Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Superconducting Spoke Resonator Cavities and Cryomodules
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
F HINS Schedule of Activities in Meson During FY08 Bob Webber AD Safety Meeting December 5, 2007.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
ANL-FNAL Collaboration on High Intensity Neutrino Source Activities G. Apollinari Introduction Collaboration Activities ‘05-’07 Achievements ’07-’10 Plans.
FNAL Superconducting RF Program Bob Kephart. Goals of the Fermilab SRF Program Support the strategic goals of the U.S. HEP program  Energy frontier:
Fermilab High Intensity Neutrino Source R&D Program - Mission, Status, Plans, and Support Needs - For AD Department Heads March 2007 Bob Webber.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
Alexander Aleksandrov Oak Ridge National Laboratory
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
HINS R&D Giorgio Apollinari Fermilab Accelerator Advisory Committee May 6-8 th, 2008.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
F. f 2 Definitions Proton Driver –Generic name for past ~15 years for new, higher intensity machines and schemes to replace present Linac and Booster.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
CW Linac Lattice August, 29 N.Solyak, B.Shteynas.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
HINS Status and Strategy/Plans with Respect to Project X Bob Webber AAC Meeting November 16-17, 2009.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
INTRODUCTION The Fermilab High Intensity Neutrino Source (HINS) program has been developing 325 MHz superconducting spoke resonator accelerating cavities.
SC Activities at IAP Frankfurt
WP5 Elliptical cavities
ESS RF Development at Uppsala University
1- Short pulse neutron source
High Intensity Neutrino Source R&D Overview
ADS Accelerator Program in China
LINAC4 commissioning plans etc.
Electron Source Configuration
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
MEBT1&2 design study for C-ADS
Physics Design on Injector I
RF introduction Anders Sunesson RF group leader
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber

2HINS R&D Overview and Status – August 26 Introduction and History The High Intensity Neutrino Source (HINS) R&D Program is an effort that began in late 2005 to demonstrate the application of technologies that are innovative for a low-energy, high-intensity hadron beam linear accelerator HINS is a moderate R&D effort at ~7-8M$/year HINS technology is the likely candidate for the front-end of the proposed Project X Linac Project X expects the HINS program to deliver: –A prototype 66 MeV Linac operating at 325 MHz providing a 27mA beam with a 1 msec pulse length

3HINS R&D Overview and Status – August 26 Specific HINS R&D Objectives Develop and apply high power RF vector modulators to control amplitude and phase of multiple cavities powered by a single klystron to accelerate beam from 2.5 MeV Produce, accelerate to 60 MeV, and measure an axially- symmetric beam focused by superconducting solenoids Accelerate beam from 2.5 to 10 MeV with room-temperature crossbar spoke cavities Accelerate beam from 10 to 60 MeV using superconducting (SC) single spoke resonator (SSR) RF structures Demonstrate high-speed (nanosec) beam chopping at 2.5 MeV This makes HINS a first-of-a-kind superconducting 60 MeV H- linac

4HINS R&D Overview and Status – August 26 HINS Operating Parameters ParticleH+ then H- Nominal Bunch Frequency/Spacing MHz nsec Particles per Pulse37.5 *E13 Pulse Length3/1msec Average Pulse Current~20mA Pulse Rep. Rate2.5/10Hz Chopping 89KHz and 53MHz % Bunch Current32mA Bunch Intensity E8 pCoul * full un-chopped 3 msec pulse at klystron-limited 20 mA

5HINS R&D Overview and Status – August 26 HINS Linac Sections 50 keV ion source (initially protons, ultimately H-) 2.5 MeV 325 MHz vane-type RFQ Medium Energy Beam Transport (MEBT) –Three superconducting solenoid magnets –Two 325 MHz buncher cavities –Fast beam chopper 2.5 – 10 MeV Room Temperature (RT) Cavity Section –Sixteen 325 MHz room-temperature crossbar-H spoke cavities –Sixteen superconducting solenoids 10 – 60 MeV SSR1 and SSR2 Cavity Section –Two cryomodules each with nine SSR1 β= MHz superconducting spoke cavities and nine superconducting solenoids –One cryomodule with eleven SSR2 β= MHz superconducting spoke cavities and six superconducting solenoids

6HINS R&D Overview and Status – August 26 Ion SourceRFQMEBTRoom Temperature 16-Cavity, 16 SC Solenoid Section One Β=0.4 SSR 11-Cavity, 6-Solenoid Cryostat Two Β=0.2 SSR 9-Cavity, 9-Solenoid Cryostats 2.5 MeV50 KeV10 MeV 20 MeV 30 MeV HINS Layout 60 MeV ~14 meters

7HINS R&D Overview and Status – August 26 HINS RT Section Layout RFQ dimensions are mm MEBT Start of first SSR1 Cryostat Ion Source Final 7 of 16 cavities/solenoids in Room Temperature Linac Section

8HINS R&D Overview and Status – August 26 HINS SSR Section Layout SSR1 Cryomodule #1 9 solenoids/9 cavities dimensions are mm SSR1 Cryomodule #2 SSR2 Cryomodule #1 6 solenoids/11 cavities SSR1 Cryomodule #2 HINS includes two SSR1 Cryomodules and one SSR2 Cryomodule

9HINS R&D Overview and Status – August 26 RF Component Test Facility Ion Source and RFQ Area 150 ft. Cavity Test Cave 60 MeV Linac Cave Klystron and Modulator Area Existing CC2 Cave ILC HTC Cave HINS Floor Plan in Meson Building

10HINS R&D Overview and Status – August 26 HINS Transverse Beam Parameters at 15 mA 100% RMS mm MEBT Room Temp LinacFirst SSR1 Cryomodule

11HINS R&D Overview and Status – August MW, 325 MHz klystron RF power source is operational HINS RF Component Test Facility is operational Room temperature cavity RF conditioning is in progress; four cavities are on hand, the remaining 12 now being fabricated First SC spoke cavity tested in Vertical Test Stand (VTS) in March ’08; three more cavities and first helium vessel are in production Proton ion source is installed in the Ion Source/RFQ Area RFQ is fabricated and delivery is expected within 2-3 weeks Superconducting solenoid magnets for RT section are being fabricated and cryostat procurement has begun Cavity test cryostat necessary for full pulsed-power testing of individual SC spoke cavities is being fabricated and will be complete this year HINS Status

12HINS R&D Overview and Status – August 26 HINS Proton Ion Source and LEBT Ion Source Control and High Voltage Racks Ion Source and LEBT

13HINS R&D Overview and Status – August 26 HINS 325 MHz RFQ Successful field measurement bead-pull test was completed 6/17

14HINS R&D Overview and Status – August 26 HINS RT Cavity & Vector Modulator HINS Room Temperature Cavity High-power Vector Modulator 13 dB Amplitude Control with Vector Modulator for 6 kW 3.5 msec RF Pulse Red trace is cavity RF amplitude; blue and yellow are vector modulator bias currents

15HINS R&D Overview and Status – August 26 Vector Modulator Performance with Cavity at High Power 155 Degree Phase Control with Vector Modulator for 6 kW 3.5 msec RF Pulse Red trace is cavity RF phase signal; blue is vector modulator bias currents 20  s /28.5  s =4.2 0 /  s 120 Degree Phase Control with Vector Modulator for 300A current change in Vector Modulator Solenoid Red trace is cavity RF phase signal; yellow is vector modulator bias currents

16HINS R&D Overview and Status – August 26 RT Section Solenoid & Cryostat Cryostat and Insulated Cold Mass “Last” weld Solenoid Magnet Prototype RT superconducting solenoid and cryostat are complete Testing is underway Production solenoids and cryostats are in process

17HINS R&D Overview and Status – August HINS SC Spoke Cavity at VTS SSR1-01 Vertical Test Q vs. E Accelerating Gradient MV/m O Dressed Cavity Operating 4K

18HINS R&D Overview and Status – August 26 Cavity Test Cryostat Vacuum Vessel RF Power Coupler Flange and DesignCavity Support Post Piping DesignThermal Shield

19HINS R&D Overview and Status – August 26 RT Section Support Girders

20HINS R&D Overview and Status – August 26 Component Fabrication and Testing Plans Oct 08 – Test second superconducting spoke cavity in VTS Oct 08 – Complete assembly of cavity test cryostat Nov 08 – Receive remainder of room temperature cavities now in fabrication Nov 08 – Join first SSR1 SC spoke cavity to helium vessel Jan 09 – Assemble and demonstrate control of a two- cavity/vector modulator system at high power (w/o beam) Jan 09 – Install cryogenics for cavity test cryostat Mar 09 – Test first SSR1 cavity to full pulsed power Summer 09 – Complete assembly and testing of SC solenoids and cryostats for the room-temperature cavity section FY09 and early FY10 – Procure remaining complement of SSR1 cavities 2010 – Complete first SSR1 cryomodule

21HINS R&D Overview and Status – August 26 HINS Beam Staging 2.5 MeV operation –Temporary diagnostic/transport line and dump after RFQ –Diagnostic line components including beam absorber are on-hand –RFQ delivery, RFQ conditioning, and safety paperwork are critical path –Present goal for 2.5 MeV beam is Fall of this year Intermediate commissioning stage at >2.5 MeV and <10 MeV?? –MEBT plus first four? RT cavities Quadrupoles in lieu of SC solenoids due to cryo distribution system schedule –First test of RF distribution and vector modulator control with beam –Enclosure construction, MEBT buncher cavities and LLRF are critical path Full 10 MeV Room Temperature section operation –Early 2010 –Solenoid production and cryogenics system are critical path 20 MeV operation with first SSR1 cryomodule –Early 2011 SSR1 cavities, cryomodule and solenoids are needed Full 60 MeV operation –Late 2011 is very optimistic

22HINS R&D Overview and Status – August 26 Conclusion HINS promises to demonstrate the application of technologies that are innovative for a low-energy, high-intensity hadron linac HINS will demonstrate: –The performance and cost savings possible by powering many accelerating cavities from a single klystron –The performance of axially-symmetric focusing for improved beam halo and beam loss control –The acceleration of beam using superconducting spoke cavity structures from 10 MeV The program is actively building and testing components and integrating those into a novel 60 MeV linac

23HINS R&D Overview and Status – August 26 backups

24HINS R&D Overview and Status – August 26 HINS Plans Commissioning of RFQ and initial 2.5 MeV beam this fall Installation of test cryostat and cryogenics - January 09 Test first SSR1 SC spoke cavity to full pulsed power – March 09 Demonstrate control of a two-cavity/vector modulator system at high power – January 09 Accelerate beam through ‘a few’ room temperature cavities – Summer 09 Operation of full 10 MeV section – early 2010 First SSR1 cryomodule ready – end of 2010

25HINS R&D Overview and Status – August HINS RT Cavity and Vector Modulator Operating in Cavity Test Cave 13 dB Amplitude Control with Vector Modulator for 6 kW 3.5 msec RF Pulse Red trace is cavity RF amplitude; blue and yellow are vector modulator bias currents HINS Room Temperature Cavity High-power Vector Modulator

26HINS R&D Overview and Status – August HINS Ion Source and Injector