Expt. Area meeting – December 06 13.12.2006V. Bobillier1 Cabling installation status.

Slides:



Advertisements
Similar presentations
Install L2 Switch Head End CATV
Advertisements

1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Walls crates cables gas chambers electronics CERN adb.
Chapter 10 Optical fiber measuring instruments and testing single-mode fiber networks.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
LHCb EP/LBD V. Bobillier 1 Cables and chicane mock up What we would like to define or test with the mock up: if the installation (of both cable.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
1 Nexans Cabling Solutions Easy and reliable migration from fast to faster to100G.
Keeping Your World Connected.  Originally established in 1983 (AESP, Inc.)  Offices/Manufacturing: –United States (Miami, Pennsylvania) –Taiwan –China.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Ken Wyllie, CERN Upgrade infrastructure, Feb LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy.
Detector Cabling and Patching Rainer Schwemmer
HD Flex ™ Fiber Cabling System
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
CSC Endcap Muon Sorter Mezzanine Board Rice University July 4, 2014.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Keeping Your World Connected.  Originally established in 1983 (AESP, Inc.)  Offices/Manufacturing: –United States (Miami, Pennsylvania) –Taiwan –China.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Status of NA62 straw electronics Webs Covers Services Readout.
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Keeping Your World Connected.  Originally established in 1983 (AESP, Inc.)  Offices/Manufacturing: –United States (Miami, Pennsylvania) –Taiwan –China.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
Cabling for LHCb Upgrade
Update of MVD services and requests
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
WP02 PRR: Master Oscillator and RF Reference Distribution
Fiber Installation for RUN 3&4
ACS news Circulator TCU: control tests in progress All cavity racks
Pierluigi Paolucci - I.N.F.N. Naples
SPD cable length and rack location
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Reader Swap out Guide.
Rack and Interconnect Design in E-plan
Presentation transcript:

Expt. Area meeting – December V. Bobillier1 Cabling installation status

Expt. Area meeting – December V. Bobillier2 Cable trays installation status All long distance cable trays installed. Few additional cable trays in the Velo region will be finished by the end of the year hopefully. Cable trays to go from PP to Fixed Point for Calo and Muon nearly finished.

Expt. Area meeting – December V. Bobillier3 Long distance links (from PP to CH) current status (optical fiber) 4U Optical patch panels:Installed in all racks 1U TTCocs:Installed in all racks Data and L0 trig multi-ribbon cables:Pulled Cassettes and MPO plate installation, connection and testing:Starting soon TTC optical fiber cable installation and tests:Pulled, to be tested soon  Goal: Have the long distance optical links ready and tested end of this year.

Expt. Area meeting – December V. Bobillier4 Long distance links (from PP to CH) current status (copper) Connector installation and testing status (1):

Expt. Area meeting – December V. Bobillier5 Long distance links (from PP to CH) current status (copper) Connector installation and testing status (2):

Expt. Area meeting – December V. Bobillier6 Long distance links (from PP to CH) current status (copper) Still quite a lot of cables and connectors to be installed and tested

Expt. Area meeting – December V. Bobillier7 Long distance links main activity left January and February: RB84 side for Velo cable pulling In addition: All cables from patch panel racks to sub-detectors have to be installed…

Expt. Area meeting – December V. Bobillier8 Questions / Comments ???