THEMATIC CALL FOR PROPOSALS GUIDANCE SESSION BUDGETING REQUIREMENTS.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

International Aid Transparency Initiative (IATI) TAG Overview October 2010.
1 Unit C3 Finance, legal Affairs and Partner support CALL FOR PROPOSALS APPLICATION PROCEDURE SPECIFIC ADMINISTRATIVE AND FINANCIAL ISSUES Version
PROJECT REVIEW GROUP Session E1. Does the goal align with the purpose of the institution? Are the objectives realistic and achievable? Is the quality.
1 Project Design Module 5 Session 5. 2 Summary This session provides introduction to project preparation, project documents, and checklist for questions.
INTERREG and Tacis budgets Main differences: No breakdown of the Tacis budget between the partners is required; No strict limits for the project management.
Covenant Foundation Full Proposal Budget.
1 Process of Data entry in Budget Proformae. 2 Outline General Instructions Proforma – A:Receipts Proforma – B1:Expenditure Non Plan Proforma – B2:Expenditure.
Ninth Replenishment of IFAD’s Resources Draft Resolution: Revisions made since the 2 nd Session of Consultation October 2011.
ClASS DEBRIEF SESSIONS PROVIDING EFFECTIVE FEEDBACK.
Documenting Cash and In-Kind Match Project Director Training & Annual Meeting.
 In 2011 OPM formed the CFC-50 Commission to: ◦ Review the present structure and current processes of the CFC ◦ Recommend improvements to regulations.
Key issues in project reporting Jakub Rutkowski Project Annual meeting , Hannover.
Financial and legal aspect in the context of proposal preparation Marija Šola, MSc. Project manager University of Belgrade School of Electrical Engineering.
Performance Monitoring and Financial Reports Performance Monitoring and Financial Reports UNAIDS and Unified Budget and Workplan (UBW)
Programmatic and Fiscal Compliance as a Team Effort 2014 Project Director Training & Annual Meeting1.
1. HOW TO WRITE AWARD- WINNING GRANT PROPOSALS 2.
13 January 2011 Country Launch – 2011 Survey on Monitoring the Paris Declaration Role of Donors.
IHP+: introduction and ministerial review Action for Global Health Conference Strengthening Accountability to Achieve the Health MDGs Madrid, 7 th June.
IMPLEMENTING AN ACTIVITY BASED BUDGET SYSTEM PRESENTATION BY MATTHEW DINGIE DIRECTOR OF BUDGET, MOFED.
UNIDO Green Industry Platform Prep- Meeting Vienna, 3. Mai 2012 Heinz Leuenberger PhD Director, Environmental Management Branch.
Chapter 4: Project Cost Management
© Tilitonse 2014 BUDGETING GUIDELINES By Alex Mchawe Mkandawire Fund/Finance Manager.
Process Assessment Method
SESSION 3: FROM SETTING PRIORITIES TO PROGRAMMING FOR RESULTS.
DESA Preparations for the 2012 Quadrennial Comprehensive Policy Review of the General Assembly Surveys of Governments, UN country teams, and civil society.
Academy of Finland September call Research and Innovation Office.
EuropeAid How to benefit from EC grants? ‘Calls for Proposals’ Thematic Operations EuropeAid Cooperation Office.
Technical Assistance for Civil Society Organisations Regional Office This project is funded by the European Union Regional Training on 'Development & Management.
Memorandum of Understanding RD-51 Collaboration 1MPGD-WS, NIKHEF April 2008H.Taureg.
Planning for Sustainable Action Projects inspired by the Earth Charter.
 Check Job description for accuracy.  Ensure expectations are mutually understood.  Keep notes and other documentation.  Review progress frequently.
1 Briefing Session on Application for Fee Revision for the 2012/13 School Year by DSS Schools Submission of budget and financial information MA Section.
Developing a Project Proposal - SPROUT - ACTRAV-Turin.
APC Mid-Term Assessment APC LAC Member Meeting, Montevideo, November 2006 Anriette Esterhuysen.
INTRODUCTORY SECTIONS
Introductory Session: Welcome to the Universal Standards Implementation Series Speaker: Yamini Annadanam 16 October 2014.
Program Planning and Budget Amy Wilson Senior Program Officer International Education Programs Service.
BOSNIA AND HERZEGOVINA Ministry of Finance and Treasury Donor Coordination Forum Meeting The Report on progress on Adherence to the Principles of the Paris.
Developing a Project Proposal ACTRAV-Turin. Contents Concept of “Logical Framework Approach” SPROUT – model project proposal Individual activity Presentation.
ESS GUIDELINES ON REVISION POLICY AND IMPACT STUDY IN NA AND BOP Hans Wouters EUROSTAT.
1 January 2005 Introduction to Phase 2 and General Update Lesotho CCM.
Effective Groups and Teams chapter fifteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
The Nuts and Bolts of Budgets for Corporate Clients Eric Walker
Support to National REDD+ Action: Global Programme Framework (SNA) Work Plan and Budget 2015 Information and Knowledge Sharing Sessions Twelfth.
Project design – Activities and partnership CENTRAL EUROPE PROGRAMME Project development seminar Prague, 1-2 February 2010 Monika Schönerklee-Grasser.
Annual Interreg meeting 06 June 2016 #EUBudget4Results 1.
A project funded by the European UnionImplemented by a consortium led by Get ready for the call! Next steps for building partnerships and developing a.
Session IX: Elements of Project Proposal
4 - 8 November 2013 AIM relevant - Assembly conclusions
Progress & Challenges in Aid Co-ordination & Delivery
Impact-Oriented Project Planning
Small Charities Challenge Fund (SCCF)
Version 0.1Assessment Method Overview - 1 Process Assessment Method An objective model-independent method to assess the capability of an organization to.
Financial Reporting for SCCF
Draft Resolution: Revisions made since the 2nd Session of Consultation
11/18/2018 ANNUAL performance PLAN (2018/19) NATIONAL DEVELOPMENT AGENCY PORTFOLIO COMMITTEE – 02 MAY 2018.
CLINICAL INFORMATION SYSTEM
Multi-Sectoral Nutrition Action Planning Training Module
TANGO Project Finances
Developing a Work Plan with Outputs and Outcomes
12/5/2018 ANNUAL performance PLAN (2018/19) NATIONAL DEVELOPMENT AGENCY Select COMMITTEE – 19 June 2018.
Small Charities Challenge Fund (SCCF)
THE UNITED NATIONS GREAT LAKES REGIONAL STRATEGIC FRAMEWORK
SCCF Narrative Reporting
Conceptual framework of the Aid on Budget Study CABRI
Progress Report on proposed GUID on Information TECHNOLOGY Audit
Managing Your Federal Grant Award
Session 4: Finalize Project Working Arrangements
Presentation /13 Budget Allocation
Presentation transcript:

THEMATIC CALL FOR PROPOSALS GUIDANCE SESSION BUDGETING REQUIREMENTS

BUDGET REQUIREMENTS Ensure budget Outputs, Activities and Sub-activities align to Results Framework; Ensure realistic estimates and put more resources towards achievement of results than overheads; Ensure budgets are well detailed, showing number of units and unit cost. Avoid putting lump sum figures; Unit costs for allowances should conform to provisions of Revised Harmonized Donor Rates effective 1 October 2015.; Put budget values in both Malawi Kwacha and British Pound at K900/GBP exchange rate;

BUDGET REQUIREMENTS Provision of personnel costs should align to a members level of effort contributing towards the project; Personnel Costs should align to the existing organization's salary structure; Where a sub-grantee will be involved, separate budget lines for Lead partner’s activities and Sub-grantee activities. Further, include a separate budget for sub-grantees; Check Mathematical accuracy; Include Cashflow Statements that align with workplan. Important for outlining disbursement schedule in the grant agreement.

THANK YOU