Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.

Slides:



Advertisements
Similar presentations
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Advertisements

Breaking the Static Barrier: Building Regional Support for Implementation of Dynamic Traffic Assignment in Long-Range Planning Processes TRB Planning Applications.
Wade E. Kline, AICP Community Development Planner.
SAN DIEGO I-15 INTEGRATED CORRIDOR MANAGEMENT PROJECT Alex Estrella, SANDAG.
Integrated Corridor Management Initiative Overview Brian Cronin Congestion Program Manager ITS Joint Program Office.
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
CALTRANS’ TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS CTP 2040 PAC 1 Kris Kuhl Assistant Division Chief, Division of Traffic Operations 4/15/2014 CREATING.
Operations / ITS Provisions in SAFETEA-LU What’s in There and What’s Not Jeff Lindley Operations / ITS Discipline Meeting August 16, 2005.
Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar July Audio: , passcode
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
Electronic Freight Manifest Initiative ITS JPO Lead: Kate Hartman Technical Lead: Mike Onder, Office of Freight Management and Operations.
Mobility Services for All Americans Initiative ITS JPO Lead: Yehuda Gross Technical Lead: Brian Cronin/William Wiggins, FTA APTS Division.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
Integrated Corridor Management (ICM)
Montgomery County Maryland I-270 Integrated Corridor Management Project Tom Jacobs, University of Maryland Center for Advanced Transportation Technology.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
Minnesota I-394 ICM Corridor. What is Integrated Corridor Management? Independent Network of Transportation Systems –Freeways, including managed lanes.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
Connected Vehicle Program – Dynamic Mobility Applications Highlights for Tech Scan Scrum.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Guidance and Support of ITS Programs Michael Freitas May 2000 US Department of Transportation Federal Highway Administration.
Transit Signal Priority (TSP): Deployment Issues and R&D Needs as Identified by Practitioners Hallie Smith Brendon Hemily.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
VII Applications Mike Schagrin, VII Applications Manager ITS Joint Program Office Research & Innovative Technology Administration USDOT Mike Schagrin,
Context and Priorities April 9,  Why FHWA Focuses on Improving Operations  FHWA Operations Program Areas  Key Current Program Priorities.
1 based on Federal Highway Administration Capability Maturity Model Workshops Transportation Systems Management and Operations (TSM&O) Performance Measurement.
Kentucky’s Assistive Technology Outreach: Access Across the Commonwealth Laura Schluter Strickland, Ed.D., OTR/L Raleigh, NC February 14, 2007.
VII Applications Mike Schagrin, VII Applications Manager ITS Joint Program Office Research & Innovative Technology Administration USDOT Mike Schagrin,
1 RANKING OF FUNCTIONAL REQUIREMENTS/ TOPIC AREAS FOR NEEDED RESEARCH BY THE TRB TRAFFIC SIGNAL SYSTEMS COMMITTEE JULY 21, 2002 MID-YEAR MEETING IN SALT.
Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation.
SHRP2 Reliability Implementation | February 2013 When Research Meets the Road Reliability Focus Area February 7, 2013.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Emergency Transportation Operations Initiative ITS JPO Lead: Linda Dodge Technical Lead: Vince Pearce, Office of Transportation Operations.
IntegratedCorridorManagement 1 Integrated Corridor Management Overview and Activities Jeff Lindley Director, Office of Transportation Management FHWA February.
Cooperative Intersection Collision Avoidance Initiative ITS JPO Lead: Mike Schagrin Technical Lead: Morris Oliver, Office of Safety.
Incorporating Connected/Automated Vehicles into the Transportation Planning Process November, 2015 Max Azizi US DOT.
Integrated Corridor Management (ICM) Brian P. Cronin, P.E.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
Technology Subcommittee November Topical Outline Technology Subcommittee Technology Subcommittee RoleRole Work PlanWork Plan ActivitiesActivities.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
FHWA Update SHRP2 Implementation and Other Agency TSMO R&D Efforts Tracy Scriba, FHWA 12/8/15 1.
Transportation Systems Management and Operations: Technology Solutions and Active Management Presenter Name Date AGENCY LOGO Photo: © Shutterstock.com/iofoto.
Pioneer ICM site in Seattle – SoDo Corridor Vinh Q. Dang, WSDOT.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
Melissa Lance Operations Systems Manager July 16, 2015 Connected Vehicle Update National and Virginia Perspective.
Transportation leadership you can trust. presented to Third International Conference on Innovations in Travel Modeling presented by Thomas Rossi Cambridge.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
Project Overview – Phase 1
NHN member organizations
Item #8 Metropolitan Area Transportation Operations Coordination (MATOC) Program TPB Planning and Implementation Briefing May 21, 2008 Richard W Steeg,
Transportation Systems Management and Operations (TSM&O)
TSMO Program Plan Development
San Mateo Countywide Transportation Plan update
FHWA TSMO / SHRP2 Research
MODULE 2: TSMO Strategies
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
MODULE 2: TSMO Strategies
MODULE 11: Creating a TSMO Program Plan
Module 2: TSMO Strategies
Presentation transcript:

Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management

Integrated Corridor Management Initiative Background Currently surface transportation systems are made up of several independent networks  Freeways, including managed lanes  Arterials  Bus Routes  Rail Transit In reality each of these networks is made up of high volume links These parallel network links overlay to form transportation corridors Metropolitan areas contain several major corridors

Integrated Corridor Management Initiative Opportunity Efforts to date to “reduce congestion” have focused on optimization of individual networks No capability to respond to demand from other networks Integration across networks is critical in these high demand corridors Corridors offer an opportunity to operate and optimize the entire system as opposed to the individual networks

Integrated Corridor Management Initiative Integrated Corridor Management Systems: Examples Traffic signal systems that respond to large diversions of traffic from clogged freeways Demand responsive ramp metering systems integrated with local traffic signals Adaptive bus prioritization that responds to increased bus traffic during special events Traveler information systems that estimate and predict congestion over time and balance demand on networks

Integrated Corridor Management Initiative Goals Provide guidance to assist agencies in implementing Integrated Corridor Operations Create supporting analysis tools, approaches, and technical standards Demonstrate the value of Integrated Corridor Management

Integrated Corridor Management Initiative Milestone/End Product Widespread Integrated Corridor Operations, resulting in:  Efficient use of available network capacity  Reduced congestion and delays  More reliable travel

Integrated Corridor Management Initiative Detailed Roadmap

Integrated Corridor Management Initiative Program Plan/Approach The Initiative consists of four phases  Phase 1: Foundational Research  Phase 2: Operations and Systems Development  Phase 3: Model Deployment  Phase 4: Knowledge and Technology Transfer Duration of Initiative  FY04-FY10

Integrated Corridor Management Initiative Phase 1: Foundational Research Goal 1: Engage Multimodal Stakeholder Working Group  Action Candidate Model Deployment Sites will form core group Goal 2: Foundational Integration Studies  Actions Define Corridor Concept of Operations Document Successful Local Integration Efforts Identify Corridor Types and Operational Approaches Identify Operational Strategies and Analysis Tools Identify Functional Requirements Decision Point #1 – August 2005  Did we identify sufficient integration issues?  Are the issues workable?

Integrated Corridor Management Initiative Phase 2: Operations and Systems Development Goal 1:Organizational Integration  Action Develop cross network management systems that support distribution of responsibilities and sharing of control Goal 2: Operational Integration  Action Develop cross network operational strategies and analysis tools Goal 3: Technical Integration  Action Develop interfaces and integrated procedure to facilitate operational strategies, i.e. device-to-device integration Decision Point #2 – Sept  Do we have the knowledge and capabilities to support an effective model deployment?

Integrated Corridor Management Initiative Phase 3: Model Deployment Goal 1: Pre-Model Deployment Activity  Actions Pre-Model Deployment Workshop Prep for Candidate Sites Candidate Model Deployment Sites Selection Form core of stakeholder group Detailed examination of specific issues and problems Goal 2: Model Deployment  Actions Site selection and Implementation Apply integration techniques in real world setting Model Deployment Evaluation

Integrated Corridor Management Initiative Phase 4: Knowledge and Technology Transfer Goal 1: Pre-Model Deployment Knowledge and Technology Transfer  Action Support Candidate Sites preparing for Model Deployment Goal 2: Integrated Corridor Management Outreach, and Knowledge and Technology Transfer  Action Produce detailed Integrated Corridor Management implementation guidance to ensure areas with interest in deployment have the information and technology they need Includes management systems, operational strategies, tools, technology transfer, standards, and training

Integrated Corridor Management Initiative Summary Congestion is complex Corridor Management can make a difference Significant integration challenges must be addressed Opportunity to enhance our capabilities and improve performance