MS, LG, XS PXL ladder tests at IPHC, May 1-7, 2012 1 1 1 Preliminary Ladder Testing Results (part 2) At IPHC MS, XS, LG.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

LBNL PIXEL IPHC 2009_06_LG1 Flex Cable Development The development of the flex cable for sensor readout and control is envisioned as a 4 stage process.
Electrical and thermal testing at Glasgow and Liverpool.
MS IPHC-LBL phone meeting, May 29, Ladder Testing at IPHC (Preliminary Results)
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
April 17, 2015Jonathan Valvano EE445M/EE380L.6 Recap RTOS Debugging/verification Lab 4 Application of RTOS Input sound, analog filter Digital filter, FFT.
STAR Pixel Detector Latch-up in Phase-1, SUZE and Mimosa22 Tests and analysis by Michal Szelezniak.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR PXL Sensors Overview.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Vertex 2002, Kailua-Kona Tobias Stockmanns, Universität Bonn1 Serial Powering of Pixel Modules T. Stockmanns, P. Fischer, O. Runolfsson and N.
Signal Quality Study with Triple Jumper Board and EC board to PP Cable December 2, 2004 Mitch Newcomer.
LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
MS, LG, XS PXL ladder tests at IPHC, May 1-7, Preliminary Ladder Testing Results At IPHC MS, XS, LG.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
Naming Convention HFT PIXEL 12-June-2009 Updated 03/08/2013 By LG to include row and column information for Ultimate sensors.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Sensor and ladder and dimensions dateChangeVersionwho 3/26/2013Updated with U2 fid positions 1.1LG.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
GigaTracker Working Group meeting Status of the GTK_carrier /03/2015.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
Sensor (0,0) (20235, 22725) PXL Ultimate sensor Diced Silicon Size mm x mm There is a uniform 15 um border around the sensor lithography 15.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
MAPS based vertex detector at STAR Michal Szelezniak 1 on behalf of: E. Anderssen 1, X. Dong 1, L. Greiner 1, J. Kapitan 2,S. Margetis 3, H. Matis 1, H.G.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
ULTIMATE: Preliminary Test Results IPHC-LBNL Phone Conference Outline  Ultimate test status  Analogue outputs (tested by Mathieu)  Pixel array + Discriminators.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
MS IPHC-LBL phone meeting, July 10, Ladder Testing at IPHC and LBL.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
1 10 th October 2007Luciano Musa Considerations on readout plane IC Area (die size) 1-2 mm 2 /channel Shaping amplifier 0.2 mm 2 ADC0.6 mm 2 (estimate)
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
C.V. S.W. T.S. L.G. X.S. M.S. IPHC-LBL meeting, January 22, Probe Test Results for 5 wafers of Ultimate-2 sensors Outline:  Yield and wafer.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
PXL timing There are two asynchronous systems. STAR PXL RDO L0 trigger L0 detectors Physics collision Trigger processing TCD distribution 1.5 us TBD RDO.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
M.S. February 25, Ultimate-2 sensors preliminary summary of LBL probe test results Introduction Wafer maps:  1 STD epi, full thickness  5.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
Investigating latchup in the PXL detector Outline: What is latchup? – the consequences and sources of latchup – techniques to reduce latchup sensitivity.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
LBNL Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
L. Greiner 1Project X Physics Study, Fermilab, June 18, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
Setup for automated measurements (parametrization) of ASD2 chip
Development of a Marx-Generator for the drive beam electron gun
Power Supply Development for JEDI Polarimeter Modules
Jan Soldat, Heidelberg University for the DSSC ASIC design groups
Leo Greiner, Eric Anderssen, Howard Matis,
BESIII EMC electronics
Spectrum Due to Modulation
COPING WITH INTERCONNECT
Jean-Francois Genat, Herve Grabas, Eric Oberla August 2d 2010
Presentation transcript:

MS, LG, XS PXL ladder tests at IPHC, May 1-7, Preliminary Ladder Testing Results (part 2) At IPHC MS, XS, LG

MS, LG, XS PXL ladder tests at IPHC, May 1-7, Outline New running conditions Noise and FPN Offset variation Normal readout mode – Self-induced noise – Ladder induced noise

MS, LG, XS PXL ladder tests at IPHC, May 1-7, New running conditions Using EX354RT lab power supply for VDD ladder and VDD buffers. – Developed noise pickup (?) that triggers overcurrent protection on our standard power modules Added 9 × 100 nF decoupling capacitors on VDD (1 per sensor, except for sensor 5) Bypassed bond wires for VDD and GND

MS, LG, XS PXL ladder tests at IPHC, May 1-7, New running conditions Thick sensor cable HIGH threshold settingsLOW threshold power supply3.68 (term. 3.65) (MTB 3.318) 3.68 (term. XX) (MTB 3.317) Sensor power Driver power Begin low mass section GND8 mV9 mV power End of ladder power End of ladder GND29 mV32 mV

MS, LG, XS PXL ladder tests at IPHC, May 1-7, Noise

MS, LG, XS PXL ladder tests at IPHC, May 1-7, FPN

MS, LG, XS PXL ladder tests at IPHC, May 1-7, Noise  FPN

MS, LG, XS PXL ladder tests at IPHC, May 1-7, Offset variation

MS, LG, XS PXL ladder tests at IPHC, May 1-7, Normal mode readout: self-induced noise 9 5×5× -1 mV-2 mV-3 mV A B45233 k2.3 M2.7 M C1.0 k33 k2.3 M2.6 M D k5.6 k5.7 k Sensor 2, others HIGH thresholds (sub-array A fixed 5×  )

MS, LG, XS PXL ladder tests at IPHC, May 1-7, Ladder induced noise Sensor 2, others LOW thresholds Sensor 2 thresholds: 5× , - 1 mV, -2 mV

MS, LG, XS PXL ladder tests at IPHC, May 1-7, Summary Significant improvement with 9 decoupling capacitors Additional testing needed with full capacitor complement – Including repeatability Implications for ladder design: – TBD but likely a separate-power cable version