Design Manager: Chris Thomas CEAL July 17, 2013. Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Joe Rouse California Department of Transportation Division of Traffic Operations Office of System Management Operations.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
CEM-512 Value Engineering Highway Project: South Interchange.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Newmarket Viaduct Replacement STAGED VIADUCT CONSTRUCTION / DECONSTRUCTION PROCESS PROJECT DELIVERY BY NGA NEWMARKET.
West Contra Costa Unified School District
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
Environmental Assessment Public Meeting
Signs Keep it Simple. Which are on ramps? Exits?
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
CALTRANS DISTRICT 7’S CAPITAL IMPROVEMENT PROGRAM Providing a safe, sustainable, integrated and efficient transportation system to enhance California’s.
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
I-65 Added Travel Lanes Project in Tippecanoe County
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
Southern Nevada HOV Plan Update ITE Luncheon July 17, 2014 Jeff Lerud, Project Manager.
Goods Movement and Traffic Issues In the SACOG Region The Effects of Congestion on Goods Movement in our Region February 9, 2006 Jason Crow.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Metric to English Conversion California Bridge Construction Forum March 8, 2006 Mark Leja, Chief, Division of Design California Department of Transportation.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Visit Our Website at: Click to edit Master title style.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Arizona Forward Update
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Interstate 15 North 4/09/2015 Update
Interstate 15 North Phase 4
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Jeffrey Keirn Illinois Department of Transportation
Highway 169 Bridge Replacement & Pavement Resurfacing
Upcoming Major Projects Nevada Transportation Conference April 9, 2013
SE 12th Street Roadway Improvements February 8, 2005.
projects update ATLANTA district
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
Metropolitan District | mndot.gov
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Design Manager: Chris Thomas CEAL July 17, 2013

Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project

Westbound I-8 to Northbound I-5 Connector is overcapacity. This causes traffic to back up onto Westbound I-8. Purpose is to improve the existing and future traffic operations at this location while minimizing environmental impacts.

September 2007 performed VA Study to brainstorm and evaluate various alternatives. Baseline Study: Restripe Connector and add auxiliary lane to the Balboa Avenue/Garnet Avenue Interchange. The VA Alternatives Studied included;  Widening I-5 only to SeaWorld Dr  Restriping on I-8 on the outside from Morena Blvd to connector to add 1 lane  Eliminating entrance to I-8 West from Taylor and extend exit only lane to make 2 lanes to I- 5 South and 2 lanes to I-5 North  Labeling Pavement Lanes to Direct Traffic to Correct exit  Developing Automatic warning system for the developing queue east of Taylor  Adding/Relocating overhead signs east of Taylor St directing traffic to I-5  Restriping existing Tecolote Bridge reducing/eliminating shoulders and not widening the structure

Most Value Added Proposal California Department of Transportation District 11 I-8 West to I-5 North Connector Widening Pre-Construction Engineering $25 -$75 million Presented by the AASHTO Value Engineering Technical Committee August 31, 2009 For Demonstrating Outstanding Value Engineering Achievements in Teamwork, Cost Savings, Enhanced Performance, or Expedited Project Delivery That Resulted in an Overall Improved Project

Restripe Westbound I-8 to Northbound I-5 direct connector ramp from one lane to two 11’-6” lanes. Replace left overhang of structure. Replace both bridge rails to current standards. Reduce lane and shoulder widths on I-5 at various locations. Add an auxiliary lane from the I-8 to I-5 connector ramp to just north of the connector ramp to north of Sea World Drive.

The Regional Transportation Plan (RTP) has identified a need to add an HOV lane to I-5 in each direction and convert the 8-lane freeway to a 10-lane freeway. The City of San Diego is sponsoring improvements to the I-5/Sea World Drive Interchange. A Project Study Report was approved on December 14, 2010 with an estimated total project cost of $106 million. Both projects are compatible with the ultimate design.

Project Report and Environmental Document Approval Completed on February 1, Design Phase was completed on April 29, Construction is anticipated to begin Fall Total estimated cost of the project is $18.7 million.