct 2010 Jun 2011 Mar 2012 High Medium Low Retired Recent Updates (ratings or $ estimates reduced) SR magnet production Insertion Device production Beamline enclosures & controls system Construction safety To be retired soon: Changes in requirements for conventional facilities Interface of 2 contractors on Ring Building site

15 BROOKHAVEN SCIENCE ASSOCIATES Summary of Risks - Mar 2012 Risks risk rating overall rating estimated retire date ID#WBSDescription cost ($K) costscheduletechnical ESH Construction Safety$1,000LMn/aLJun-14 PMG additional labor$1,000Ln/a LJun-13 PMG additional space charge$3,000Mn/a MJun-13 ASD unexpected difficulties with dynamic aperture$200 LLLLOct-13 ASD Linac turn key procurement$250 LLLLApr-12 ASD Booster turn key procurement$500LMLLAug-12 ASD SR magnet production$500LMLLAug-12 ASD SR vacuum chamber production$0n/aLLLApr-12 ASD SR RF cavity production$1,000 LMMMOct-13 ASD Insertion device production$500 LMLLNov-12 ASD BPM electronics$200LLLLDec-12 ASD SR installation - underestimated labor$500LMLLDec-12 XFD Enclosures, Utilities, Std Cmpnts, PPS & EPS$920LLLLJun-12 Optics$700LMMMSep-12 Endstations$3,800MMMHSep-12 Controls$180LLLLJun-12 Labor$4,500MLLMOct-12 CFD Changes in requirements for conventional facilities$200LLLLJun-12 CFD Field changes for conventional construction$2,000MLLMDec-12 CFD Interface of 2 general contractors on ring bldg site$200LLn/aLApr-12 OPS-011.6Under estimated pre-ops labor$6,685HLLHJun-13 subtotal$27,835

16 BROOKHAVEN SCIENCE ASSOCIATES Risk & Contingency History Ring Building contract Enlarged LOBs & 500 mA capability Risk was 66% of contingency Risk is 33% of contingency LOB 4&5 shells

17 BROOKHAVEN SCIENCE ASSOCIATES Contingency Tracking To Date Now ~36% Jan 2013 > 90%

18 BROOKHAVEN SCIENCE ASSOCIATES Cost Baseline, Contingency, and Risks Burdened & Escalated Planned work $828M Completed work $597M Committed work-to-go$72M Uncommitted work-to-go$159M EAC ($20M) + Risks ($28M)$48M 25% of Uncommitted Work-to-go$40M Available Contingency $84M

19 BROOKHAVEN SCIENCE ASSOCIATES Pre-ops activities start to ramp up in 2012 Expect to need large fraction of $10M OPC contingency to cover additional labor resource needed for integrated testing in FY12, FY13 and FY14 We requested to DOE to pull-forward most of $5M OPC from FY15 to FY14 Significant risk for delay in project completion date without pull-forward of FY15 funding Project Funding

20 BROOKHAVEN SCIENCE ASSOCIATES Overall Performance On Schedule and On Budget wrt Baseline Excellent technical, cost & schedule performance to date Maintaining sound cost baseline with healthy remaining contingency Aggressively driven internal schedule Continue to execute technically limited schedule since June 2009 Negative schedule variances in specific areas: well understood and actively managed Lost fair amount of built-in schedule float for accelerator installation and beamline component procurement Risks and EAC well understood, tracked and managed A number of major risks (technical, cost & schedule) continue to retire or reduce ratings We are in the final home stretch of peak activity period with much excitement ahead