LG DATABASE AND REPORTING SYSTEM (LGDRS) 8-9 September 2015

Slides:



Advertisements
Similar presentations
NIMAC 2.0: The Accessible Media Producer Portal NIMAC 2.0 for AMPs.
Advertisements

NetDMR Electronic DMR Reporting
What is pCon.update With pCon.update it’s possible to install and have OFML data of several manufacturers always up to date. When an update is available,
NASFAA 2003: Reconnecting With Students!. 2 eZ-Audit – Electronic Submissions of Financial Statements and Compliance Audits Session #105.
Fibre Processing and Manufacturing (FP&M SETA)
Info Day on New Calls and Partner Café Brussels, 8 September 2010 How to apply – Budget and Reporting.
SCOA – One Information Session Project Plan and Key Milestones Presented by National Treasury: Chief Directorate Local Government Budget Analysis – 18.
Validation of Participants
What is the ? Final, peer-reviewed journal manuscripts that arise from NIH funds must be submitted to the NIH Manuscript Submission System (NIHMS) for.
Emission Statement Update & RADIUS 4.0 Danny Wong April 10, 2013 ACE Academy 1.
Employee Self Service (ESS) Version Employee Self Service  access from any computer  view their elected withholding, earnings summary, check.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
CTRP User Call April 3, 2013 Gene Kraus CTRP Program Director.
PCT-SAFE and e-Services developments Webinar September 7/
mSCOA : Position Paper – Reporting (Draft)
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
Board of Canadian Registered Safety Professionals Certification Maintenance Online Tool BCRSP introduces a new web-based tool to assist certificate holders.
Lead Management Tool Partner User Guide March 15, 2013
LENOVO SERVICES Ordering & registering services warranty May 2011 ChoonHa Phoon Lenovo Service Offering : ThinkPlus and Lenovo Care.
National Oesophago-Gastric Cancer Audit Clinical Audit Platform How to Register, Submit and View Reports CAP: |
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
Greta Robertson Kathy Hoffman /11/2011 SCEIS Finance Automated Interfaces.
Portal User Group Meeting June 13, Agenda I. Welcome II. Updates on the following: –Migration Status –New Templates –DB Breakup –Keywords –Streaming.
What’s New with the Emission Statement Program? 11 TH ANNUAL REGULATORY UPDATE CONFERENCE Danny Wong October 12, 2012.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Alito Procurement Supplier User Guide Contents: 1.How to Register/Log-inHow to Register/Log-in 2.How to Register your InterestHow to Register your Interest.
Using the Supplier Portal Updated September 12, 2011 Using the Supplier Portal.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
Tutorial Contents Text Cut/Paste & Format OhioLINK ETD Home UT ETD Home ETD Entry Form UT Grad School University Libraries ETD Guide OhioLINK Electronic.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
FP6 IT System 1 ELECTRONIC PROPOSAL SUBMISSION SYSTEM.
Mtivity Client Support System Quick start guide. Mtivity Client Support System We are very pleased to announce the launch of a new Client Support System.
Integrated Consultative Forum (ICF) Panel Discussion – Questionnaire 8 September 2015 Presented by National Treasury: | 8 September 2015.
INDICIUM SYSTEM DG Module January Contents How to Access the Indicium System How to register as a New Stakeholder and all the requirements How Link.
National Workshop on ANSN Capacity Building IT modules OAP, Thailand 25 th – 27 th June 2013 KUNJEER Sameer B Exercise on online nomination process & suggestions.
Upay User Guide WELCOME TO UPAY This guide is aimed to help you to use the Upay website. To launch Upay you will need to navigate to
Advanced NIMAC for Authorized Users 1www.nimac.us.
NIMAC for Accessible Media Producers: February 2013 NIMAC 2.0 for AMPs.
Pennsylvania Information Management System (PIMS) PIMS Cognos Reporting Instructions December 2007.
Electronic – Statutory Financial Return (E-SFR) Timae Flood Bermuda Monetary Authority.
Stage 1: STUDY PREPARATION 1www.ihpa.gov.au. STUDY PREPARATION OVERVIEW Steps required to prepare for the study implementation.
Essex Insight Introduction to Essex Insight Training Guide Source: Research and Analysis Unit v4.
Submissions to the LGDRS 11 July 2016
mSCOA COMPLIANCE – ARE YOU READY?
Progress Project Tracking for EGEE Kasia Pokorska, CERN IT-AIS-PM
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
mSCOA Project Phase 4: Change Management and Transition
The University of Delaware Higher Education Consortia
Partner Smart Assist Service
ERO Portal Overview & CFR Tool Training
IMFO mSCOA: Where are we now? WHERE ARE WE GOING?
Submissions to the LGDRS 11 July 2016
mSCOA Reporting Reference Group 2 March 2017
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
AmeriCorps Member Tutorial – OnCorps Reports 2.0, Standard Reports
Non-Financial Data Uploads
Manual for Supplier Registration
Expanded Clearinghouse Initiative
MSCOA F.A.Q PORTAL Presented by National Treasury: Cornéll Botha – 2 March
Vendor Portal Registration Procedures
mSCOA F.A.Q PORTAL QUERY STATISTICS
WP 4 - Revision of Natura 2000 dataflow
mSCOA Project Phase 4: Change Management and Transition
Registrations of Municipalities on the LG Upload Portal
THE DEVELOPMENT AND STRUCTURE OF INDICATORS FOR FINANCIAL REPORTING DASHBOARDS ] mSCOA Vendor Forum: 18.
EMS &Trauma Registries Update
Health & Consumers DG SANCO Unit A.4 Information systems
CFR Enhancement Session
mSCOA Reporting Reference Group 3 May 2017
Using AIM (for Instructors)
Presentation transcript:

LG DATABASE AND REPORTING SYSTEM (LGDRS) 8-9 September 2015 Presented by National Treasury: Cornéll Botha – 9 September 2015 1

Road Map – where we are now LG DATA BASE Configuration and amendments to the LG Database, based on the SCOA classification framework Testing of in-year reporting based on refined LG Database Development and testing of report extraction Change management associated with redeveloped LG Database Continuation with in-year reporting framework, verification, and publications including piloting municipalities

Progress to date Upload portal for both financial batch submissions and documents developed and implemented mSCOA FAQ database is now hosted at NT and have been updated for more stability and functionality The design and data flow for the storing and handling of financial information has been finalised The content and validation rules for financial batch files have been defined The communication lines and rules regarding delegation of authority has been discussed and will shortly be finalised SCOA Risk Matrix has been created and is also hosted by NT. It will be communicated as soon as it is available from outside, which SITA is finalising.

Work plan for the next 3 months The SQL database will be created and the validation rules implemented, The communication setup will be implemented based on the current contacts per municipality already available on the current database, The current contact database will be expanded to accommodate a wider base of entry points into the municipalities and metros, however, this is still a discussion point, The mSCOA tables will be moved from Excel to a SQL database and audit trails will be added, Translation of new format financial data into old reporting formats will be done for quality and accuracy checks, and Development of new reports will commence

Local Government Data UPLOAD System: collecting municipal data The municipal managers have to register to get access approval on the Local Government Upload portal. The web address is https://lguploadportal.treasury.gov.za The municipal managers have to register National Treasury

Local Government Data UPLOAD System: collecting municipal data National Treasury

Local Government Data UPLOAD System: collecting municipal data National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal Copy and sign on with forgotten (encrypted) password and change password National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal National Treasury

LG Data and Document Upload Portal Data Upload Requirements National Treasury

LG Data and Document Upload Portal DATA UPLOAD National Treasury

LG Data and Document Upload Portal Supporting Documents Upload Requirements The submission of Supporting Documents on the LG Data Upload portal requires that only single documents corresponding to the selection type available, be uploaded at a time. For example: Council resolutions or quality certificates may no longer be included in a budget document but must be uploaded as separate document. National Treasury

LG Data and Document Upload Portal Other Requirements 1) All municipal managers of participating pilot municipalities, who have not registered on the upload portal yet, are requested to register as soon as possible. 2) Approval of portal access can only be granted after registration. 3) Upload of files and documents can only commence after the municipal manager’s authorisation. Submission to the new portal should be synchronised with the current e-mail procedure. (MM) Register (NT) Approve (MM) Submit National Treasury

LG Data and Document Upload Portal Other Requirements 4) It is important that the pilot municipalities test the portal extensively, e.g. big documents (in PDF format), to assure quality of this interface. After a successful pilot phase, the portal can be rolled out to 278 municipalities. 5) The communication setup will be implemented based on the current contact details of the municipal manager. This poses a problem as the MM might not always be available. What and how to setup the communication process is a discussion point and consensus should be reached as soon as possible. Feedback from municipalities in this regard, will be valuable and highly appreciated. National Treasury has defined options and will take it up with Municipalities before finalisation. National Treasury

Municipalities may register to get access and mSCOA F.A.Q. Portal Municipalities may register to get access and approval on the MSCOA F.A.Q. database. The web address is http://mscoafaq.treasury.gov.za National Treasury

mSCOA F.A.Q. Portal *The user will receive a registration confirmation e-mail with a link to click on to access the F.A.Q. portal but will not be able to use it. *The administrator at NT to activate the account. National Treasury

mSCOA F.A.Q. Portal National Treasury

mSCOA F.A.Q. Portal National Treasury

mSCOA F.A.Q. Portal National Treasury

mSCOA F.A.Q. Portal National Treasury

mSCOA F.A.Q. Portal National Treasury

mSCOA F.A.Q. Portal National Treasury

LG Data and Document Upload Portal Contact me for any questions or problems you encounter with regards to the LG Upload Portal or the mSCOA FAQ portal for assistance. Cornell.Botha@Treasury.gov.za (012) 315 5359 082 449 4840 National Treasury

THANK YOU