2010 Construction Contract Standards Training Part 2 TOOLS October 2012.

Slides:



Advertisements
Similar presentations
Word Lesson 7 Working with Documents
Advertisements

Mapping Site Instruments. Introduction The Mapped Instrument is a tool that guides you in matching your site specific Instrument and materials to the.
OneOffice is the basis of recording and documenting all pay quantities. Pay quantities may be entered directly into OneOffice or transferred from other.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
NSSP Guidance for the 2010 Standards Concept for Specification Format Example: Section C(2) is assigned to falsework shop drawings. The following.
Pasewark & Pasewark 1 Word Lesson 7 Working with Documents Microsoft Office 2007: Introductory.
Word Lesson 7 Working with Documents
2010 Construction Contract Standards October 2011.
2015/6/301 TransCAD Managing Data Tables. 2015/6/302 Create a New Table.
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
Microsoft Office Word 2013 Expert Microsoft Office Word 2013 Expert Courseware # 3251 Lesson 4: Working with Forms.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
Gasoline and Diesel Event User Guide. Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
© 2002 ComputerPREP, Inc. All rights reserved. Word 2000: Working with Long Documents.
2010 Construction Contract Standards Training Part 2 TOOLS November 2011.
Payer User Group Webinar – 7/31/2014. Agenda Welcome (5 minutes) ◦Opening Comments/ Review ◦Meeting Goals Chapter 243 Changes (25 minutes) ◦Clarification.
Quantities 2 Plans Prepared by Heath Bielefeldt Wisconsin Department of Transportation
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
Jason Martin February 2013 Design Section Engineer’s Manual 1.
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
AASHTO Estimator Presentation Introduction Obtaining an Estimator Account Log in Estimator Set up Global Options Opening a catalog New items Special Provisions.
| | Tel: | | Computer Training & Personal Development Microsoft Office PowerPoint 2007 Expert.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
2010 Construction Contract Standards Training Part Standard Specifications November 2011.
Teacher’s Assessment Assistant Worksheet Builder Starting the Program
1 RMS-QCS Introduction April RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Document Supplements: All the Parts of “Large” Documents Dr. Jennifer L. Bowie Document Design Some information from Lannon.
QUT Library EndNote : Managing images. Adding images to EndNote records With EndNote Version 7, images may be embedded within records The Figure, Chart.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Microsoft Access 2010 Chapter 10 Administering a Database System.
1 CA201 Word Application Making Information in Longer Documents Accessible Week # 12 By Tariq Ibn Aziz Dammam Community college.
Maintenance Specifications For Jan and beyond.
Priced Proposal Training October/November 2015 DEPARTMENT OF TRANSPORTATION.
Chapter 9 Creating a Reference Document with a Table of Contents and an Index Microsoft Word 2013.
GRANT AMENDMENTS Processes and Procedures Robert Compton- Field Services Representative  9/10/2015.
2010 Construction Contract Standards Training Part 2 Prototype October 2011.
MnDOT Intelligent Transportation Systems Project Management Design Course Section 5: Special Provisions.
2010 Construction Contract Standards Training Part 2 BUSINESS PRACTICES FOR PREPARING 2010 CONSTRUCTION CONTRACTS October 2012.
Microsoft Office 2013 Try It! Chapter 4 Storing Data in Access.
Payer User Group Webinar – 7/31/2014. Agenda Welcome (5 minutes) ◦Opening Comments/ Review ◦Meeting Goals Chapter 243 Changes (25 minutes) ◦Clarification.
Academic Computing Services 2007 Microsoft Word 2010 Publishing Long Documents This Guide will teach you how to work with long documents such as dissertations.
Text2PTO: Modernizing Patent Application Filing A Proposal for Submitting Text Applications to the USPTO.
Office of Sponsored Projects Federal Updates/Reminders ROUNDTABLE FEBRUARY 9, 2016 CAMPUS.
Lesson 17 Mail Merge. Overview Create a main document. Create a data source. Insert merge fields into a main document. Perform a mail merge. Use data.
Applying References and Hyperlinks
2016 Program Terms Report EHB Submission System Guide
General Adult Education and
Product Training Program
Tender Creation Process
T3/Tutorials: Data Submission
Chapter 8 Specifications & Special Provisions
Bulk Fuel,Gasoline and Diesel Event User Guide
Chapter 8 Specifications & Special Provisions
* Topic 12 Special Provisions
Software Documentation
Acceptance Process for Manufactured Products by Certification:
Unit I: Developing Multipage Documents
Designers’ Manual Overview and Chapter Contents
Completing the State Aid Payment Request
Caltrans 2010 standard specifications
Word Lesson 7 Working with Documents
Benchmark Series Microsoft Word 2016 Level 2
Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall.
2020 Census Local Update of Census Addresses Operation (LUCA)
5.00 Apply procedures to organize content by using Dreamweaver. (22%)
Presentation transcript:

2010 Construction Contract Standards Training Part 2 TOOLS October 2012

This training is to provide you an Overview of Existing and the New Tools 2010 Bid Item List Index for 2010 SSPs SP_TEMPLATE

2010 Bid Item List Internet/Intranet: located under Guidance Documents In Excel files by alpha and numeric Bid Item List Updates file updated Sept. 2012

2010 Bid Item List (Continued) Database: use FMPro OE access key located under HQ Const. Stds. tab updated Sept. 2012

2010 Bid Item List (Continued) Contract Item Codes Supplemental Work & State Furnished items will continue to use 2006 information

2010 Bid Item List (Continued) Contract Item Codes/Bid Item List List of all coded contract items Non-standard items continue to be handled as before. Numeric/alpha code ~ A Do not use old one-time numbers provided by Award unit. One-time numbers begin with zero ~ Obsolete/old item codes are not to be used

2010 Bid Item List (Continued) Information listed: Item No Partial or Final Pay Item (P/F): use as guidance only (for partial pay and final pay items refer to RTL Guide) Item Description Unit Pay: unique item description and payment Section: is set forth by bid item updated Sept. 2012

2010 Bid Item List (Continued) Practice of Reviewing: Use posted version of the 2010 Bid Item List Compare district Engineers Estimate to the 2010 Bid Item List and verify if all BEES items are valid Some items have complete item code changes Example: Sand Cover – (before ) Listed bid item enacts specification Non-standard bid item: use SSP which contains table to list all non-standard bid items

Index for 2010 SSPs Internet: located under the ssp index folder SPs/2010-SSPs Information listed: 2010 SSP No. Owner Code Category & Date Description Instructions for Sections updated Sept. 2012

Index for 2010 (Continued) Follow index order when assembling applicable SSPs ~ numerical sequence Special Notices (SN) Most are automated Those that need to be manually inserted must be submitted as a separate word document Standard Plans List (StdPln) Inserted before SP_TEMPLATE updated Sept. 2012

Index for 2010 (Continued) RSS: Revised Standard Specifications (formally known as Amendments) Inserted by boiler SP_TEMPLATE: Base template to build project : Bid item and applicable section Some additional information on SSPs: Railroad Relations – SSP & RSS (section C) Search for conditional Instruction for inclusion of StdPln – find under the historical SSP ~ design guidance updated Sept. 2012

SP_TEMPLATE: Internet: located under the ssp_read first folder SSPs/2010-SSPs/ Base template for creating SSP package Insert special provisions (SP) between corresponding headings and caret separations Do not renumber Divisions or Sections No longer necessary to sequentially number SSPs

SP_TEMPLATE (continued): Spacing and carets between Divisions and Sections Shorter carets – sections; longer carets - divisions

SP_TEMPLATE (continued): Strike & Hide (S&H) divisions and section headings along with carets Do not renumber remaining sections S&H introductory statement (RAD – Replace, Add, Delete) when S&H paragraph Introductory statement updated Sept. 2012

SP_TEMPLATE (continued): Example of insertion and S&H (deletions)

SP_TEMPLATE (continued): Insert StdPln: before SP_TEMPLATE Un-strike & hide Std Plan sheets Insert : List bid items and applicable sections that do not correspond to spec section or for those with non-standard items Items are in table format Un-strike & hide bid items Non-standard item added to the bottom of table

SP_TEMPLATE (continued): SPP (continued): Bid items that do not correspond to applicable spec sections Un-strike & hide bid items Example - item and first two digits do not match section updated Sept. 2012

Base Template (continued): SPP (continued): Non-standard item and it’s one-time code List items with numeric/alpha code, description and applicable section at bottom of table Replace item code with one-time item code If an addendum revises non-std item code, SSP will need to be revised as part of the addendum

2010 & 2006 review Install specification templates 2010_template - located under templates 10_temp.php 2006_SSP_template - located under templates atest_templates_macros/ atest_templates_macros/ Install normal and macro2007: same for both 10_temp.php atest_templates_macros

2010 & 2006 review (cont.) Styles – use Style Guide 2010 Bid Item List - NEW Item codes for SW & SF are same as 2006 SP_TEMPLATE - NEW NEW 0-RSS - Revised Standard Specifications Submittal of subsequent documents should be a separate word file Discourage use of document map

QUESTIONS?